Registered No litigation declared Residential / Group Housing project

Krishna Ramesh Velora

By Siddhivinayak Developers

RG-MH-97077 · RERA PR1260002500677 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 45 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
3 of 30Construction stages doneacross 3 buildings; furthest along: Plinth, 80%
49 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 20 documents Report an error

Krishna Ramesh Velora is a Residential / Group Housing project by Siddhivinayak Developers in Pune, Maharashtra, registered with MahaRERA as PR1260002500677 on 1 Sep 2025. Possession is promised by 31 Mar 2029. 5 of the 54 units on this registration are recorded sold or booked, and 3 of 30 construction stages are filed complete.

At a glance

Project

  • NameKrishna Ramesh Velora
  • TypeResidential / Group Housing
  • Location
    • Survey No. 63
    • Hissa No. 2B/2E/2
    • Hadapsar-EXT
    • Village- Hadapsar
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002500677
  • ReraGenie IDRG-MH-97077

Builder

  • NameSiddhivinayak Developers
  • Entity typePartnership
  • GSTIN27ACDFS6522Q1ZJ
  • PartnersMahesh Kantilal Ganatra, Jayesh Babulal Thakkar, Viral Jayesh Thakkar
  • Other registrations45 more →
  • Completed21 of 46
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

this monthRegisteredSep 2025PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2025
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed20 files

Current status

9%5 of 54 units booked
3.5%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Krishna Ramesh VeloraWing A8824832
Krishna Ramesh VeloraWing B9622022
Krishna Ramesh VeloraWing C30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 30 construction stages are filed complete across 3 buildings. The stage furthest along is Plinth, at 80%.

Krishna Ramesh Velora · wing Wing A0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Krishna Ramesh Velora · wing Wing B25%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Krishna Ramesh Velora · wing Wing C18%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed177

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots177
Stilt / Ground103
Podiums / Upper Parking Floor38
Basement36
BuildingStilt / GroundPodiums / Upper Parking FloorBasementTotal
Krishna Ramesh Velora Wing A540256
Krishna Ramesh Velora Wing B35121259
Krishna Ramesh Velora Wing C14262262

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,100 sq m
Land owned byNot the promoter
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jul 2025
LandownerVillageDistrict
Hari Kanhaiya BinawatHadapsarPune
Sandeep Ramesh BinavatHadapsarPune
Prem Kanhaiya BinawatHadapsarPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI5500.0
Proposed, not sanctioned3,326 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGERA JUNCTION CONDOMINIUM PUNE MAHARASHTRA PINCODE-411040
Estimated costRs 14.67 cr
Cost incurredRs 51.57 lakh
Work done3.51%
BuildingWingEstimatedIncurred
Krishna Ramesh VeloraWing ARs 8.14 crRs 29.17 lakh
Krishna Ramesh VeloraWing BRs 6.25 crRs 22.40 lakh
-NARs 28.77 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects Associates
EngineerSV and Associates
EngineerSK Consultants & Engineers
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Siddhivinayak Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed20

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 of Krishna Ramesh Velora as on 31-03-2026.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1 of Krishna Ramesh Velora as on 31-03-2026.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 of Krishna Ramesh Velora as on 31-03-2026.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 of Krishna Ramesh Velora as on 31-03-2026.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 of Krishna Ramesh Velora as on 31-03-2026.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 of Krishna Ramesh Velora as on 31-03-2026.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1 - Krishna Ramesh Velora as on Sep 2025 (REVISED).pdf28 Feb 2026
Withdrawal Update Form 1File: Form 1 - Krishna Ramesh Velora as on Sep 2025 (REVISED).pdf28 Feb 2026
Withdrawal Update Form 1File: Form 1 - Krishna Ramesh Velora as on Dec 2025.pdf28 Feb 2026
Withdrawal Update Form 2File: Form 2 - Krishna Ramesh Velora as on Sep 2025.pdf28 Feb 2026
Withdrawal Update Form 2File: Form 2 - Krishna Ramesh Velora as on Sep 2025.pdf28 Feb 2026
Withdrawal Update Form 2File: Form 2 - Krishna Ramesh Velora as on Dec 2025.pdf28 Feb 2026
Withdrawal Update Form 3File: Form 3 - Krishna Ramesh Velora as on Sep 2025.pdf28 Feb 2026
Withdrawal Update Form 3File: Form 3 - Krishna Ramesh Velora as on Sep 2025.pdf28 Feb 2026
Withdrawal Update Form 3File: Form 3 - Krishna Ramesh Velora as on Dec 2025.pdf28 Feb 2026
Declaration and undertaking (Annexure A)File: Annexure A - Order No 50 (1).pdf8 Aug 2025
Layout approvalFile: Layout 1.pdf24 Jul 2025
Building plan approvalFile: Layout 1.pdf24 Jul 2025
Building plan approvalFile: Layout 2.pdf24 Jul 2025
Building plan approvalFile: Layout 3.pdf24 Jul 2025

How this compares with Pune

9%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Krishna Ramesh Velora on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hadapsar-EXT, Village- Hadapsar13,700+ in Pune

2 kmKrishna Ramesh VeloraCompleted 52Lapsed / revoked 20Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 123 registered projects within 2 km.

Builder: Siddhivinayak Developers

SIDDHIVINAYAK DEVELOPERS has 46 registrations on MahaRERA, including VIJAY PLAZA - A and VIJAY PLAZA - B. Its filings disclose 11 earlier MahaRERA projects: declares 6 of 9 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Krishna Ramesh Velora is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Krishna Ramesh Velora?

The registered promoter entity is Siddhivinayak Developers, a partnership as per the filing. Its GSTIN 27ACDFS6522Q1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Krishna Ramesh Velora?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Krishna Ramesh Velora?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Krishna Ramesh Velora?

The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: SV and Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Krishna Ramesh Velora?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Krishna Ramesh Velora. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Krishna Ramesh Velora to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.