KRISHNAKUNJ RESIDENCY

By KEDAR ASSOCIATES

RG-MH-47705 · RERA P52100020752 · Last updated on MahaRERA portal: 25 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedmoved 48 months from the original
32 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 97%
25 of 200Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

KRISHNAKUNJ RESIDENCY is a Others project by KEDAR ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100020752 on 8 May 2019. Possession is promised by 31 Mar 2029. The completion date has moved by 48 months from the original filing. 175 of the 200 units on this registration are recorded sold or booked, and 32 of 55 construction stages are filed complete.

At a glance

Project

  • NameKRISHNAKUNJ RESIDENCY
  • TypeOthers
  • Location
    • SINGHGAD COLLEGE ROAD
    • NEAR MAHESH GALEXY
    • Wadgaon Bk
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • RERA no.P52100020752
  • ReraGenie IDRG-MH-47705

Builder

  • NameKEDAR ASSOCIATES
  • Entity typePartnership
  • PartnersBALASAHEB VITTHALARAO JADHAV, YUVRAJ CHANDRAKANT JADHAV, CHAITANYA CHANDRAKANT JADHAV, RUSHIKESH SURESH JADHAV, SOPAN GAHINAJI LANKE

Key dates

this monthRegisteredMay 2019First promiseMar 2025Revised toMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 May 2019
  • Promised completion31 Mar 2029
  • Revised completionRevised to 31 Mar 2029 (originally 30 Mar 2025)
  • Buildings5 building records
  • Documents filed89 files

Current status

88%175 of 200 units booked
78.0%Work done, per cost certificate

Figures as on 25 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA1312671582
WING BNA131247047
WING CNA131271071
WING DNA00000
WING ENA1413000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 25 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 97%.

WING A82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING E71%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 25 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Closed/Covered133
BuildingClosed/CoveredTotal
WING A5454
WING B3030
WING C4949

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAMESH VITTHALRAO JADHAVWadgaon BkPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI16193.88
Proposed, not sanctioned12,197 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAVIWAR PETH ,PUNE
Estimated costRs 50.00 cr
Cost incurredRs 39.01 cr
Work done78.03%
BuildingWingEstimatedIncurred
WING DNARs 9.50 cr-
WING ENARs 9.50 crRs 9.03 cr
WING ANARs 8.65 crRs 8.65 cr
WING BNARs 8.65 crRs 8.65 cr
WING CNARs 8.64 crRs 8.64 cr
-NARs 5.06 crRs 4.05 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKHIRI BHIDE AND ASSOCIATES
EngineerGIRISH C DHAVAL
Chartered AccountantSHRIKANT MANTRI & CO
Chartered AccountantSunil Shamrao Nimbalkar
PartnerRole in project
KEDAR ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22052501218Mar 2025 → Mar 2029

Reason as filed by the promoterWe, Kedar Associates, the promoter of the project KRISHNAKUNJ RESIDENCY (Registration No. P52100020752) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We apologize for the delay in the completion of the project and the submission of this request. Due to financial difficulties and unavoidable circumstances the construction of building Wing D and Wing E (Mhada) are unable to complete on time. There are total 5 buildings out of which 3 buildings (Wing A, Wing B, Wing C) are completed and Occupancy Certificate received for these 3 buildings an

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate.pdf25 Aug 2026
Withdrawal Update Form 2File: Engineer certificate.pdf25 Aug 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf25 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A Engineer Certificate March 2026.pdf12 May 2026
Form 2A (FY 2024-2025)File: Form 2A_Krishnakunj_FY 2024-25.pdf12 May 2026
Withdrawal Update Form 1File: Architect Certificate.pdf11 May 2026
Withdrawal Update Form 1File: Architect Certificate.pdf11 May 2026
Withdrawal Update Form 1File: Architect Certificate.pdf11 May 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf11 May 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 Engineer certificate March 2026.pdf11 May 2026
Withdrawal Update Form 3File: CA Certificate.pdf11 May 2026
Withdrawal Update Form 3File: CA Certificate Signed.pdf11 May 2026
Withdrawal Update Form 3File: Form 3 CA Certificate March 2026.pdf11 May 2026
Withdrawal Update Form 1File: Architect Certificate.pdf28 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf28 Apr 2026
Withdrawal Update Form 3File: CA Certificate.pdf28 Apr 2026
Form 1File: Architect.pdf25 Feb 2026
Form 2File: Engg Certificate_30092024.pdf25 Feb 2026
Form 3File: Form 3 CA Certificate_30092024.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory_30092024.pdf25 Feb 2026
Form 1File: Architect.pdf25 Feb 2026
Form 2File: Engg Certificate_31122024.pdf25 Feb 2026
Form 3File: Form 3 CA Certificate_31122024.pdf25 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory_31122024.pdf25 Feb 2026
Form 1File: Architect.pdf22 May 2025
Form 2File: Engg Certificate_31032025.pdf22 May 2025
Form 3File: Form 3 CA Certificate_31032025.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory_31032025.pdf22 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf8 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf8 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf8 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate_30092024.pdf8 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate_31122024.pdf8 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate_31032025.pdf8 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_30092024.pdf8 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_31122024.pdf8 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_31032025.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory_30092024.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory_31122024.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory_31032025.pdf8 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Seprate bank account Disclosure.pdf5 May 2025
Deviation Report with respect to Allotment letterFile: Deviation_Allotement.pdf5 May 2025
Deviation Report with respect to model copy of AgreementFile: Deviation_ATS.pdf5 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Balasaheb Jadhav.pdf5 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Sopan Lanke.pdf5 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Vishal Lanke.pdf5 May 2025
Proforma of Agreement for saleFile: ATS Draft -RERA SUBMISION.pdf3 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Signed Form 5_2019-20.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form 5_2020-21.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed Form 5_2021-22.pdf4 Feb 2023
Layout approvalFile: 20220702012528_00001 Layout.pdf21 Dec 2022
Building plan approvalFile: 20220702012528_00002 Rev Building A.pdf21 Dec 2022
Building plan approvalFile: 20220702012528_ Rev Building A 1-4.pdf21 Dec 2022
Building plan approvalFile: 20220702012528_ Rev Building A 5-7.pdf21 Dec 2022
Building plan approvalFile: 20220702012528_ Rev Building B.pdf21 Dec 2022
Building plan approvalFile: 20220702012528_ Rev Building C.pdf21 Dec 2022
Building plan approvalFile: 20220702012528_ Rev Building E.pdf21 Dec 2022
Building plan approvalFile: 20220702012528_00016 Rev Parking Floors.pdf21 Dec 2022
Details of encumbrances concerned to FinanceFile: LATEST KEDAR SEARCH TITLE REPORT.pdf21 Dec 2022
Details of encumbrances concerned to LegalFile: LATEST KEDAR SEARCH TITLE REPORT.pdf21 Dec 2022
Copy of Layout Approval (in case of layout)File: 20220702012528_00001 Layout.pdf21 Dec 2022
Building Plan Approval (IOD)File: 20220702012528_00002 Rev Building A.pdf21 Dec 2022
Building Plan Approval (IOD)File: 20220702012528_ Rev Building A 1-4.pdf21 Dec 2022
Building Plan Approval (IOD)File: 20220702012528_ Rev Building A 5-7.pdf21 Dec 2022
Building Plan Approval (IOD)File: 20220702012528_ Rev Building B.pdf21 Dec 2022
Building Plan Approval (IOD)File: 20220702012528_ Rev Building C.pdf21 Dec 2022
Building Plan Approval (IOD)File: 20220702012528_ Rev Building E.pdf21 Dec 2022
Building Plan Approval (IOD)File: 20220702012528_00016 Rev Parking Floors.pdf21 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENSMENT CERTIFICATE - 0340.pdf21 Dec 2022
Declaration about Commencement CertificateFile: KEDAR - Declaration about Commencement Certificate.pdf21 Dec 2022
CERSAI detailsFile: KEDAR - Self Declaration for CERSAI.pdf21 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 Architect Certificate SMALLEST.pdf26 Apr 2019
Certificates of CA (Form 3)File: 18 CA Certificate Form 3.pdf26 Apr 2019
Details of encumbrancesFile: Declaration of Encumbrances.pdf24 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 06 Certificate of Engineer.pdf24 Apr 2019
Building plan approvalFile: 13 Building - A Plan.pdf20 Apr 2019
Building plan approvalFile: 13 Building - B Plan.pdf20 Apr 2019
Building plan approvalFile: 13 Building - C Plan.pdf20 Apr 2019
Layout approvalFile: 17 Layout Plan.pdf20 Apr 2019

How this compares with Pune

88%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHNAKUNJ RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR MAHESH GALEXY13,700+ in Pune

Builder: KEDAR ASSOCIATES

KEDAR ASSOCIATES has 1 registration on MahaRERA, including KRISHNAKUNJ RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KRISHNAKUNJ RESIDENCY is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNAKUNJ RESIDENCY?

The registered promoter entity is KEDAR ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNAKUNJ RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRISHNAKUNJ RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNAKUNJ RESIDENCY?

The professionals named in the filing: Architect: KHIRI BHIDE AND ASSOCIATES; Engineer: GIRISH C DHAVAL; Chartered Accountant: SHRIKANT MANTRI & CO; Chartered Accountant: Sunil Shamrao Nimbalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNAKUNJ RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNAKUNJ RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNAKUNJ RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.