Home / Browse projects / Pune, Maharashtra / KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD

Registered No litigation declared Residential / Group Housing project

KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD

By BELVALKAR HOUSING LLP

RG-MH-70345 · RERA P52100054356 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 18.00 crore secured on the land, in favour of AU Small Finance Bank Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 70%
50 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD is a Residential / Group Housing project by BELVALKAR HOUSING LLP in Pune, Maharashtra, registered with MahaRERA as P52100054356 on 15 Jan 2024. Possession is promised by 31 Dec 2027. 2 of the 52 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameKIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD
  • TypeResidential / Group Housing
  • Location
    • SHIVTEERTH NAGAR
    • KOTHRUD
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054356
  • ReraGenie IDRG-MH-70345

Builder

  • NameBELVALKAR HOUSING LLP
  • Entity typePartnership
  • LLPINAAD-1077
  • GSTIN27AAOFB7578A1Z8
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Designated PartnersSameer Sharatchandra Belvalkar, Neel BELVALKAR
  • Other registrations12 more →
  • Completed1 of 13
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

4%2 of 52 units booked
46.4%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KIRLOSKAR OIL ENGINE KAAMGAR CO-OP HOUSING SOCIETY LTDNA141352052

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

KIRLOSKAR OIL ENGINE KAAMGAR CO-OP HOUSING SOCIETY LTD: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered42
Open Space34

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,164 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAU Small Finance Bank Limited
Secured amountRs 18.00 crore
CERSAI search filedYes
Declared on2 Aug 2025
LandownerVillageDistrict
KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETYPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune muncipal Corporation
Permissible FSI5099.92
Proposed, not sanctioned5,100 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 102 and 103 Plot No 96 part 2 and CTS No 1132 1133 New Survey No 184 Anand Park Aundh Pune 411007
Estimated costRs 18.34 cr
Cost incurredRs 8.51 cr
Work done46.42%
BuildingWingEstimatedIncurred
KIRLOSKAR OIL ENGINE KAAMGAR CO-OP HOUSING SOCIETY LTDNARs 16.77 crRs 8.04 cr
-NARs 1.57 crRs 47.03 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Mangesh Gotal
ArchitectSiddharth Harischandrakar
EngineerVivek Chavan
Chartered AccountantCA Pushpak Bogati
Chartered AccountantPushpa Bogati
PartnerRole in project
BELVALKAR HOUSING LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM_01_KIRLOSKAR_MAR26.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM_02_KIRLOSKAR_MAR 26.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3 MARCH 26- KIRLOSKAR.pdf24 Apr 2026
Withdrawal Update Form 1File: FORM_01_KIRLOSKAR_DEC 25.pdf17 Feb 2026
Withdrawal Update Form 2File: FORM_02_KIRLOSKAR_DEC 25.pdf17 Feb 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025 KIRLOSKAR.pdf17 Feb 2026
Form 1File: FORM_01_KIRLOSKAR_MAR'25.pdf19 Nov 2025
Form 2File: FORM02_KIRLOSKAR_MAR'25.pdf19 Nov 2025
Form 3File: FORM 3 MARCH 2025 old.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of SOLD_March 2025.pdf19 Nov 2025
Form 1File: ARCH_RERA_MAR'24_KIRLOSKAR.pdf18 Nov 2025
Form 2File: FORM2_KIRLOSKAR_MAR'24.pdf18 Nov 2025
Form 3File: 01 BHLLP From 3 Rera Kirloskar soc Mar 24.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: 01 BHLLP Sold Unsold Inventory Mar 24 kirloskar.pdf18 Nov 2025
Form 1File: Kirloskar F1 June 24.pdf18 Nov 2025
Form 2File: FORM2_KIRLOSKAR_JUNE'24.pdf18 Nov 2025
Form 3File: 02 BHLLP From 3 Rera Kirloskar soc Jun 24.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: 02 BHLLP Sold Unsold Inventory jun 2024 kirloskar.pdf18 Nov 2025
Form 1File: ARCH_RERA_SEPT'24_KIRLOSKAR.pdf18 Nov 2025
Form 2File: BHLLP_FORM2_KIRLOSKAR_SEPT'24.pdf18 Nov 2025
Form 3File: 03 BHLLP From 3 Rera kirloskar soc Sep 24.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: 03 BHLLP Sold Unsold Inventory Sep 24 kirloskar.pdf18 Nov 2025
Form 1File: FORM 01_ARCH_KIRLOSKAR_DEC'24.pdf18 Nov 2025
Form 2File: FORM 02_KIRLOSKAR_DEC'24.pdf18 Nov 2025
Form 3File: Uploaded Kirloskar Dec 24 F3.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold iventery dec 2024.pdf18 Nov 2025
Layout approvalFile: Hilighted Layout.pdf17 Oct 2025
Building plan approvalFile: Building Plan 1.pdf17 Oct 2025
Building plan approvalFile: Building Paln 2.pdf17 Oct 2025
Withdrawal Update Form 1File: FORM_01_KIRLOSKAR_Sept’25 (1).pdf17 Oct 2025
Withdrawal Update Form 2File: FORM_02_KIRLOSKAR_Sept’25.pdf17 Oct 2025
Withdrawal Update Form 3File: kirloskar form 3_Sep 2025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Kirloskar Form 5.pdf5 Sep 2025
Withdrawal Update Form 1File: Form 1_Kirloskar_June 2025.pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2_Kirloskar_June 2025.pdf25 Aug 2025
Withdrawal Update Form 3File: FORM 3 KIRLOSKAR_June 2025.pdf25 Aug 2025
Declaration in FORM BFile: Kirloskar form B (1).pdf24 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kirloskar Dec 24 F3.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - SHANTI BHRMHA DEC 2024.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 02_KIRLOSKAR_DEC'24.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_RERA_MAR'24_KIRLOSKAR.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kirloskar F1 June 24.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_RERA_SEPT'24_KIRLOSKAR.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 01_ARCH_KIRLOSKAR_DEC'24.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_KIRLOSKAR_MAR'24.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_KIRLOSKAR_JUNE'24.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BHLLP_FORM2_KIRLOSKAR_SEPT'24.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A KIRLOSAKAR.pdf6 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023 to 24.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 BHLLP From 3 Rera Kirloskar soc Mar 24.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 BHLLP From 3 Rera Kirloskar soc Jun 24.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 BHLLP From 3 Rera kirloskar soc Sep 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: 04 BHLLP Sold Unsold Inventory Mar 24 kirloskar.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: 05 BHLLP Sold Unsold Inventory jun 2024 kirloskar.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: 06 BHLLP Sold Unsold Inventory Sep 24 kirloskar.pdf27 Jan 2025
Proforma of Agreement for saleFile: RERA ATS Kirloskar.pdf28 Dec 2024
Details of encumbrances concerned to FinanceFile: encumbrance of finance kirloskar.pdf26 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-Declaration about RERA Designated Bank Accounts for Real Estate Project-Kirloskar26 Dec 2024
Details of encumbrances concerned to LegalFile: encumbrance of finance kirloskar.pdf26 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B -KIRLOSKAR- NEW.pdf26 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured kirloskar (2).pdf26 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: CA Certification for Secured or Unsecured Disclosure.pdf26 Dec 2024
Proforma of Agreement for saleFile: AFS Kirloskar_Jan24.pdf8 Jan 2024
Other - LegalFile: Belvalkar Housing LLP DEED.pdf23 Nov 2023
Other - LegalFile: Belvalkar Housing LLP Certificate of Incorporation.pdf23 Nov 2023
Other - TechnicalFile: Architect Statement.pdf23 Nov 2023
Other - LegalFile: POA Kirloskar - 19528-2023_Part1.pdf22 Nov 2023
Other - LegalFile: POA Kirloskar - 19528-2023_Part2.pdf22 Nov 2023
Other - LegalFile: POA Kirloskar - 19528-2023_Part3.pdf22 Nov 2023
Other - LegalFile: POA Kirloskar - 19528-2023_Part4.pdf22 Nov 2023
Other - LegalFile: POA Kirloskar - 19528-2023_Part4.pdf22 Nov 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf18 Nov 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf18 Nov 2023
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf18 Nov 2023
PAN CardFile: 1 PAN Card (2).pdf18 Nov 2023
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf18 Nov 2023
Details of encumbrances concerned to FinanceFile: No Encumbrances Legal Kirloskar.pdf18 Nov 2023
Details of encumbrances concerned to LegalFile: No Encumbrances Legal Kirloskar.pdf18 Nov 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf18 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf18 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Kalpak Co Op Hsg SocietyP52100045697Kothrud, Pune23Jun 2022CompletedMay 2024May 2024

How this compares with Pune

4%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING S on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOTHRUD13,700+ in Pune

2 kmKIRLOSKAR OIL ENGINE KAACompleted 92Lapsed / revoked 49Other 149Dot size: filed unitsN

Filed coordinates, straight-line distance. 290 registered projects within 2 km.

Builder: BELVALKAR HOUSING LLP

BELVALKAR HOUSING LLP has 13 registrations on MahaRERA, including Snehshilp and Kalpak Co Op Hsg Society. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD?

The registered promoter entity is BELVALKAR HOUSING LLP, a partnership as per the filing. Its LLPIN AAD-1077 and GSTIN 27AAOFB7578A1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD?

The professionals named in the filing: Architect: Ar Mangesh Gotal; Architect: Siddharth Harischandrakar; Engineer: Vivek Chavan; Chartered Accountant: CA Pushpak Bogati; Chartered Accountant: Pushpa Bogati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING SOCIETY LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KIRLOSKAR OIL ENGINE KAAMGAR CO OP HOUSING S to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.