Registered No litigation declared Residential / Group Housing project

KRISHNA GALAXY

By KRISHNA BUILDERS & DEVELOPERS

RG-MH-03221 · RERA P51700020874 · Last updated on MahaRERA portal: 17 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 42 months from the original
8 of 11Construction stages donefurthest along: Basement (if any), 0%
47 of 104Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

KRISHNA GALAXY is a Residential / Group Housing project by KRISHNA BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700020874 on 15 May 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 42 months from the original filing. 57 of the 104 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameKRISHNA GALAXY
  • TypeResidential / Group Housing
  • Location
    • VARAP
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700020874
  • ReraGenie IDRG-MH-03221

Builder

  • NameKRISHNA BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersRAJESH GULAB BHOIR, AJIT NANA PATIL, SURESH KRISHNANAND TIWARI, KALPANA RAJESH BHOIR, ANJALI SHANKAR ROHRA

Key dates

this monthRegisteredMay 2019First promiseJun 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 May 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed78 files

Current status

55%57 of 104 units booked
83.0%Work done, per cost certificate

Figures as on 17 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA881022104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

BUILDING 1: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,970 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTown Planning & Valuation Department, Thane
Permissible FSI1968.3
Proposed, not sanctioned1,968 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANGA APARTMENT, SHOP NO 1-4 NETAJI CHOWK ULHASNAGAR 421004
Estimated costRs 15.66 cr
Cost incurredRs 13.00 cr
Work done83.05%
BuildingWingEstimatedIncurred
BUILDING 1NARs 15.36 crRs 12.71 cr
-NARs 30.00 lakhRs 29.60 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR RAISINGH M AHUJA
EngineerATUL KUDTARKAR & ASSOCIATES
Chartered AccountantMukesh Gurnani
PartnerRole in project
KRISHNA BUILDERS & DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700016524Jun 2023 → Jun 2024

Reason as filed by the promoterThe project is under construction & we have completed majority of work on the project. However due to imposition of lockdown and consequently migration of labour and contractors we are facing difficulty in arranging the manpower to complete the project on time. Though while registering the project under RERA we were sure to complete the project on time i.e. on our proposed date, but due to this pandemic COVID - 19 it is getting delayed. Hence we request you to grant us the revised date of completion as 29/06/2024 for our Project.

EXT51700024326Jun 2023 → Dec 2025

Reason as filed by the promoterThe project is under construction & we have completed more than 90% work on the project. However due to Scarcity of labours and contractors we are facing difficulty in arranging the manpower to complete the project on time. Though while registering the project under RERA we were sure to complete the project on time i.e. on our proposed date, but due to above circumstances it is getting delayed.

EA16012619480Jun 2023 → Dec 2026

Reason as filed by the promoterThe project is under construction & we have completed more than 95% work on the project. However due to Scarcity of labours and contractors we are facing difficulty in arranging the manpower to complete the project on time. Though while registering the project under RERA we were sure to complete the project on time i.e. on our proposed date, but due to above circumstances it is getting delayed.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q3 Form 1.pdf17 Feb 2026
Withdrawal Update Form 2File: Q3 Form 2.pdf17 Feb 2026
Withdrawal Update Form 3File: Final Form 3 Q3 - Copy.pdf17 Feb 2026
Withdrawal Update Form 1File: Q1 FORM 1- JUNE 25.pdf16 Jan 2026
Withdrawal Update Form 1File: Q2 FORM 1- SEPT25.pdf16 Jan 2026
Withdrawal Update Form 2File: Q1 Form 2 30062025.pdf16 Jan 2026
Withdrawal Update Form 2File: Q2 Form 2 30092025.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 Q1 30062025.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 Q2 300902025.pdf16 Jan 2026
Layout approvalFile: scan-2.pdf27 Dec 2024
Building plan approvalFile: scan-2.pdf27 Dec 2024
Copy of Layout Approval (in case of layout)File: scan-2.pdf27 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Galaxy_Cc_11zon_rotated.pdf27 Dec 2024
Building Plan Approval (IOD)File: scan-2.pdf27 Dec 2024
Certificates of CA (Form 3)File: Form 3 30062024 Signed.pdf9 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A 2023-2024.pdf5 Aug 2024
CERSAI detailsFile: CERSAI_Search_Report_200316081984_For_Asset_Based_Search_05_08_2024_18_11_43_597.pdf5 Aug 2024
CERSAI detailsFile: CERSAI Dec.pdf5 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ajit Patil.pdf5 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Anjali Rohra.pdf5 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Kalpana Bhoir.pdf5 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Rajesh Bhoir.pdf5 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Suresh Tiwari.pdf5 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration.pdf5 Aug 2024
Declaration in FORM BFile: Affidavit cum Declaration (form-B).pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect certificate 30062023.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect certificate 30092023.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Certificate 31122023.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Archtects Certificate 31032024.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect certificate 30062024.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer's certificate 30062023.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer's certificate 30092023.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer's certificate 31122023.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer's certificate 31032024.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 engineer's certificate 30062024.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold.pdf12 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf26 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf22 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf22 May 2023
Certificates of CA (Form 3)File: Form 3 - 2019-20.pdf18 Apr 2023
Certificates of CA (Form 3)File: Form 3 - 2020-21.pdf18 Apr 2023
Certificates of CA (Form 3)File: Form 3 - Dec 2021.pdf18 Apr 2023
Certificates of CA (Form 3)File: Form 3 31032022.pdf18 Apr 2023
Certificates of CA (Form 3)File: Form 3 - 30062022.pdf18 Apr 2023
Certificates of CA (Form 3)File: Form 3 30092022.pdf18 Apr 2023
Certificates of CA (Form 3)File: Form 3 31122022.pdf18 Apr 2023
Certificates of CA (Form 3)File: Form 3 31032023.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 2021-22.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21 KBD.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2022_compressed.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-2022_compressed.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2022_compressed.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-2022_compressed.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2023_compressed.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 31032020.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 31032021.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 31122021_compressed.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 31032022.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 30062022.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 30092022.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 31122022.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 31032023.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2020.pdf5 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2021.pdf5 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2021.pdf5 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Krishna Builders And Developres_compressed.pdf31 May 2021
Proforma of Allotment letterFile: agreement for sale updated.pdf24 Dec 2019
Declaration in FORM BFile: form b krishna BANDD.pdf11 May 2019
Certificates of CA (Form 3)File: RERA CA CERTIFICATE.pdf11 May 2019
Details of encumbrancesFile: noc Krishna builders.pdf2 May 2019
Proforma of Allotment letterFile: KBD Format Allotment letter.pdf29 Apr 2019
Building plan approvalFile: COMMENCEMENT CERTIFICATE.pdf24 Apr 2019
Layout approvalFile: PLAN 1 COMPRESSED.pdf24 Apr 2019
Copy of the legal title reportFile: KBD Title certificate COMPRESSED.pdf24 Apr 2019
Copy of Layout Approval (in case of layout)File: PLAN 1 COMPRESSED.pdf24 Apr 2019
Building Plan Approval (IOD)File: COMMENCEMENT CERTIFICATE.pdf24 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf24 Apr 2019
Proforma of Allotment letterFile: KBD Final RERA Draft aggrement COMPRESSED.pdf24 Apr 2019

How this compares with Thane

55%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 42 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHNA GALAXY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VARAP7,600+ in Thane

2 kmKRISHNA GALAXYCompleted 12Lapsed / revoked 14Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: KRISHNA BUILDERS & DEVELOPERS

KRISHNA BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including KRISHNA GALAXY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if KRISHNA GALAXY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNA GALAXY?

The registered promoter entity is KRISHNA BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNA GALAXY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRISHNA GALAXY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNA GALAXY?

The professionals named in the filing: Architect: AR RAISINGH M AHUJA; Engineer: ATUL KUDTARKAR & ASSOCIATES; Chartered Accountant: Mukesh Gurnani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA GALAXY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA GALAXY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA GALAXY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.