Home / Browse projects / Pune, Maharashtra / Krishna Residency
Krishna Residency
RG-MH-88758 · RERA P52100019511 · Last updated on MahaRERA portal: 12 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 48 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Krishna Residency is a Others project by Jayant Vithoba Mahadik in Pune, Maharashtra, registered with MahaRERA as P52100019511 on 6 Feb 2019. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 48 months from the original filing. 20 of the 39 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameKrishna Residency
- TypeOthers
- Location
- Balewadi
- Haveli
- Pune
- 411045
- Pincode411045
- RERA no.P52100019511
- ReraGenie IDRG-MH-88758
Builder
- NameJayant Vithoba Mahadik
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Feb 2019
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 12 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Krishna Residency | NA | 7 | 7 | 35 | 4 | 39 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 75%.
Krishna Residency: 84% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 75% |
| Podiums (if any) | 75% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
Progress on shared amenities15
As on 12 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 75% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 75% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed16
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Krishna Residency | NA | Rs 10.77 cr | Rs 6.34 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sushant Jagadale |
| Engineer | Abhinandan Nalawde |
| Chartered Accountant | Gaurav Jadhav & Co |
| Chartered Accountant | D.M. Shinde & Co. |
| Partner | Role in project |
|---|---|
| Jayant Vithoba Mahadik | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for an extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. As we have 0 Sold units, consents are not required for the purpose of extension of the RERA registration period of the said project.
Reason as filed by the promoterWe, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100019511 up to 31/12/2025.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Final Signed Form 1 Q1.pdf | 12 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Q2.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: Final Signed Form 2 Q1.pdf | 12 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Q2.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: Final Signed Form 3 Q1.pdf | 12 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Q2.pdf | 12 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5_FY 2024-25 - signed.pdf | 21 Nov 2025 |
| Form 1File: Form 1 Architect Certificate - March 2025.pdf | 21 Jun 2025 |
| Form 2File: Withdrawal Application Form2 - Sign.pdf | 21 Jun 2025 |
| Form 3File: Withdrawal Application Form3 - Sign.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory March 2025.pdf | 21 Jun 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate - March 2025.pdf | 21 Jun 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 - Sign.pdf | 21 Jun 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 - Sign.pdf | 21 Jun 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance certificate with Finance and Legal.pdf | 29 Jan 2025 |
| Details of encumbrancesFile: Encumbrance certificate with Finance and Legal.pdf | 29 Jan 2025 |
| Declaration in FORM BFile: Form B -Declaration by promoter.pdf | 29 Jan 2025 |
| Certificates of CA (Form 3)File: CA Certificate December 2024 - Sign.pdf | 29 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Dec 2024.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory December 2024.pdf | 29 Jan 2025 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 29 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance certificate with Finance and Legal.pdf | 29 Jan 2025 |
| Other - TechnicalFile: Plinth Certificate.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - December 2023.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - March 2024.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - June 2024.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - September 2024.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - December 2024.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory March 2024.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory September 2024.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory June 2024.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory December 2023.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory September 2023.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory June 2023.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory March 2023.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory December 2022.pdf | 8 Jan 2025 |
| Certificates of CA (Form 3)File: CA Certificate June 2023- Signed.pdf | 23 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate September 2024- Signed.pdf | 23 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate June 2024- Signed.pdf | 23 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate March 2024- Signed.pdf | 23 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate December 2023- Signed.pdf | 23 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate September 2023- Signed.pdf | 23 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate March 2023- Signed.pdf | 23 Dec 2024 |
| Certificates of CA (Form 3)File: CA Certificate December 2022- Signed.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - June 2023.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Sept 2024.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - June 2024.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - March 2024.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Dec 2023.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - March 2023.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Dec 2022.pdf | 23 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - Sept 2023.pdf | 23 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance March 2024.pdf | 23 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5 FY 2023-24 Krishna Residency.pdf | 23 Dec 2024 |
| Building plan approvalFile: Plan 1.pdf | 6 Dec 2023 |
| Building plan approvalFile: Plan 2.pdf | 6 Dec 2023 |
| Building plan approvalFile: Plan 3.pdf | 6 Dec 2023 |
| Building Plan Approval (IOD)File: Plan 1.pdf | 6 Dec 2023 |
| Building Plan Approval (IOD)File: Plan 2.pdf | 6 Dec 2023 |
| Building Plan Approval (IOD)File: Plan 3.pdf | 6 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 6 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 23.pdf | 6 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 6 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 6 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 6 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf | 6 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 6 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 6 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 6 Sep 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 5 Sep 2023 |
| Declaration in FORM BFile: Form B.pdf | 5 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: C - 29.pdf | 5 Sep 2023 |
| Layout approvalFile: Layout.pdf | 1 Aug 2023 |
| Building plan approvalFile: Plan 1.pdf | 1 Aug 2023 |
| Building plan approvalFile: Plan 2.pdf | 1 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 1 Aug 2023 |
| Building Plan Approval (IOD)File: Plan 1.pdf | 1 Aug 2023 |
| Building Plan Approval (IOD)File: Plan 2.pdf | 1 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 1 Aug 2023 |
| Proforma of Agreement for saleFile: Agreement.pdf | 1 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Krishna Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Balewadi13,700+ in Pune
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: Jayant Vithoba Mahadik
Jayant Vithoba Mahadik has 1 registration on MahaRERA, including Krishna Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Krishna Residency shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Krishna Residency is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Krishna Residency?
The registered promoter entity is Jayant Vithoba Mahadik, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Krishna Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Krishna Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Krishna Residency?
The professionals named in the filing: Architect: Sushant Jagadale; Engineer: Abhinandan Nalawde; Chartered Accountant: Gaurav Jadhav & Co; Chartered Accountant: D.M. Shinde & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Krishna Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback