Home / Browse projects / Pune, Maharashtra / KIRAN SUFAL

Completed No litigation declared Others project

KIRAN SUFAL

By M/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE

RG-MH-16874 · RERA P52100027275 · Last updated on MahaRERA portal: 20 Jan 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
11 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

KIRAN SUFAL is a Others project by M/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE in Pune, Maharashtra, registered with MahaRERA as P52100027275 on 1 Dec 2020. The registration is recorded completed; possession was promised by 29 Dec 2024. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameKIRAN SUFAL
  • TypeOthers
  • Location
    • -
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100027275
  • ReraGenie IDRG-MH-16874

Builder

  • NameM/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE
  • Entity typeIndividual
  • Other registrations10 more →
  • Completed10 of 11
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredDec 2020First promiseDec 2023Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Dec 2020
  • Promised completion29 Dec 2024
  • Revised completionRevised to 29 Dec 2024 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed119 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KIRAN SUFALNA140000
-NA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

KIRAN SUFAL91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
-9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes99%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered31

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,888 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SANTOSH APPASAHEB KALATE AND OTHERSWakadPune
SANTOSH A KALATE AND OTHERSWakadPune

Approvals and building plan

Permissible FSI16578.0
Proposed, not sanctioned9,515 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRABHAT ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACEMEKK DESIGNERS PVT LTD
EngineerSWARUP ZADE
Chartered AccountantA M SADAVARTE AND CO
PartnerRole in project
M/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018232Dec 2023 → Dec 2024

Reason as filed by the promoterConstruction work is not completed because of delayed in revised sanction.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jan 2025

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kiran Sufal form 1.pdf20 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Kiran Sufal Form 4 31 12 24.pdf20 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Kiran Sufal Completion Certifcate.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Kiran Sufal Form 5.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Kiran Sufal Inventory.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Kiran Sufal.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Kiran Sufal-30-6-2024.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: Kiran Sufal- Sold Unsold 30-6-24.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 -Kiran Sufal-31-3-2024.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold-Kiran Sufal-31-3-2024.pdf12 Apr 2024
Layout approvalFile: 1 (5)_compressed (2).pdf18 Mar 2024
Building plan approvalFile: 2 (3)_compressed (2).pdf18 Mar 2024
Building plan approvalFile: 3 (5)_compressed (2).pdf18 Mar 2024
Building plan approvalFile: 4 (2)_compressed (2).pdf18 Mar 2024
Building plan approvalFile: 5 (1)_compressed (2).pdf18 Mar 2024
Building plan approvalFile: 6_compressed (2).pdf18 Mar 2024
Building plan approvalFile: 7_compressed (2).pdf18 Mar 2024
Building plan approvalFile: 8_compressed (2).pdf18 Mar 2024
Copy of Layout Approval (in case of layout)File: 1 (5)_compressed (2).pdf18 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 (3)_compressed (2).pdf18 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 (5)_compressed (2).pdf18 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 (2)_compressed (2).pdf18 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 (1)_compressed (2).pdf18 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 6_compressed (2).pdf18 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_compressed (2).pdf18 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 8_compressed (2).pdf18 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC (13).pdf18 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kiran Sufal- Form 2-24-1-24.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kiran Sufal Form 1-31-3-2021.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kiran Sufal Form 1-30-09-2022.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kiran Sufal Form 1-30-06-2023.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kiran Sufal Form 1-30-09-2023.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SUFAL C_20240130_0001_compressed.pdf31 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SUFAL B_20240130_0001.pdf31 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SUFAL A_20240130_0001.pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold- Sufal -31-12-23.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 -Sufal -31-12-23.pdf10 Jan 2024
Layout approvalFile: LAYOUT 1_11zon.pdf21 Dec 2023
Building plan approvalFile: 2-8_11zon.pdf21 Dec 2023
Building plan approvalFile: 3-8_11zon (1).pdf21 Dec 2023
Building plan approvalFile: 4-8_11zon.pdf21 Dec 2023
Building plan approvalFile: 5-8_11zon.pdf21 Dec 2023
Building plan approvalFile: 6-8_11zon.pdf21 Dec 2023
Building plan approvalFile: 7-8_11zon.pdf21 Dec 2023
Building plan approvalFile: 8-8.pdf21 Dec 2023
Copy of Layout Approval (in case of layout)File: LAYOUT 1_11zon.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 2-8_11zon.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 3-8_11zon (1).pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 4-8_11zon.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 5-8_11zon.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 6-8_11zon.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 7-8_11zon.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 8-8.pdf21 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Kiran Sufal- Revised CC.pdf5 Dec 2023
Building plan approvalFile: Fonrt Elvation_compressed.pdf4 Dec 2023
Building plan approvalFile: Ground Floor_compressed.pdf4 Dec 2023
Building plan approvalFile: 1st AND 2nd floor.pdf4 Dec 2023
Layout approvalFile: layout_compressed.pdf4 Dec 2023
Building plan approvalFile: 3rd,5th,9th, AND 4th 6th 8th floor.pdf4 Dec 2023
Building plan approvalFile: 3rd,5th,9th, AND 4th 6th 8th floor_compressed (1).pdf4 Dec 2023
Building plan approvalFile: 7th AND 10th floor_compressed (1).pdf4 Dec 2023
Building plan approvalFile: Terrace floor_compressed.pdf4 Dec 2023
Copy of Layout Approval (in case of layout)File: layout_compressed.pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Fonrt Elvation_compressed.pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Ground Floor_compressed.pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 1st AND 2nd floor.pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 3rd,5th,9th, AND 4th 6th 8th floor.pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 3rd,5th,9th, AND 4th 6th 8th floor_compressed (1).pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 7th AND 10th floor_compressed (1).pdf4 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Terrace floor_compressed.pdf4 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf4 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold-Kiran Sufal- Sept-23.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Kiran Sufal - Sep 23.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A - Kiran Sufal- Sept-23.pdf13 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Kiran Sufal- Quality Assurance 30-06-2023.pdf1 Sep 2023
Disclosure of sold/ booked inventoryFile: Kiran Sufal- Sold Unsold 31-03-2023.pdf1 Sep 2023
Disclosure of sold/ booked inventoryFile: Kiran Sufal- Sold Unsold -30-06-2023.pdf1 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf31 May 2023
Disclosure of sold/ booked inventoryFile: Kiran Sufal-Sold Unsold -31-12-2022.pdf16 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Kiran Sufal March 2022.pdf5 May 2023

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Kiran ShubhlabhMohan Nagar soc Baner Pune 4110458CompletedMay 2015Late, Aug 2015
Kiran Silver DewS no 52 Part Susgaon Pune20CompletedJan 2015Late, Mar 2015
Kiran SphurteePart of S no 47 A Susgaon Pune 4110458CompletedSep 2014Late, Nov 2014
Kiran ShubhshreeMohan nagar soc Baner Pune 4110458CompletedMay 2014Late, Jun 2014
Kiran SolitaireS no 278 Part Susgaon Pune 41104532CompletedJan 2014Late, May 2014

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KIRAN SUFAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

Builder: M/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE

M/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE has 11 registrations on MahaRERA, including Kiran Sanklp and Kiran Suyog. Its filings disclose 5 earlier MahaRERA projects: declares 0 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KIRAN SUFAL is delayed beyond 29 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KIRAN SUFAL?

The registered promoter entity is M/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KIRAN SUFAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KIRAN SUFAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KIRAN SUFAL?

The professionals named in the filing: Architect: SPACEMEKK DESIGNERS PVT LTD; Engineer: SWARUP ZADE; Chartered Accountant: A M SADAVARTE AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KIRAN SUFAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KIRAN SUFAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KIRAN SUFAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.