Home / Browse projects / Pune, Maharashtra / Kotwal Business Zone Building A

Completed No litigation declared Commercial project

Kotwal Business Zone Building A

By VISHHRAM DEVELOPERS

RG-MH-52309 · RERA P52100054072 · Last updated on MahaRERA portal: 22 Sep 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 5 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
11 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Kotwal Business Zone Building A is a Commercial project by VISHHRAM DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100054072 on 27 Dec 2023. The registration is recorded completed; possession was promised by 25 Aug 2025. The completion date has moved by 5 months from the original filing. 29 of the 40 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameKotwal Business Zone Building A
  • TypeCommercial
  • Location
    • -
    • Village - Somatane
    • Tal - Mawal
    • Somatane
    • Mawal
    • Pune
    • 410506
  • Pincode410506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054072
  • ReraGenie IDRG-MH-52309

Builder

  • NameVISHHRAM DEVELOPERS
  • Entity typePartnership
  • PartnersJITENDRA SHARAD KOTWAL, SHARAD RAMCHANDRA KOTWAL
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023First promiseMar 2025Revised toAug 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Dec 2023
  • Promised completion25 Aug 2025
  • Revised completionRevised to 25 Aug 2025 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed85 files

Current status

72%29 of 40 units booked
100.0%Work done, per cost certificate

Figures as on 22 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA1104040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

BUILDING A: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed124

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots124
Open Space124

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,265 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Jaideep Sharad KotwalPune (M Corp.)Pune
Jitendra KotwalPune (M Corp.)Pune
Sharad Ramchandra KotwalPune (M Corp.)Pune
Vimal Sharad KotwalPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority
Permissible FSI1265.26
Proposed, not sanctioned1,265 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAshok Sankul II, Rangehill Ashok Co-op Hsg Soc, Bhosale Nagar, Pune - 411007
Estimated costRs 5.15 cr
Cost incurredRs 5.15 cr
Work done100.0%
BuildingWingEstimatedIncurred
BUILDING ANARs 3.43 crRs 3.43 cr
-NARs 1.73 crRs 1.73 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL LONDHE
EngineerAJAY VISHNUJI FULMALI
Chartered AccountantAMP & ASSOCIATES
PartnerRole in project
VISHHRAM DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028014Mar 2025 → Jul 2025

Reason as filed by the promoterWe have applied for an extension of the project since there were some internal conflicts between the partners of the Firm and the construction was halted for a while. The construction has now been resumed and we request for an extension of 4 months. In line with MahaRERA Rules & Regulations In case of allottees with multiple unit bookings shall be considered as one allottee for consent purposes, we have reduced the number of sold units and consent obtained accordingly in the Format B. The actual number of sold units are 19 units, but we have mentioned 15 units (allottees) in the consent as mul

EA09092502548Mar 2025 → Aug 2025

Reason as filed by the promoterWe have completed the project, but we received the OC on 25/08/2025, Hence we are applying for an extension till the date of the OC.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC Cert_PO_537032_486.pdf22 Sep 2025
Form 1File: Architect RERA Cert Building A.pdf5 Sep 2025
Form 2File: Eng RERA Certificate Building A.PDF5 Sep 2025
Form 3File: CA RERA Certificate Building A.PDF5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.PDF5 Sep 2025
Form 1File: Form 1.PDF5 Sep 2025
Form 2File: Form 2.PDF5 Sep 2025
Form 3File: Form 3.PDF5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.PDF5 Sep 2025
Form 1File: Form 1.PDF5 Sep 2025
Form 2File: Form 2.PDF5 Sep 2025
Form 3File: Form 3.PDF5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Building A.PDF5 Sep 2025
Form 1File: Form 1.PDF5 Sep 2025
Form 2File: Form 2.PDF5 Sep 2025
Form 3File: Form 3.PDF5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Promoters Disclosure.PDF5 Sep 2025
Form 1File: Archite certificate KBZ Buildin -A_F.PDF5 Sep 2025
Form 2File: Building A Engineer cerificate_F.pdf5 Sep 2025
Form 3File: Self Declaration No withdrawal Building A-KBZ.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Building A KBZ.pdf5 Sep 2025
Form 1File: Form 1.pdf5 Sep 2025
Form 2File: Form 2.pdf5 Sep 2025
Form 3File: Self Declaratation - No Withdrawal.PDF5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.PDF5 Sep 2025
Withdrawal Update Form 1File: Form 1 A.PDF5 Sep 2025
Withdrawal Update Form 2File: Form 2 A.PDF5 Sep 2025
Withdrawal Update Form 3File: Form 3 A.pdf5 Sep 2025
Form 1File: Architect Certificate A Building.PDF18 Aug 2025
Form 2File: Engineers Certificate A Building.PDF18 Aug 2025
Form 3File: CA Certificate A Building.PDF18 Aug 2025
Disclosure of Sold and Booked InventoryFile: RERA Sold - Unsold Building A.PDF18 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF24 Apr 2025
Declaration in FORM BFile: Form B Building A.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Engineer Certificate KBZ A.PDF6 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 CA Audit Report KBZ Buiklding A.PDF6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosures Building A.PDF27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.PDF19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure.PDF19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng RERA Certificate Building A 300624.PDF8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA Certificate Building A 300624.PDF8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaratation - No Withdrawal.PDF7 May 2024
Proforma of Agreement for saleFile: Agreement Bldg A.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archite certificate KBZ Buildin -A_F.PDF20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Building A Engineer cerificate_F.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration No withdrawal Building A-KBZ.pdf20 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration VD Partnership Deed.PDF12 Dec 2023
Proforma of Agreement for saleFile: Draft Agreement to Sale Building A.pdf12 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report KBZ Building A_compressed.pdf12 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Other Project - S R Kotwal.PDF23 Nov 2023
Other - LegalFile: Partnership Deed VD.PDF23 Nov 2023
Layout approvalFile: Layout with highlighter.pdf4 Nov 2023
Copy of the legal title reportFile: Search Title Report Amenity 1.pdf4 Nov 2023
Copy of Layout Approval (in case of layout)File: Layout with highlighter.pdf4 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Kotwal Busines Zone Building A.pdf4 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: BLDG A- OTHER REAL ESTATE.PDF4 Nov 2023
PAN CardFile: PAN Vishhram Developers.pdf23 Oct 2023
Declaration about Commencement CertificateFile: Declaration of CC.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Building A.pdf20 Oct 2023
Building plan approvalFile: Sanction Plans 2-4.pdf19 Oct 2023
Building plan approvalFile: Sanction Plans 3-4.pdf19 Oct 2023
Building plan approvalFile: Sanction Plans 4-4.pdf19 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.PDF19 Oct 2023
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal.PDF19 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.PDF19 Oct 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Legal.PDF19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 2-4.pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 3-4.pdf19 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plans 4-4.pdf19 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.PDF19 Oct 2023
Declaration in FORM BFile: Form B Promoter.pdf19 Oct 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DAFFODILS BUNGLOW 169 AND BUILDING A B C D E H I JSOMATANE TALUKA MAVAL DIST PUNE145CompletedApr 2016Late, Jul 2017

How this compares with Pune

72%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 5 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kotwal Business Zone Building A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village - Somatane, Tal - Mawal13,700+ in Pune

Builder: VISHHRAM DEVELOPERS

VISHHRAM DEVELOPERS has 3 registrations on MahaRERA, including DAFFODILS K BUILDING and Kotwal Business Zone Building A. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kotwal Business Zone Building A is delayed beyond 25 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kotwal Business Zone Building A?

The registered promoter entity is VISHHRAM DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kotwal Business Zone Building A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kotwal Business Zone Building A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kotwal Business Zone Building A?

The professionals named in the filing: Architect: RAHUL LONDHE; Engineer: AJAY VISHNUJI FULMALI; Chartered Accountant: AMP & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kotwal Business Zone Building A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kotwal Business Zone Building A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kotwal Business Zone Building A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.