Home / Browse projects / Thane, Maharashtra / KRISHNAI VANI COMPLEX
KRISHNAI VANI COMPLEX
RG-MH-94691 · RERA P51700012982 · Last updated on MahaRERA portal: 6 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 3 complaints at MahaRERA
- Completion date moved by 84 months
- 5 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KRISHNAI VANI COMPLEX is a Others project by Stone House Developer in Thane, Maharashtra, registered with MahaRERA as P51700012982 on 11 Sep 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 84 months from the original filing. 70 of the 120 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameKRISHNAI VANI COMPLEX
- TypeOthers
- Location
- 91 2C 91 2D
- Bhiwandi (M Corp.)
- Bhiwandi
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700012982
- ReraGenie IDRG-MH-94691
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Sep 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2018)
- Buildings1 building record
- Documents filed48 files
Current status
Figures as on 6 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KRISHNA VANI COMPLEX | NA | 14 | 10 | 92 | 28 | 120 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.
KRISHNA VANI COMPLEX: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 6 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 1% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | Yes | 10% |
Parking filed30
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAMAN SHANTARAM DIVEKAR | Bhiwandi (M Corp.) | Thane |
| PRAMOD AMRUT DIVEKAR | Bhiwandi (M Corp.) | Thane |
| PRABHAKAR AMRUT DIVEKAR | Bhiwandi (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ALIM ABDUL KADIR FOUZI |
| Architect | FOUZI & ASSOCIATES |
| Engineer | MAJID DHOKLE |
| Engineer | FOUZI & ASSOCIATES |
| Chartered Accountant | B M CHAUHAN CO |
| Chartered Accountant | H.S. SHAH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Stone House Developer | - |
Extensions applied for5
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to frequent lockdowns imposed by the authorities, the project was not completed on time and hence we hereby apply for one year extension i.e. 30/07/23 which is agreed and accepted by the allottees in the attached format.
Reason as filed by the promoterNon Availability Of Materials (Sea Sand)
Reason as filed by the promoterDELAY IS CAUSED DUE TO DELAY IN OBTAINING REVISED MUNICIPAL PERMISSIONS AND OBSTRUCTION OF WORK DUE TO OUTBREAK OF COVID-19 PANDEMIC
Reason as filed by the promoterConstruction is complete. Delay is in obtaining OC therefore extension is applied.
Reason as filed by the promoterchanges by authority
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055884 | M/s. Ketki Developers through its partner Mr. Deepak Vallabhaji Dedhia | Stone House Developer through its Partner Mr. Abdul Rahim Zaheer Ahmed Qureshi | 27/08/2018 |
| CC006000000354519 | Ajit Pai | Abdul Rahim Zheer Ahmed Qureshi | 27/02/2023 |
| CC12604049 | ASHISH RANJEET JHA | Stone House Developer | 29/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed48
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2017-2018)File: FORM 5_Stonehouse_17-18.pdf | 6 Jan 2026 |
| Form 5 (FY 2019-2020)File: Form 5 - 19-20 - Signed.pdf | 6 Jan 2026 |
| Form 5 (FY 2021-2022)File: Form 5 - 20-21 - Signed.pdf | 6 Jan 2026 |
| Form 5 (FY 2020-2021)File: Form 5 - 20-21 - Signed.pdf | 6 Jan 2026 |
| Form 5 (FY 2022-2023)File: Form-5 22-23 signed.pdf | 6 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form-5 23-24 signed.pdf | 6 Jan 2026 |
| Form 1File: Form-1 As on 30-06-24 Q1 24-25.pdf | 27 Sep 2025 |
| Form 2File: Form 2 As on 30-06-24 Q1 24-25.pdf | 27 Sep 2025 |
| Form 3File: FORM 3(Q 1 OF FY 2024-25).pdf | 27 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD-UNSOLD June.pdf | 27 Sep 2025 |
| Form 1File: Form-1 As on 31-03-25 Q4 24-25.pdf | 27 Sep 2025 |
| Form 2File: Form 2 As on 31-03-25 Q4 24-25.pdf | 27 Sep 2025 |
| Form 3File: Form-3 As on 31-03-25 Q4 24-25.pdf | 27 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD Mar.pdf | 27 Sep 2025 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 1 Sep 2023 |
| Declaration in FORM BFile: Form B.pdf | 31 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf | 31 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf | 31 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Discolure of sold Inventory.pdf | 31 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 23 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 23 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A merged.pdf | 23 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 21-22-Signed.pdf | 17 May 2023 |
| Declaration about Commencement CertificateFile: Format - D 30-07-2022_compressed.pdf | 30 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed.pdf | 30 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 2_compressed.pdf | 30 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20_compressed.pdf | 30 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21_compressed.pdf | 30 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Sold unsold 30-07-2022_compressed.pdf | 30 Jul 2022 |
| Certificates of CA (Form 5)File: Form 5 - 19-20.pdf | 30 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 19-20.pdf | 30 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 20-21.pdf | 30 Jul 2022 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 8 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5_Stonehouse_18-19.pdf | 21 Mar 2020 |
| Certificates of CA (Form 5)File: FORM 5_Stonehouse_17-18.pdf | 26 Jul 2019 |
| Layout approvalFile: Corporation Plan Final.pdf | 2 Sep 2017 |
| Building plan approvalFile: Building Plan.pdf | 2 Sep 2017 |
| PAN CardFile: PAN Card.pdf | 2 Sep 2017 |
| Copy of the legal title reportFile: Title Certificate.pdf | 2 Sep 2017 |
| Details of encumbrancesFile: Opinion.pdf | 2 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: Corporation Plan Final.pdf | 2 Sep 2017 |
| Building Plan Approval (IOD)File: Building Plan.pdf | 2 Sep 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Bandhkam Parwana.pdf | 2 Sep 2017 |
| Declaration in FORM BFile: Notary.pdf | 2 Sep 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate.pdf | 2 Sep 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf | 2 Sep 2017 |
| Certificates of CA (Form 3)File: Chartered account Cerificate.pdf | 2 Sep 2017 |
| Proforma of Allotment letterFile: Agreement For Sale.pdf | 2 Sep 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| AMRUTWANI COMPLEX TYPE A B WING A B C | BHADWAD ROAD NEAR TALAV TEMGHAR BHIWANDI | 92 | Completed | Nov 2014 | Nov 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 48 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KRISHNAI VANI COMPLEX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhiwandi (M Corp.)7,600+ in Thane
Filed coordinates, straight-line distance. 58 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: Stone House Developer
Stone House Developer has 2 registrations on MahaRERA, including AMRUTWANI COMPLEX D TYPE and KRISHNAI VANI COMPLEX. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that KRISHNAI VANI COMPLEX shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KRISHNAI VANI COMPLEX is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KRISHNAI VANI COMPLEX?
The registered promoter entity is Stone House Developer, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KRISHNAI VANI COMPLEX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KRISHNAI VANI COMPLEX?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KRISHNAI VANI COMPLEX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KRISHNAI VANI COMPLEX?
The professionals named in the filing: Architect: ALIM ABDUL KADIR FOUZI; Architect: FOUZI & ASSOCIATES; Engineer: MAJID DHOKLE; Engineer: FOUZI & ASSOCIATES; Chartered Accountant: B M CHAUHAN CO; Chartered Accountant: H.S. SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KRISHNAI VANI COMPLEX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback