KRISHNA SQUARE
RG-MH-34180 · RERA P51700013776 · Last updated on MahaRERA portal: 28 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 48 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KRISHNA SQUARE is a Others project by GOPAL KRISHNA DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700013776 on 25 Oct 2017. Possession is promised by 31 Jul 2027. The completion date has moved by 48 months from the original filing. 161 of the 254 units on this registration are recorded sold or booked, and 31 of 33 construction stages are filed complete.
At a glance
Project
- NameKRISHNA SQUARE
- TypeOthers
- Location
- SHRI MALANG ROAD
- KALYAN EAST
- NETIVALI
- Kalyan
- Thane
- 421306
- Pincode421306
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700013776
- ReraGenie IDRG-MH-34180
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Oct 2017
- Promised completion31 Jul 2027
- Revised completionRevised to 31 Jul 2027 (originally 31 Jul 2023)
- Buildings3 building records
- Documents filed114 files
Current status
Figures as on 28 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 4 | 3 | 148 | 70 | 218 |
| WING B | NA | 36 | 30 | 36 | 0 | 36 |
| WING C | NA | 6 | 5 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 28 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
31 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
WING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed75
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership25
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SANDEEP TAWARE | Tisgaon | Thane |
| DEEPAK J TAWARE | NETIVALI | Thane |
| PARWATI SHANKAR TAWARE | Tisgaon | Thane |
| SUNITA S TAWARE | PISAVALI | Thane |
| KISAN MAHADU TAWARE | PISAVALI | Thane |
| KASHIBAI KALU MHATRE | PISAVALI | Thane |
| MANJULABAI B FULAWARE | PISAVALI | Thane |
| LILABAI ANANT WAYLE | Tisgaon | Thane |
| BANUBAI V PAWSHE | PISAVALI | Thane |
| SULOCHANA KISAN SHELAR | PISAVALI | Thane |
| ANITA GAJANAN TAWARE | PISAVALI | Thane |
| MEERA M TAWARE | PISAVALI | Thane |
| NIKHIL M TAWARE | PISAVALI | Thane |
| TEJASVINI TAWARE | PISAVALI | Thane |
| GANESH WAKADE | PISAVALI | Thane |
| GURUNATH VAKADE | PISAVALI | Thane |
| NAVNATH N WAKADE | PISAVALI | Thane |
| SHANKAR N WAKADE | PISAVALI | Thane |
| SOMNATH N WAKADE | PISAVALI | Thane |
| UJWALA NAMDEV MHATRE | PISAVALI | Thane |
| VANDAN A PATIL | PISAVALI | Thane |
| SUMAN JAGANNATH TAWARE | PISAVALI | Thane |
| VASUDEV WAMAN BHOIR | PISAVALI | Thane |
| TRIMBAK DHAMI BHOIR | PISAVALI | Thane |
| ANJANA TRIMBAK BHOIR | PISAVALI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 15.17 cr | Rs 14.96 cr |
| WING B | NA | Rs 15.17 cr | Rs 14.96 cr |
| WING C | NA | Rs 15.17 cr | Rs 14.96 cr |
| - | NA | Rs 4.50 cr | Rs 4.37 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DILIP TAMBDAY AND ASSOCIATES |
| Engineer | VINAYAK CHOPDEKAR |
| Engineer | Pradnya Ashok Ahire |
| Chartered Accountant | Pooja V Jain & Co |
| Partner | Role in project |
|---|---|
| GOPAL KRISHNA DEVELOPERS | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir, We are applying for extension due to following reasons: a) Due to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis. b) Construction of Wing A is completed and we have obtained completion certificate from Kalyan Dombivali Municipal Corporation dated 01.09.2018. Construction of Wing B is in process and we have obtained part occupancy certificate from Kalyan Dombivali Municipal Corporation dated 24.08.2022. c) Construction of Wing C is in process and will be handed over to Kalyan Dombivali Municipal Corporation. We requ
Reason as filed by the promoterThe delay was caused by unforeseen circumstances beyond our control. Despite our best efforts, we were unable to complete the project within the stipulated timeline. Therefore, we request an extension until 30 July 2026.
Reason as filed by the promoterThe project could not be completed within the originally registered timeline due to a combination of unforeseen and practical challenges encountered during the course of execution. The construction activities were adversely affected by fluctuations in the availability and cost of construction materials, shortage of skilled labour, and delays in the mobilization of contractors and other agencies involved in the project. These factors impacted the planned construction schedule and resulted in slower progress than originally anticipated. In addition, certain activities requiring coordination with
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Nov 2024
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 28 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 28 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 (1)_compressed.pdf | 28 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf | 28 Jul 2026 |
| Withdrawal Update Form 1File: SQUARE ARCHITECT CERFICATE 4TH QTR 2025-26.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: SQUARE ENGINEER CERFICATE 4TH QTR 2025-26.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: SQUARE CA CERFICATE 4TH QTR 2025-26.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: ks architect ceirtificate third qtr 25-26.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: KS - engineer certificte second qtr 25-26.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: ks ca ceirtificate third qtr 25-26.pdf | 27 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 (24-25) KS.pdf | 22 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Square.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Square.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: KS - architect certificte second qtr 25-26.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Square.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Square.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: KS - engineer certificte second qtr 25-26.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Square.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Square.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: KS - ca certificte second qtr 25-26.pdf | 4 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Square Mar 25 (1).pdf | 17 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Square Mar 25 (1).pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: krishna square engineer certificate.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 Square Dec 24.pdf | 27 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Square Dec 24.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Square Dec 24.pdf | 27 Jan 2025 |
| Declaration in FORM BFile: Form B.pdf | 14 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01.pdf | 14 Dec 2024 |
| Certificates of CA (Form 3)File: Form 03.pdf | 14 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02.pdf | 14 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked.pdf | 14 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 14 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 KS 23-24.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Square Architect.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Square.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 Square (1).pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Square Architect.pdf | 18 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 Square (1).pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Square.pdf | 18 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 KS 23-24.pdf | 18 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KRISHNA SQAURE OC.pdf | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Square Architect.pdf | 26 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 Square (1).pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Square.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KS-ARCHITECT LATTER.pdf | 10 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KS-ENGINEERS CERTIFICATE.pdf | 10 May 2024 |
| Certificates of CA (Form 3)File: KS-CA CERTIFICATE.pdf | 10 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Square 22-23.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 KS.pdf | 21 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 KS.pdf | 21 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 KS Sep 23.pdf | 21 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: KS REVISED FLAT CC.pdf | 25 Jul 2023 |
| Declaration about Commencement CertificateFile: Form D-Krishna Square.pdf | 25 Jul 2023 |
| Declaration in FORM BFile: Form B - Krishna Square_rotated.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A- Krishna Square March 2020_rotated.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- Krishna Square March 2021_rotated.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Krishna Square March 2022_rotated.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Krishna Square March 2023_rotated.pdf | 25 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory- Krishna Square_rotated.pdf | 25 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 KS.pdf | 24 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: KS 17-18.pdf | 5 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KS 18-19.pdf | 5 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KS 19-20.pdf | 5 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KS 20-21.pdf | 5 Mar 2022 |
| Details of encumbrancesFile: Encumbrance Letter.pdf | 29 Dec 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Krishna Square Architect Certificate.pdf | 23 Oct 2021 |
| Certificates of CA (Form 3)File: FORM_3__KS (1).pdf | 23 Oct 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc.pdf | 23 Oct 2021 |
| Layout approvalFile: MYSCAN_20210326_0001.pdf | 27 Mar 2021 |
| Layout approvalFile: MYSCAN_20210326_0002.pdf | 27 Mar 2021 |
| Layout approvalFile: MYSCAN_20210326_0003.pdf | 27 Mar 2021 |
| Layout approvalFile: MYSCAN_20210326_0004.pdf | 27 Mar 2021 |
| Layout approvalFile: MYSCAN_20210326_0005.pdf | 27 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210326_0001.pdf | 27 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210326_0002.pdf | 27 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210326_0003.pdf | 27 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210326_0004.pdf | 27 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210326_0005.pdf | 27 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: KS CC 29th Floor.pdf | 27 Mar 2021 |
| Layout approvalFile: KS 24 Floor (1).pdf | 11 Jul 2019 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KRISHNA PARADISE PHASE I | 100 FT ROAD TISGAON KALYAN EAST | 236 | Completed | May 2016 | Late, Jul 2017 |
| KRISHNA HEIGHT | 100FT ROAD TISGAON KALYAN EAST | 154 | Completed | Jan 2016 | Late, May 2016 |
| GOPAL KRISHNA PARK PHASE II | HAJI MALANG ROAD KALYAN EAST | 83 | Completed | Jun 2007 | Late, Jul 2008 |
| GOPAL KRISHNA PARK PHASE I | 100 FT ROAD TISGAON KALYAN EAST | 196 | Completed | Dec 2004 | Late, Dec 2004 |
| RADHE KRISHNA PARK | HAJI MALANG ROAD | 196 | Completed | Apr 2004 | Apr 2004 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KRISHNA SQUARE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KALYAN EAST7,600+ in Thane
Filed coordinates, straight-line distance. 199 registered projects within 2 km.
Kohinoor Eden
KGI REALTY PRIVATE LIMITED
Olympia City Phase 1
Balaji Rattan Lifespaces
Krishna Trident
Sonawane Infrastructure Private Limited
Rai s Heaven
RAI RESIDENCY Private Limited
Metro Grande Tower C and D
West Pioneer Properties India Pvt Ltd
SEASON SAHARA BUILDING NO 4 AND 5
SAMARTH SAI BUILDERS & DEVELOPERS
See every Thane project, with the district possession charts
Builder: GOPAL KRISHNA DEVELOPERS
GOPAL KRISHNA DEVELOPERS has 5 registrations on MahaRERA, including KRISHNA NISARGA and KRISHNA PARADISE. Its filings disclose 5 earlier MahaRERA projects: declares 1 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if KRISHNA SQUARE is delayed beyond 31 Jul 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KRISHNA SQUARE?
The registered promoter entity is GOPAL KRISHNA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KRISHNA SQUARE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KRISHNA SQUARE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KRISHNA SQUARE?
The professionals named in the filing: Architect: DILIP TAMBDAY AND ASSOCIATES; Engineer: VINAYAK CHOPDEKAR; Engineer: Pradnya Ashok Ahire; Chartered Accountant: Pooja V Jain & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KRISHNA SQUARE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.