Home / Browse projects / Thane, Maharashtra / KRISHNA PRESTIGE
KRISHNA PRESTIGE
By M/s. Arun Bhoomi Corporation
RG-MH-44998 · RERA P51700011183 · Last updated on MahaRERA portal: 29 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 5 cases
- 72 complaints at MahaRERA
- Completion date moved by 57 months
- 4 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KRISHNA PRESTIGE is a Others project by M/s. Arun Bhoomi Corporation in Thane, Maharashtra, registered with MahaRERA as P51700011183 on 31 Aug 2017. Possession is promised by 30 Sep 2027. The completion date has moved by 57 months from the original filing. 214 of the 265 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 72 complaints are on record with the regulator.
At a glance
Project
- NameKRISHNA PRESTIGE
- TypeOthers
- Location
- MIDC ROAD
- MIRA ROAD
- Mira-Bhayandar (M Corp.)
- Thane
- 401107
- Pincode401107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700011183
- ReraGenie IDRG-MH-44998
Builder
- NameM/s. Arun Bhoomi Corporation
- Entity typePartnership
- PartnersKanhaiyalal Nathulal Joshi, VIJAY KANHAIYALAL JOSHI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion30 Sep 2027
- Revised completionRevised to 30 Sep 2027 (originally 29 Dec 2022)
- Buildings2 building records
- Documents filed295 files
Current status
Figures as on 29 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KRISHNA PRESTIGE ABC | NA | 16 | 14 | 118 | 39 | 157 |
| KRISHNA PRESTIGE DE | NA | 14 | 14 | 108 | 0 | 108 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.
KRISHNA PRESTIGE ABC52%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 62% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
KRISHNA PRESTIGE DE76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities16
As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 15% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| HEALTH CLUB | Yes | 0% |
Parking filed47
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| KRISHNA PRESTIGE ABC | 1 | 30 | 31 |
| KRISHNA PRESTIGE DE | 1 | 15 | 16 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TEJS ARCHITECTS AND CONSULTANTS |
| Engineer | PATEL KULKARNI RCC CONSULTANTS |
| Engineer | DILIP SHARMA |
| Chartered Accountant | ANUJ PRADHAN |
| Chartered Accountant | ANILKUMAR SUTHAR |
| Partner | Role in project |
|---|---|
| M/s. Arun Bhoomi Corporation | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOrder dated 8/2/2019 passed by authority restraining promoter in creating 3rd party rights. The authority had no jurisdiction to pass such order due to lack of inherent jurisdiction and the said order came to be set aside by appellate authority stating authority had no jurisdiction to pass such orders vide an order dated 28/10/2021. Covid affected payment capacity of many allottees. Various hurdles at MBMC i.e authority giving sanctions due to i. Change in DCPR rules ii. Further Amendment in under construction project in DCPR rules. iii. ULC related State enquiries affecting the availability o
Reason as filed by the promoter1) Order dated 8/2/2019 passed by authority restraining promoter in creating 3rd party rights. The authority had no jurisdiction to pass such order due to lack of inherent jurisdiction and the said order came to be set aside by appellate authority stating authority had no jurisdiction to pass such orders vide an order dated 28/10/2021. 2) Covid affected payment capacity of many allottees. 3) Various hurdles beyond our control at MBMC i.e authority giving sanctions due to i. Change in DCPR rules ii. Further Amendment in under construction project in DCPR rules. iii. ULC related State enquiries
Reason as filed by the promoterWe sincerely apologize for the delay in completion and for the late submission of this extension application. The delay in the project execution and final completion has been caused due to a combination of unforeseen legal, regulatory, and administrative circumstances, as outlined below: 1. Judicial Restraint on Creating Third-Party Rights: An order dated 08/02/2019 was passed by the Authority restraining the promoter from creating third-party rights. This order was passed without jurisdiction and was subsequently set aside by the Appellate Authority on 28/10/2021, citing the Authority’s lack
Reason as filed by the promoterWe, M/s. Arun Bhoomi Corporation, hereby declare the following with respect to the project Krishna Prestige bearing registration number P51700011183 registered under MahaRERA. The delay in completion of the project was occasioned by several circumstances, many of which were beyond the control of the Promoter, including the following: 1. By an Order dated 08.02.2019, the Authority restrained the Promoter from creating any third-party rights in respect of the project. Subsequently, the Appellate Authority, vide its Order dated 28.10.2021, set aside the said Order on the ground that the Authority
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 573/2014 | THANE COURT | pending |
| 132/2017 | THANE COURT | pending |
| 637/2015 | THANE COURT | pending and challenged |
| 14/2017 | THANE COURT | pending |
| 144/2010 | THANE COURT | suit stayed by high court in favor and pending |
Complaints filed with MahaRERA72
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055460 | M/S Jagruti Developers | M/S Arun Bhoomi Corporation | 21/07/2018 |
| CC006000000055665 | NUTAN GANESH VANMALI | VIJAY JOSHI | 14/08/2018 |
| CC006000000057488 | DR SHAILESH RATILAL PARMAR | M/s Arun Bhoomi Corporation | 31/12/2018 |
| CC006000000079100 | Mr. Savio Anthony D'sa, Mr. Shawn Anthony D'sa, Mr. Anthony Lawrance D'sa | M/s. Arun Bhoomi Corporation | 08/05/2019 |
| CC006000000079140 | Mr. Amit Vaghela & Mr. Ghanshyam Vaghela | Arun Bhoomi Corporation | 08/05/2019 |
| CC006000000079149 | Mr. Kishorkumar C. Vaghela & Mr. Nilesh K. Vaghela | M/s. Arun Bhoomi Corporation | 08/05/2019 |
| CC006000000079156 | Bhaskar N. Poojary | M/s. Arun Bhoomi Corporation | 08/05/2019 |
| CC006000000079155 | Mr. Bharat Shantaram Angane | M/s Arun Bhoomi Corporation | 09/05/2019 |
| CC006000000079175 | Mr. Rajesh Anand Vohra | M/s. Arun Bhoomi Corporation | 09/05/2019 |
| CC006000000079177 | Mr. Suresh S. Sarvaiya | M/s. Arun Bhoomi Corporation | 07/05/2019 |
| CC006000000079194 | Mr. Gaurang Trivedi | M/s. Arun Bhoomi Corporation | 09/05/2019 |
| CC006000000079237 | Mr. Kushal Mehta | Arun Bhoomi Corporation | 10/05/2019 |
| CC006000000079238 | Mr. Riket Mehta | M/s. Arun Bhoomi Corporation | 11/05/2019 |
| CC006000000079246 | Mr. Lalji Dulabhai Katariya and Mr. Haresh Dulabhai Katariya | M/s. Arun Bhoomi Corporation | 11/05/2019 |
| CC006000000079249 | Mrs. Bayani Ramadevi N. Reddy & Mr. Bayani Narasinha Reddy | M/s. Arun Bhoomi Corporation | 11/05/2019 |
| CC006000000079264 | Mr. Anand Narendra Bhatia & Mrs. Lalita Anand Bhatia | Arun Bhoomi Corporation | 13/05/2019 |
| CC006000000079277 | Mr. Ramesh Kumar Gojaria | M/s. Arun Bhoomi Corporation | 17/05/2019 |
| CC006000000079267 | Mr. Sachin Harish Chhabria | M/s. Arun Bhoomi Corporation | 13/05/2019 |
| CC006000000079269 | Deepak Kumar Joshi | M/s. Arun Bhoomi Corporation | 13/05/2019 |
| CC006000000079272 | Mr. Sanjay Soni & Mrs. Neha Soni | M/s. Arun Bhoomi Corporation | 13/05/2019 |
| CC006000000079289 | Mr. Tushar Sitaram Prabhu | M/s. Arun Bhoomi Corporation | 14/05/2019 |
| CC006000000079379 | Mr. Chandrakant Pralhad Jadhav | Arun Bhoomi Corporation | 20/05/2019 |
| CC006000000079302 | Mrs. Majula R. Patel and Mr. Pritesh R. Patel | M/s. Arun Bhoomi Corporation | 17/05/2019 |
| CC006000000079303 | Mr. Chetan Ankhad | M/s. Arun Bhoomi Corporation | 15/05/2019 |
| CC006000000079306 | Mr. T. V. Mukundan | M/s. Arun Bhoomi Corporation | 15/05/2019 |
| CC006000000079335 | Mrs. Harshida Solanki & Mr. Vishal Solanki | M/s. Arun Bhoomi Corporation | 17/05/2019 |
| CC006000000079314 | Sharad Kadam | M/s. Arun Bhoomi Corporation | 15/05/2019 |
| CC006000000079331 | Mr. Sandeep Mulchand Shah | Mr. Sandeep Mulchand Shah | 17/05/2019 |
| CC006000000079332 | Mr. Vijay Appa Mestry | M/s. Arun Bhoomi Corporation | 17/05/2019 |
| CC006000000079347 | Mrs. Mulki Devi Gopal Choudhary | M/s. Arun Bhoomi Corporation | 19/05/2019 |
| CC006000000079319 | Mr. Subhash Gopal Shirsat | Arun Bhoomi Corporation | 16/05/2019 |
| CC006000000079329 | Mr. Sachin S. Jain | M/s. Arun Bhoomi Corporation | 17/05/2019 |
| CC006000000079313 | Mr. Nester Francis Carvalho | M/s. Arun Bhoomi Corporation | 15/05/2019 |
| CC006000000079333 | Mr. Anant Angane | M/s. Arun Bhoomi Corporation | 17/05/2019 |
| CC006000000079354 | Mr. Satish Kumar Joshi | M/s. Arun Bhoomi Corporation | 18/05/2019 |
| CC006000000079356 | Mrs Sujata Vinod Garge | M/s Arun Bhoomi Corporation | 20/05/2019 |
| CC006000000079400 | Mr. Bharat Sahebrao Kaware | M/s. Arun Bhoomi Corporation | 21/05/2019 |
| CC006000000079360 | Mrs Madhu Beohar | M/s. Arun Bhoomi Corporation | 20/05/2019 |
| CC006000000079364 | Shantilal V Gogri | M/S Arun Bhoomi Corporation | 20/05/2019 |
| CC006000000079377 | Mr. Ashok Sawla & Mrs. Nayana Sawla | M/s. Arun Bhoomi Corporation | 28/05/2019 |
| CC006000000079349 | Mr. Ashok S. Suvarna | M/s. Arun Bhoomi Corporation | 18/05/2019 |
| CC006000000079373 | Rajnikant M Umrani | M/S Arun Bhoomi Corporation | 20/05/2019 |
| CC006000000079372 | Maruti Vittu Hajare | M/s. Arun Bhoomi Corporation | 20/05/2019 |
| CC006000000079402 | Mr. Sukhchand Bitupada Adak | M/s. Arun Bhoomi Corporation | 21/05/2019 |
| CC006000000079407 | Mr. Pravinbhai Bhikhabhai Baldaniya | M/s. Arun Bhoomi Corporation | 22/05/2019 |
| CC006000000079380 | Mr. Sagar Tukaram Nalawade | Arun Bhoomi Corporation | 21/05/2019 |
| CC006000000079394 | Vasant M. Saglani | M/s. Arun Bhoomi Corporation | 21/05/2019 |
| CC006000000079393 | Seema Yadav | M/s. Arun Bhoomi Corporation | 21/05/2019 |
| CC006000000079410 | Mrs. Mala Tijoriwala | M/s. Arun Bhoomi Corporation | 22/05/2019 |
| CC006000000079409 | Mr. Sarang Bonde & Mrs. Manisha Bonde | M/s. Arun Bhoomi Corporation | 22/05/2019 |
| CC006000000079411 | Mr. Narayan Ail | M/s. Arun Bhoomi Corporation | 22/05/2019 |
| CC006000000079414 | Shanti Shankar Pan & Kakuli Pan | M/s. Arun Bhoomi Corporation | 01/06/2019 |
| CC006000000079412 | Mr. Prabhu Dayal Yadav | M/s. Arun Bhoomi Corporation | 22/05/2019 |
| CC006000000079484 | Mr. Sudipto Tarun Hizli | M/s. Arun Bhoomi Corporation | 27/05/2019 |
| CC006000000079430 | Mr. Dharmasi Khodifad | M/s. Arun Bhoomi Corporation | 27/05/2019 |
| CC006000000079453 | Mr Vinodbhai Nakum | M.s Arun Bhoomi Corporation | 27/05/2019 |
| CC006000000079481 | Ranjeetsingn T Chouhan | M/s Arun Bhoomi Corporation | 27/05/2019 |
| CC006000000079486 | Mr. Deepak K. Bhatia | M/s. Arun Bhoomi Corporation | 28/05/2019 |
| CC006000000089555 | Mr. Hiralal Patel & Mr. Devilal Patel | Arun Bhoomi Corporation | 31/05/2019 |
| CC006000000089567 | Mr. Neelam Jha | M/s. Arun Bhoomi Corporation | 03/06/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Dec 2022
Documents filed295
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 295 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 2026.pdf | 29 May 2026 |
| Form 2File: FORM 2 2026.pdf | 29 May 2026 |
| Form 3File: Form 3 2026.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 2026.pdf | 29 May 2026 |
| Self-declaration of Quarterly ProgressFile: QUARTELY PROGRESS REPORTS 2026.pdf | 29 May 2026 |
| Form 1File: FORM 1 2026.pdf | 29 May 2026 |
| Form 2File: FORM 2 2026.pdf | 29 May 2026 |
| Form 3File: Form 3 2026.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 2026.pdf | 29 May 2026 |
| Self-declaration of Quarterly ProgressFile: QUARTELY PROGRESS REPORTS 2026.pdf | 29 May 2026 |
| Form 1File: FORM 1 2026.pdf | 29 May 2026 |
| Form 2File: FORM 2 2026.pdf | 29 May 2026 |
| Form 3File: Form 3 2026.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 2026.pdf | 29 May 2026 |
| Self-declaration of Quarterly ProgressFile: QUARTELY PROGRESS REPORTS 2026.pdf | 29 May 2026 |
| Form 1File: FORM 1 2026.pdf | 29 May 2026 |
| Form 2File: FORM 2 2026.pdf | 29 May 2026 |
| Form 3File: Form 3 2026.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 2026.pdf | 29 May 2026 |
| Self-declaration of Quarterly ProgressFile: QUARTELY PROGRESS REPORTS 2026.pdf | 29 May 2026 |
| Form 2A (FY 2026-2027)File: FORM 2A 2026.pdf | 29 May 2026 |
| Form 5 (FY 2025-2026)File: FORM 5 2026.pdf | 29 May 2026 |
| Form 2A (FY 2025-2026)File: form -2A-2024.pdf | 17 Jun 2025 |
| Form 5 (FY 2021-2022)File: CA (Form 5) (FY 2022-23) (1).pdf | 17 Jun 2025 |
| Form 5 (FY 2022-2023)File: CA (Form 5) (FY 2022-23) (1).pdf | 17 Jun 2025 |
| Form 5 (FY 2023-2024)File: Certificate 23-24.pdf | 17 Jun 2025 |
| Form 5 (FY 2024-2025)File: Certificate 24-25.pdf | 17 Jun 2025 |
| Form 1File: form 1 march 25.pdf | 16 Jun 2025 |
| Form 2File: form 2 march 25.pdf | 16 Jun 2025 |
| Form 3File: FORM 3 mar 25.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold 2025.pdf | 16 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Rera self declaration - 31-03-2025.pdf | 16 Jun 2025 |
| Form 1File: form 1 march 25.pdf | 16 Jun 2025 |
| Form 2File: form 2 march 25.pdf | 16 Jun 2025 |
| Form 3File: FORM 3 mar 25.pdf | 16 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold 2025.pdf | 16 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Rera self declaration - 31-03-2025.pdf | 16 Jun 2025 |
| Form 5 (FY 2018-2019)File: CA (Form 5) (FY 2018-19) (1).pdf | 8 Jun 2025 |
| Form 5 (FY 2019-2020)File: CA (Form 5) (FY 2019-20) (1).pdf | 8 Jun 2025 |
| Form 5 (FY 2020-2021)File: CA (Form 5) (FY 2020-21) (1).pdf | 8 Jun 2025 |
| Form 5 (FY 2017-2018)File: CA (Form 5) (FY 2018-19) (1).pdf | 7 Jun 2025 |
| Form 1File: form 1 full.pdf | 6 Jun 2025 |
| Form 2File: Form - 2_ 2024.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf | 6 Jun 2025 |
| Form 3File: FORM 3 PART 1.pdf | 6 Jun 2025 |
| OthersFile: FORM 3 PART 2.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf | 6 Jun 2025 |
| Form 1File: form 1 full.pdf | 6 Jun 2025 |
| Form 2File: Form - 2_ 2024.pdf | 6 Jun 2025 |
| Form 3File: FORM 3 PART 1.pdf | 6 Jun 2025 |
| OthersFile: FORM 3 PART 2.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf | 6 Jun 2025 |
| Form 1File: form 1 full.pdf | 6 Jun 2025 |
| Form 2File: Form - 2_ 2024.pdf | 6 Jun 2025 |
| Form 3File: FORM 3 PART 1.pdf | 6 Jun 2025 |
| OthersFile: FORM 3 PART 2.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf | 6 Jun 2025 |
| Form 1File: form 1 full.pdf | 6 Jun 2025 |
| Form 2File: Form - 2_ 2024.pdf | 6 Jun 2025 |
| Form 3File: FORM 3 PART 1.pdf | 6 Jun 2025 |
| OthersFile: FORM 3 PART 2.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf | 6 Jun 2025 |
| Form 1File: architect abc 2023 form 1.pdf | 6 Jun 2025 |
| Form 2File: engineer 30112023 form 2.pdf | 6 Jun 2025 |
| Form 3File: Certificates of CA (Form 3) jan 2024.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold 2023.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf | 6 Jun 2025 |
| Form 1File: architect abc 2023 form 1.pdf | 6 Jun 2025 |
| Form 2File: engineer 30112023 form 2.pdf | 6 Jun 2025 |
| Form 3File: ca october 2023 form 3.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold 2023.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf | 6 Jun 2025 |
| Form 1File: architect abc 2023 form 1.pdf | 6 Jun 2025 |
| Form 2File: engineer 30112023 form 2.pdf | 6 Jun 2025 |
| Form 3File: ca october 2023 form 3.pdf | 6 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold 2023.pdf | 6 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf | 6 Jun 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 295 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KRISHNA PRESTIGE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MIRA ROAD7,600+ in Thane
Filed coordinates, straight-line distance. 217 registered projects within 2 km.
Codename StarLife
JP Infra Realty Private Limited
Prestige Garden Trails
PRESTIGE ESTATES PROJECTS LIMITED
TIARA HILLS PHASE I BLDG NO 3, 5 AND 2
PNK SPACE DEVELOPMENT PVT LTD
The Palace Tower B
JP Infra Realty Private Limited
Sector 2A - Wings JKL
Eversmile Properties Private Limited
CRESCENT WTC - WESTERN TRADE CENTER - PHASE -
CRESCENT SHELTERS
See every Thane project, with the district possession charts
Builder: M/s. Arun Bhoomi Corporation
M/s. Arun Bhoomi Corporation has 1 registration on MahaRERA, including KRISHNA PRESTIGE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if KRISHNA PRESTIGE is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KRISHNA PRESTIGE?
The registered promoter entity is M/s. Arun Bhoomi Corporation, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KRISHNA PRESTIGE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KRISHNA PRESTIGE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KRISHNA PRESTIGE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KRISHNA PRESTIGE?
The professionals named in the filing: Architect: TEJS ARCHITECTS AND CONSULTANTS; Engineer: PATEL KULKARNI RCC CONSULTANTS; Engineer: DILIP SHARMA; Chartered Accountant: ANUJ PRADHAN; Chartered Accountant: ANILKUMAR SUTHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KRISHNA PRESTIGE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback