Home / Browse projects / Pune, Maharashtra / KOHINOOR FAMVILLE
KOHINOOR FAMVILLE
By YELLOWSTONE SKYSCRAPERS LLP
RG-MH-75274 · RERA P52100051623 · Last updated on MahaRERA portal: 22 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KOHINOOR FAMVILLE is a Others project by YELLOWSTONE SKYSCRAPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100051623 on 27 Jun 2023. Possession is promised by 31 Dec 2028. 633 of the 736 units on this registration are recorded sold or booked, and 19 of 55 construction stages are filed complete.
At a glance
Project
- NameKOHINOOR FAMVILLE
- TypeOthers
- Location
- S No 284/3
- Maan
- Man
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051623
- ReraGenie IDRG-MH-75274
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jun 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings5 building records
- Documents filed95 files
Current status
Figures as on 22 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A1 | NA | 22 | 20 | 160 | 0 | 160 |
| Tower B1 | NA | 22 | 20 | 108 | 0 | 108 |
| Tower B2 | NA | 22 | 20 | 108 | 0 | 108 |
| Tower C1 | NA | 22 | 20 | 180 | 0 | 180 |
| Tower C2 | NA | 22 | 20 | 143 | 37 | 180 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
19 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Stilt Floor, at 90%.
Tower A161%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 35% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 12% |
Tower B156%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 58% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Tower B255%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 88% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Tower C155%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Tower C254%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 78% |
| Plinth | 100% |
| Stilt Floor | 87% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed205
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Tower A1 | 1 | 51 | 52 |
| Tower B1 | 1 | 45 | 46 |
| Tower B2 | 1 | 24 | 25 |
| Tower C1 | 1 | 54 | 55 |
| Tower C2 | 1 | 26 | 27 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MEDHA KHOLE | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower C2 | NA | Rs 56.83 cr | Rs 34.42 cr |
| Tower A1 | NA | Rs 54.46 cr | Rs 34.42 cr |
| Tower C1 | NA | Rs 54.46 cr | Rs 34.42 cr |
| Tower B2 | NA | Rs 37.89 cr | Rs 34.42 cr |
| Tower B1 | NA | Rs 35.52 cr | Rs 34.42 cr |
| - | NA | Rs 17.54 cr | Rs 8.47 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK a architecture |
| Engineer | Planedge Consultants Private Limited |
| Chartered Accountant | Vinod Nikam and Co |
| Chartered Accountant | JAYESH N JAIN & ASSOCIATES |
| Chartered Accountant | BHANDARI S A A J & ASSOCIATES |
| Partner | Role in project |
|---|---|
| YELLOWSTONE SKYSCRAPERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1- Famville.pdf | 22 Apr 2026 |
| Withdrawal Update Form 2File: Form 02_Famville.pdf | 22 Apr 2026 |
| Withdrawal Update Form 3File: Form 03_Famville.pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1_FAMVILLE.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 02_Famville.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 03_Famville.pdf | 20 Jan 2026 |
| Form 2A (FY 2024-2025)File: Form 2A_Famville.pdf | 15 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 05_Famville.pdf | 7 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1-FAMVILLE.pdf | 24 Oct 2025 |
| Withdrawal Update Form 2File: Form 02_Farmville.pdf | 24 Oct 2025 |
| Withdrawal Update Form 3File: Form 03_Famville.pdf | 24 Oct 2025 |
| Form 1File: Famville.pdf | 11 Aug 2025 |
| Form 2File: Form 02_Famville.pdf | 11 Aug 2025 |
| Form 3File: Form 03_Famville.pdf | 11 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: kohinoor Famville.pdf | 11 Aug 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02_Famville.pdf | 9 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03_Famville.pdf | 6 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 K FAMVILLE.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_FAMVILLE.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_FAMVILLE.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Famville.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_K FAMVILLE.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kohinoor Famville.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Kohinoor Famville.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Famville.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Kohinoor Famville.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-01 Q1 FY 24-25 K FAMVILLE.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02 Q1 FY 24-25 FAMVILLE.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-03 Q1 FY 24-25 FAMVILLE.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kohinoor famville.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FAMVILLE.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 KOHINOOR FAMVILLE.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 KOHINOOR FAMVILLE.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3.pdf | 14 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1.pdf | 13 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3.pdf | 13 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1.pdf | 13 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1.pdf | 13 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Famville_compressed.pdf | 20 Jan 2024 |
| Layout approvalFile: 01_compressed.pdf | 17 Nov 2023 |
| Building plan approvalFile: 04_compressed.pdf | 17 Nov 2023 |
| Building plan approvalFile: 05_compressed.pdf | 17 Nov 2023 |
| Building plan approvalFile: 12_compressed.pdf | 17 Nov 2023 |
| Building plan approvalFile: 15_compressed.pdf | 17 Nov 2023 |
| Building plan approvalFile: 16_compressed.pdf | 17 Nov 2023 |
| Building plan approvalFile: 21_compressed.pdf | 17 Nov 2023 |
| Building plan approvalFile: 23_compressed.pdf | 17 Nov 2023 |
| Building plan approvalFile: 24_compressed.pdf | 17 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 01_compressed.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 04_compressed.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 05_compressed.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 12_compressed.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 15_compressed.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 16_compressed.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 21_compressed.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 23_compressed.pdf | 17 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 24_compressed.pdf | 17 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 231109_CC_Rev2_compressed.pdf | 17 Nov 2023 |
| Declaration about Commencement CertificateFile: CC declaration || Revised.pdf | 17 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Famville.pdf | 2 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Famville.pdf | 2 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form03Famville_compressed.pdf | 2 Nov 2023 |
| Proforma of Agreement for saleFile: Famville - Tagg draft 2_compressed.pdf | 7 Aug 2023 |
| Copy of the legal title reportFile: RERA-TSR - Maan.pdf | 8 Jun 2023 |
| PAN CardFile: Declaration.pdf | 7 Jun 2023 |
| CERSAI detailsFile: Cersai Declaration.pdf | 29 May 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrances legal New.pdf | 19 May 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrances legal New.pdf | 19 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Ac Declaration.pdf | 28 Apr 2023 |
| Layout approvalFile: LAYOUT.pdf | 27 Apr 2023 |
| Building plan approvalFile: A1.pdf | 27 Apr 2023 |
| Building plan approvalFile: B1.pdf | 27 Apr 2023 |
| Building plan approvalFile: B2.pdf | 27 Apr 2023 |
| Building plan approvalFile: C1.pdf | 27 Apr 2023 |
| Building plan approvalFile: C2.pdf | 27 Apr 2023 |
| Building plan approvalFile: PARKING.pdf | 27 Apr 2023 |
| PAN CardFile: Yellowstone Skyscrapers LLP.pdf | 27 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf | 27 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Financial Encumbrance.pdf | 27 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 27 Apr 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KOHINOOR FAMVILLE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Maan13,700+ in Pune
Filed coordinates, straight-line distance. 58 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: YELLOWSTONE SKYSCRAPERS LLP
YELLOWSTONE SKYSCRAPERS LLP has 5 registrations on MahaRERA, including KOHINOOR CORAL and PRESIDENTIA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if KOHINOOR FAMVILLE is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KOHINOOR FAMVILLE?
The registered promoter entity is YELLOWSTONE SKYSCRAPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KOHINOOR FAMVILLE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KOHINOOR FAMVILLE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KOHINOOR FAMVILLE?
The professionals named in the filing: Architect: VK a architecture; Engineer: Planedge Consultants Private Limited; Chartered Accountant: Vinod Nikam and Co; Chartered Accountant: JAYESH N JAIN & ASSOCIATES; Chartered Accountant: BHANDARI S A A J & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KOHINOOR FAMVILLE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback