Home / Browse projects / Thane, Maharashtra / Kohinoor Majestic

Registration lapsed No litigation declared Residential / Group Housing project

Kohinoor Majestic

By Sonu Anilkumar Hotchandani

RG-MH-02769 · RERA P51700019868 · Last updated on MahaRERA portal: 9 Jan 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
19 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 97%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Kohinoor Majestic is a Residential / Group Housing project by Sonu Anilkumar Hotchandani in Thane, Maharashtra, registered with MahaRERA as P51700019868 on 7 Mar 2019. Possession was promised by 30 Dec 2023 and is now 34 months past that date.

At a glance

Project

  • NameKohinoor Majestic
  • TypeResidential / Group Housing
  • Location
    • Old Agra Road
    • Lal Chowki
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700019868
  • ReraGenie IDRG-MH-02769

Builder

  • NameSonu Anilkumar Hotchandani
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

34 months past promisethis monthRegisteredMar 2019PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Mar 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA170000
Building 2NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 97%.

Building 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Building 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes95%

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
Building 111
Building 244

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,288 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
SONU ANILKUMAR HOTCHANDANIUlhasnagar (M Corp.)Thane
Ramesh HotchandaniUlhasnagar (M Corp.)Thane
Mrs Jayalaxmi Nagindas KamdarMumbai CityMumbai City
Mr Rajan Nagindas KamdarMumbai CityMumbai City
Mr Ashish Suresh WadwaKHADAKPADAThane

Approvals and building plan

Permissible FSI22730.58
Proposed, not sanctioned2,731 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Chopra Court Road, Ulhasnagar 421003

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJohn Varghese
Chartered AccountantVIKAS KAMRA & CO CHARTERED ACCOUNTANTS
PartnerRole in project
Sonu Anilkumar Hotchandani-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jun 2023

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Kohinoor Majestic.pdf9 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 OC - Phase 2_160322.pdf30 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 OC Phase 2_190523.pdf29 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MAJESTIC_11zon.pdf22 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MAJESTIC_11zon.pdf22 Apr 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MAJESTIC_11zon.pdf22 Apr 2023
Certificates of CA (Form 3)File: FORM 3 MAJESTIC_11zon.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 310322 kohinoor majestic.pdf25 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: majestic form 1 31122022.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: majestic form 2 31122022.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: majestic sold and unsold 31122022_11zon.pdf20 Jan 2023
Certificates of CA (Form 3)File: majestic form 3 31122022_11zon.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf12 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate_11zon.pdf12 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf12 Oct 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate_11zon.pdf12 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kohinoor Majestic Form 1 300622.pdf16 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: majestic engineer cert 30062022.pdf16 Jul 2022
Disclosure of sold/ booked inventoryFile: majestic sold unsold 30062022.pdf16 Jul 2022
Certificates of CA (Form 3)File: majestic form 3 30062022.pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 majestic 31032022.pdf6 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 majestic 31032022.pdf6 May 2022
Disclosure of sold/ booked inventoryFile: majestic sold unsold.pdf6 May 2022
Certificates of CA (Form 3)File: form 3 majestic 31032022.pdf6 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 kohinoor majestic fy 20-21.pdf29 Mar 2022
Certificates of CA (Form 3)File: RERA MAJESTIC-compressed.pdf31 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 architect kohinoor majestic-compressed.pdf29 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31122021 Kohinoor Majestic-compressed.pdf29 Jan 2022
Form 2AFile: Form 2A 31122021 Kohinoor Majestic.pdf29 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Kohinoor Majestic proposed society Letter.pdf26 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Architect certificate 30092021.pdf11 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 30092021 MAJESTIC.pdf11 Oct 2021
Form 2AFile: 3 FORM 2A 30092021 MAJESTIC.pdf11 Oct 2021
Disclosure of sold/ booked inventoryFile: 4 KOHINOOR MAJESTIC SOLD UNSOLD 30092021.pdf11 Oct 2021
Certificates of CA (Form 3)File: 5 Form 3 Majestic project 30092021.pdf11 Oct 2021
Certificates of CA (Form 3)File: 5 Form 3 Majestic project 30092021.pdf11 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Certificates of Engineer 30062021.pdf26 Aug 2021
Disclosure of sold/ booked inventoryFile: 4 majestic sold unsold signed.pdf26 Aug 2021
Certificates of CA (Form 3)File: 5 Form 3 Majestic project 30062021 FINAL.pdf26 Aug 2021
Layout approvalFile: Revised Floor Plans dated 010721 pg1to3.pdf16 Aug 2021
Layout approvalFile: Revised Floor Plans dated 010721 pg4to5.pdf16 Aug 2021
Copy of Layout Approval (in case of layout)File: Revised Floor Plans dated 010721 pg1to3.pdf16 Aug 2021
Copy of Layout Approval (in case of layout)File: Revised Floor Plans dated 010721 pg4to5.pdf16 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised CC dated 010721 V1.pdf16 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf30 Jan 2021
Proforma of Allotment letterFile: majestic Agreement draft agreement.pdf18 Mar 2020
Layout approvalFile: Revised Blue Print_compressed.pdf7 Mar 2020
Copy of the legal title reportFile: search reports_compressed.pdf7 Mar 2020
Copy of Layout Approval (in case of layout)File: Revised Blue Print_compressed.pdf7 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf7 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf7 Mar 2020
OtherFile: majestic Agreement draft agreement.pdf6 Mar 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kohinoor Majestic_20191209195940.pdf9 Dec 2019
Form 2AFile: FORM No 2 A For The Quater Ending June 2019.pdf15 Jul 2019
Proforma of Allotment letterFile: Allotment Letter - No Specific Slabs.pdf14 May 2019
Declaration in FORM BFile: Form B - Notarised - Wadhwa Buildcon.pdf4 Mar 2019
Declaration in FORM BFile: Jayalaxmi Kamdar.pdf3 Mar 2019
Declaration in FORM BFile: Rajan Kamdar Compressed.pdf3 Mar 2019
Proforma of Allotment letterFile: Allotment Letter And Declaration For Agreement Draft.pdf2 Mar 2019
Declaration in FORM BFile: Form B - Notarised - Sonu Sir - Compressed.pdf1 Mar 2019
Declaration in FORM BFile: Form B - Notarised - Ramesh Sir - Compressed.pdf1 Mar 2019
Certificates of CA (Form 3)File: Form No 3 - Kohinoor Majestic.pdf1 Mar 2019
Building plan approvalFile: Kohinoor Majestic Plans.pdf28 Feb 2019
Layout approvalFile: Kohinoor Majestic Plans.pdf28 Feb 2019
Copy of the legal title reportFile: Title Certificate.pdf28 Feb 2019
Details of encumbrancesFile: No Encumbrances - Majestic.pdf28 Feb 2019
Copy of Layout Approval (in case of layout)File: Kohinoor Majestic Plans.pdf28 Feb 2019
Building Plan Approval (IOD)File: Kohinoor Majestic Plans.pdf28 Feb 2019
PAN CardFile: PAN Card Of Sonu Hotchandani.pdf27 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Of Majestic.pdf27 Feb 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Kohinoor LifestyleNear Taragan Society Khadakpada Wayle Nagar Kalyan West72CompletedJun 2020Jun 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kohinoor Majestic on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lal Chowki7,600+ in Thane

2 kmKohinoor MajesticCompleted 90Lapsed / revoked 48Other 138Dot size: filed unitsN

Filed coordinates, straight-line distance. 276 registered projects within 2 km.

Builder: Sonu Anilkumar Hotchandani

Sonu Anilkumar Hotchandani has 1 registration on MahaRERA, including Kohinoor Majestic. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Kohinoor Majestic shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Kohinoor Majestic is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kohinoor Majestic?

The registered promoter entity is Sonu Anilkumar Hotchandani, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kohinoor Majestic?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kohinoor Majestic?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kohinoor Majestic?

The professionals named in the filing: Architect: John Varghese; Chartered Accountant: VIKAS KAMRA & CO CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kohinoor Majestic?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kohinoor Majestic. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kohinoor Majestic to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.