KRISHNA PRESTIGE

By M/s. Arun Bhoomi Corporation

RG-MH-44998 · RERA P51700011183 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 72 complaints at MahaRERA
  • Completion date moved by 57 months
  • 4 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedmoved 57 months from the original
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
51 of 265Units unsoldnot recorded sold or booked
72Complaints at MahaRERAon this registration
Jump to the 295 documents Report an error

KRISHNA PRESTIGE is a Others project by M/s. Arun Bhoomi Corporation in Thane, Maharashtra, registered with MahaRERA as P51700011183 on 31 Aug 2017. Possession is promised by 30 Sep 2027. The completion date has moved by 57 months from the original filing. 214 of the 265 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete. 72 complaints are on record with the regulator.

At a glance

Project

  • NameKRISHNA PRESTIGE
  • TypeOthers
  • Location
    • MIDC ROAD
    • MIRA ROAD
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700011183
  • ReraGenie IDRG-MH-44998

Builder

  • NameM/s. Arun Bhoomi Corporation
  • Entity typePartnership
  • PartnersKanhaiyalal Nathulal Joshi, VIJAY KANHAIYALAL JOSHI

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion30 Sep 2027
  • Revised completionRevised to 30 Sep 2027 (originally 29 Dec 2022)
  • Buildings2 building records
  • Documents filed295 files

Current status

81%214 of 265 units booked

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRISHNA PRESTIGE ABCNA161411839157
KRISHNA PRESTIGE DENA14141080108

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

KRISHNA PRESTIGE ABC52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
KRISHNA PRESTIGE DE76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities16

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
HEALTH CLUBYes0%

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered2
Open Space45
BuildingClosed/CoveredOpen SpaceTotal
KRISHNA PRESTIGE ABC13031
KRISHNA PRESTIGE DE11516

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,380 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025

Approvals and building plan

Sanctioning authorityMIRA BHAYENDRA MUNCIPAL CORPORATION
Permissible FSI12006.37
Proposed, not sanctioned5,515 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHAKUR COMPLEX KANDIVALI EAST

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJS ARCHITECTS AND CONSULTANTS
EngineerPATEL KULKARNI RCC CONSULTANTS
EngineerDILIP SHARMA
Chartered AccountantANUJ PRADHAN
Chartered AccountantANILKUMAR SUTHAR
PartnerRole in project
M/s. Arun Bhoomi Corporation-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018518Dec 2022 → Jun 2025

Reason as filed by the promoterOrder dated 8/2/2019 passed by authority restraining promoter in creating 3rd party rights. The authority had no jurisdiction to pass such order due to lack of inherent jurisdiction and the said order came to be set aside by appellate authority stating authority had no jurisdiction to pass such orders vide an order dated 28/10/2021. Covid affected payment capacity of many allottees. Various hurdles at MBMC i.e authority giving sanctions due to i. Change in DCPR rules ii. Further Amendment in under construction project in DCPR rules. iii. ULC related State enquiries affecting the availability o

EXT51700012865Dec 2022 → Dec 2023

Reason as filed by the promoter1) Order dated 8/2/2019 passed by authority restraining promoter in creating 3rd party rights. The authority had no jurisdiction to pass such order due to lack of inherent jurisdiction and the said order came to be set aside by appellate authority stating authority had no jurisdiction to pass such orders vide an order dated 28/10/2021. 2) Covid affected payment capacity of many allottees. 3) Various hurdles beyond our control at MBMC i.e authority giving sanctions due to i. Change in DCPR rules ii. Further Amendment in under construction project in DCPR rules. iii. ULC related State enquiries

EA19062501683Dec 2022 → Jun 2026

Reason as filed by the promoterWe sincerely apologize for the delay in completion and for the late submission of this extension application. The delay in the project execution and final completion has been caused due to a combination of unforeseen legal, regulatory, and administrative circumstances, as outlined below: 1. Judicial Restraint on Creating Third-Party Rights: An order dated 08/02/2019 was passed by the Authority restraining the promoter from creating third-party rights. This order was passed without jurisdiction and was subsequently set aside by the Appellate Authority on 28/10/2021, citing the Authority’s lack

EA01062621184Dec 2022 → Sep 2027

Reason as filed by the promoterWe, M/s. Arun Bhoomi Corporation, hereby declare the following with respect to the project Krishna Prestige bearing registration number P51700011183 registered under MahaRERA. The delay in completion of the project was occasioned by several circumstances, many of which were beyond the control of the Promoter, including the following: 1. By an Order dated 08.02.2019, the Authority restrained the Promoter from creating any third-party rights in respect of the project. Subsequently, the Appellate Authority, vide its Order dated 28.10.2021, set aside the said Order on the ground that the Authority

Litigation declared5

CaseCourtStatus
573/2014THANE COURTpending
132/2017THANE COURTpending
637/2015THANE COURTpending and challenged
14/2017THANE COURTpending
144/2010THANE COURTsuit stayed by high court in favor and pending

Complaints filed with MahaRERA72

Case no.ComplainantRespondentFiled
CC006000000055460M/S Jagruti DevelopersM/S Arun Bhoomi Corporation21/07/2018
CC006000000055665NUTAN GANESH VANMALIVIJAY JOSHI14/08/2018
CC006000000057488DR SHAILESH RATILAL PARMARM/s Arun Bhoomi Corporation31/12/2018
CC006000000079100Mr. Savio Anthony D'sa, Mr. Shawn Anthony D'sa, Mr. Anthony Lawrance D'saM/s. Arun Bhoomi Corporation08/05/2019
CC006000000079140Mr. Amit Vaghela & Mr. Ghanshyam VaghelaArun Bhoomi Corporation08/05/2019
CC006000000079149Mr. Kishorkumar C. Vaghela & Mr. Nilesh K. VaghelaM/s. Arun Bhoomi Corporation08/05/2019
CC006000000079156Bhaskar N. PoojaryM/s. Arun Bhoomi Corporation08/05/2019
CC006000000079155Mr. Bharat Shantaram AnganeM/s Arun Bhoomi Corporation09/05/2019
CC006000000079175Mr. Rajesh Anand VohraM/s. Arun Bhoomi Corporation09/05/2019
CC006000000079177Mr. Suresh S. SarvaiyaM/s. Arun Bhoomi Corporation07/05/2019
CC006000000079194Mr. Gaurang TrivediM/s. Arun Bhoomi Corporation09/05/2019
CC006000000079237Mr. Kushal MehtaArun Bhoomi Corporation10/05/2019
CC006000000079238Mr. Riket MehtaM/s. Arun Bhoomi Corporation11/05/2019
CC006000000079246Mr. Lalji Dulabhai Katariya and Mr. Haresh Dulabhai KatariyaM/s. Arun Bhoomi Corporation11/05/2019
CC006000000079249Mrs. Bayani Ramadevi N. Reddy & Mr. Bayani Narasinha ReddyM/s. Arun Bhoomi Corporation11/05/2019
CC006000000079264Mr. Anand Narendra Bhatia & Mrs. Lalita Anand BhatiaArun Bhoomi Corporation13/05/2019
CC006000000079277Mr. Ramesh Kumar GojariaM/s. Arun Bhoomi Corporation17/05/2019
CC006000000079267Mr. Sachin Harish ChhabriaM/s. Arun Bhoomi Corporation13/05/2019
CC006000000079269Deepak Kumar JoshiM/s. Arun Bhoomi Corporation13/05/2019
CC006000000079272Mr. Sanjay Soni & Mrs. Neha SoniM/s. Arun Bhoomi Corporation13/05/2019
CC006000000079289Mr. Tushar Sitaram PrabhuM/s. Arun Bhoomi Corporation14/05/2019
CC006000000079379Mr. Chandrakant Pralhad JadhavArun Bhoomi Corporation20/05/2019
CC006000000079302Mrs. Majula R. Patel and Mr. Pritesh R. PatelM/s. Arun Bhoomi Corporation17/05/2019
CC006000000079303Mr. Chetan AnkhadM/s. Arun Bhoomi Corporation15/05/2019
CC006000000079306Mr. T. V. MukundanM/s. Arun Bhoomi Corporation15/05/2019
CC006000000079335Mrs. Harshida Solanki & Mr. Vishal SolankiM/s. Arun Bhoomi Corporation17/05/2019
CC006000000079314Sharad KadamM/s. Arun Bhoomi Corporation15/05/2019
CC006000000079331Mr. Sandeep Mulchand ShahMr. Sandeep Mulchand Shah17/05/2019
CC006000000079332Mr. Vijay Appa MestryM/s. Arun Bhoomi Corporation17/05/2019
CC006000000079347Mrs. Mulki Devi Gopal ChoudharyM/s. Arun Bhoomi Corporation19/05/2019
CC006000000079319Mr. Subhash Gopal ShirsatArun Bhoomi Corporation16/05/2019
CC006000000079329Mr. Sachin S. JainM/s. Arun Bhoomi Corporation17/05/2019
CC006000000079313Mr. Nester Francis CarvalhoM/s. Arun Bhoomi Corporation15/05/2019
CC006000000079333Mr. Anant AnganeM/s. Arun Bhoomi Corporation17/05/2019
CC006000000079354Mr. Satish Kumar JoshiM/s. Arun Bhoomi Corporation18/05/2019
CC006000000079356Mrs Sujata Vinod GargeM/s Arun Bhoomi Corporation20/05/2019
CC006000000079400Mr. Bharat Sahebrao KawareM/s. Arun Bhoomi Corporation21/05/2019
CC006000000079360Mrs Madhu BeoharM/s. Arun Bhoomi Corporation20/05/2019
CC006000000079364Shantilal V GogriM/S Arun Bhoomi Corporation20/05/2019
CC006000000079377Mr. Ashok Sawla & Mrs. Nayana SawlaM/s. Arun Bhoomi Corporation28/05/2019
CC006000000079349Mr. Ashok S. SuvarnaM/s. Arun Bhoomi Corporation18/05/2019
CC006000000079373Rajnikant M UmraniM/S Arun Bhoomi Corporation20/05/2019
CC006000000079372Maruti Vittu HajareM/s. Arun Bhoomi Corporation20/05/2019
CC006000000079402Mr. Sukhchand Bitupada AdakM/s. Arun Bhoomi Corporation21/05/2019
CC006000000079407Mr. Pravinbhai Bhikhabhai BaldaniyaM/s. Arun Bhoomi Corporation22/05/2019
CC006000000079380Mr. Sagar Tukaram NalawadeArun Bhoomi Corporation21/05/2019
CC006000000079394Vasant M. SaglaniM/s. Arun Bhoomi Corporation21/05/2019
CC006000000079393Seema YadavM/s. Arun Bhoomi Corporation21/05/2019
CC006000000079410Mrs. Mala TijoriwalaM/s. Arun Bhoomi Corporation22/05/2019
CC006000000079409Mr. Sarang Bonde & Mrs. Manisha BondeM/s. Arun Bhoomi Corporation22/05/2019
CC006000000079411Mr. Narayan AilM/s. Arun Bhoomi Corporation22/05/2019
CC006000000079414Shanti Shankar Pan & Kakuli PanM/s. Arun Bhoomi Corporation01/06/2019
CC006000000079412Mr. Prabhu Dayal YadavM/s. Arun Bhoomi Corporation22/05/2019
CC006000000079484Mr. Sudipto Tarun HizliM/s. Arun Bhoomi Corporation27/05/2019
CC006000000079430Mr. Dharmasi KhodifadM/s. Arun Bhoomi Corporation27/05/2019
CC006000000079453Mr Vinodbhai NakumM.s Arun Bhoomi Corporation27/05/2019
CC006000000079481Ranjeetsingn T ChouhanM/s Arun Bhoomi Corporation27/05/2019
CC006000000079486Mr. Deepak K. BhatiaM/s. Arun Bhoomi Corporation28/05/2019
CC006000000089555Mr. Hiralal Patel & Mr. Devilal PatelArun Bhoomi Corporation31/05/2019
CC006000000089567Mr. Neelam JhaM/s. Arun Bhoomi Corporation03/06/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Dec 2022

Documents filed295

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 295 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 2026.pdf29 May 2026
Form 2File: FORM 2 2026.pdf29 May 2026
Form 3File: Form 3 2026.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 2026.pdf29 May 2026
Self-declaration of Quarterly ProgressFile: QUARTELY PROGRESS REPORTS 2026.pdf29 May 2026
Form 1File: FORM 1 2026.pdf29 May 2026
Form 2File: FORM 2 2026.pdf29 May 2026
Form 3File: Form 3 2026.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 2026.pdf29 May 2026
Self-declaration of Quarterly ProgressFile: QUARTELY PROGRESS REPORTS 2026.pdf29 May 2026
Form 1File: FORM 1 2026.pdf29 May 2026
Form 2File: FORM 2 2026.pdf29 May 2026
Form 3File: Form 3 2026.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 2026.pdf29 May 2026
Self-declaration of Quarterly ProgressFile: QUARTELY PROGRESS REPORTS 2026.pdf29 May 2026
Form 1File: FORM 1 2026.pdf29 May 2026
Form 2File: FORM 2 2026.pdf29 May 2026
Form 3File: Form 3 2026.pdf29 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 2026.pdf29 May 2026
Self-declaration of Quarterly ProgressFile: QUARTELY PROGRESS REPORTS 2026.pdf29 May 2026
Form 2A (FY 2026-2027)File: FORM 2A 2026.pdf29 May 2026
Form 5 (FY 2025-2026)File: FORM 5 2026.pdf29 May 2026
Form 2A (FY 2025-2026)File: form -2A-2024.pdf17 Jun 2025
Form 5 (FY 2021-2022)File: CA (Form 5) (FY 2022-23) (1).pdf17 Jun 2025
Form 5 (FY 2022-2023)File: CA (Form 5) (FY 2022-23) (1).pdf17 Jun 2025
Form 5 (FY 2023-2024)File: Certificate 23-24.pdf17 Jun 2025
Form 5 (FY 2024-2025)File: Certificate 24-25.pdf17 Jun 2025
Form 1File: form 1 march 25.pdf16 Jun 2025
Form 2File: form 2 march 25.pdf16 Jun 2025
Form 3File: FORM 3 mar 25.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold 2025.pdf16 Jun 2025
Self-declaration of Quarterly ProgressFile: Rera self declaration - 31-03-2025.pdf16 Jun 2025
Form 1File: form 1 march 25.pdf16 Jun 2025
Form 2File: form 2 march 25.pdf16 Jun 2025
Form 3File: FORM 3 mar 25.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold 2025.pdf16 Jun 2025
Self-declaration of Quarterly ProgressFile: Rera self declaration - 31-03-2025.pdf16 Jun 2025
Form 5 (FY 2018-2019)File: CA (Form 5) (FY 2018-19) (1).pdf8 Jun 2025
Form 5 (FY 2019-2020)File: CA (Form 5) (FY 2019-20) (1).pdf8 Jun 2025
Form 5 (FY 2020-2021)File: CA (Form 5) (FY 2020-21) (1).pdf8 Jun 2025
Form 5 (FY 2017-2018)File: CA (Form 5) (FY 2018-19) (1).pdf7 Jun 2025
Form 1File: form 1 full.pdf6 Jun 2025
Form 2File: Form - 2_ 2024.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf6 Jun 2025
Form 3File: FORM 3 PART 1.pdf6 Jun 2025
OthersFile: FORM 3 PART 2.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf6 Jun 2025
Form 1File: form 1 full.pdf6 Jun 2025
Form 2File: Form - 2_ 2024.pdf6 Jun 2025
Form 3File: FORM 3 PART 1.pdf6 Jun 2025
OthersFile: FORM 3 PART 2.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf6 Jun 2025
Form 1File: form 1 full.pdf6 Jun 2025
Form 2File: Form - 2_ 2024.pdf6 Jun 2025
Form 3File: FORM 3 PART 1.pdf6 Jun 2025
OthersFile: FORM 3 PART 2.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf6 Jun 2025
Form 1File: form 1 full.pdf6 Jun 2025
Form 2File: Form - 2_ 2024.pdf6 Jun 2025
Form 3File: FORM 3 PART 1.pdf6 Jun 2025
OthersFile: FORM 3 PART 2.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf6 Jun 2025
Form 1File: architect abc 2023 form 1.pdf6 Jun 2025
Form 2File: engineer 30112023 form 2.pdf6 Jun 2025
Form 3File: Certificates of CA (Form 3) jan 2024.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold 2023.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf6 Jun 2025
Form 1File: architect abc 2023 form 1.pdf6 Jun 2025
Form 2File: engineer 30112023 form 2.pdf6 Jun 2025
Form 3File: ca october 2023 form 3.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold 2023.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf6 Jun 2025
Form 1File: architect abc 2023 form 1.pdf6 Jun 2025
Form 2File: engineer 30112023 form 2.pdf6 Jun 2025
Form 3File: ca october 2023 form 3.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold 2023.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration - Rera _31_10_2025.pdf6 Jun 2025

How this compares with Thane

81%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 57 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHNA PRESTIGE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD7,600+ in Thane

2 kmKRISHNA PRESTIGECompleted 84Lapsed / revoked 59Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 217 registered projects within 2 km.

Builder: M/s. Arun Bhoomi Corporation

M/s. Arun Bhoomi Corporation has 1 registration on MahaRERA, including KRISHNA PRESTIGE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if KRISHNA PRESTIGE is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNA PRESTIGE?

The registered promoter entity is M/s. Arun Bhoomi Corporation, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNA PRESTIGE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KRISHNA PRESTIGE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KRISHNA PRESTIGE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNA PRESTIGE?

The professionals named in the filing: Architect: TEJS ARCHITECTS AND CONSULTANTS; Engineer: PATEL KULKARNI RCC CONSULTANTS; Engineer: DILIP SHARMA; Chartered Accountant: ANUJ PRADHAN; Chartered Accountant: ANILKUMAR SUTHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA PRESTIGE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA PRESTIGE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA PRESTIGE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.