ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / KINGSMARQUE HEIGHTS

Registered No litigation declared Others project

KINGSMARQUE HEIGHTS

By KINGSMARQUE DEVELOPERS

RG-MH-29697 · RERA P99000028995 · Last updated on MahaRERA portal: 2 May 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 29 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedmoved 29 months from the original
0 of 11Construction stages donefurthest along: Excavation, 0%
19 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

KINGSMARQUE HEIGHTS is a Others project by KINGSMARQUE DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000028995 on 23 Apr 2021. Possession is promised by 5 Aug 2027. The completion date has moved by 29 months from the original filing. 7 of the 26 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameKINGSMARQUE HEIGHTS
  • TypeOthers
  • Location
    • MANVELPADA ROAD
    • OPP BANK OF BARODA
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • RERA no.P99000028995
  • ReraGenie IDRG-MH-29697

Builder

  • NameKINGSMARQUE DEVELOPERS
  • Entity typePartnership
  • PartnersPRANITA PANKAJ THAKUR, SANTOSH ASHOK CHATURVEDI

Key dates

this monthRegisteredApr 2021First promiseMar 2025Revised toAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2021
  • Promised completion5 Aug 2027
  • Revised completionRevised to 5 Aug 2027 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed93 files

Current status

27%7 of 26 units booked

Figures as on 2 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KINGSMARQUE HEIGHTSNA6620626

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

KINGSMARQUE HEIGHTS: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered1
Open Space7

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,260 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Aug 2025
LandownerVillageDistrict
PRANITA P. THAKURVasai-Virar City (M Corp)Palghar
FRANCIS SIMON RODRIGUESVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI10261.3
Proposed, not sanctioned1,140 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMHATRE WADI VIRAR WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKULDEEP PATIL
EngineerSHILPLEKHA CONSULTANT
Chartered AccountantDOLLY MILAN ASHER ASHAR
PartnerRole in project
KINGSMARQUE DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000028356Mar 2025 → Aug 2027

Reason as filed by the promoterdispute among the partners and landowners but now the dispute has been resolved.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 5 Aug 2027

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 6 21 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 3 21 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 31 12 24 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 30 9 24 new.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30 6 24 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31 03 24 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30 06 23 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31 12 22 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31 3 2023 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 09 22 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 06 22 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 03 22 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31 12 21 NEW.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30 9 21 NEW.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30 6 24 new.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31 03 2024 new.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-12-23 new.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31 12 24 NEW.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31 3 23 new.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-23 new.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30 9 24 NEW.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30 06 23 new.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1 31 03 24 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 1 31 3 21 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 1 30 6 21 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 1 30 9 21 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 1 31 12 21 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 1 31 03 22 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 1 31 03 22 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 1 31 06 22 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 1 31 06 22 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1 31 12 22 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1 31 3 2023 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1 30 06 23 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1 30 09 23 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1 31 12 23 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-1 30 6 24 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -1 30 9 24 new.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -1 31 12 24 NEW.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 1 30 09 22 NEW.pdf2 May 2025
Commencement Certificates / NA Order for plotted developmentFile: plinth cerificate.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold 30 6 23.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold 30 9 24.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold 31 3 23.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold 31 12 22.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold 31 12 24.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold 31 12 23.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold 31 12 23.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold 30 9 23.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold 30 6 24.pdf2 May 2025
Details of encumbrances concerned to FinanceFile: kingsmarque developers encum legal.pdf24 Apr 2025
Proforma of Allotment letterFile: Kings developer Annexure -1.pdf24 Apr 2025
Declaration in FORM BFile: form b new.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 3 April 25 SIGNED.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 merged_organized.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 , 3 April 2025 SIGNED.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Quality Certificate 2020.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2021.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Kingsmarque Developer Disclosure of sol Unsold.pdf24 Apr 2025
Declaration about Commencement CertificateFile: Kings Developer Declaration About Commencement Certificate.pdf24 Apr 2025
CERSAI detailsFile: Kings Devloper Cersai Declaration For the Project Name.pdf24 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Kings devloper Format A Declaration of Rera.pdf24 Apr 2025
Deviation Report with respect to Allotment letterFile: Kings Developer Deviation Report For Allotment letter.pdf24 Apr 2025
Details of encumbrances concerned to LegalFile: kingsmarque developers encum legal.pdf24 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Kings Developer Deviation Report of Aggreement sale.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality Certificate 2022.pdf24 Apr 2025
Proforma of Agreement for saleFile: agreement for sale model.pdf24 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Kingsmarque Developers Disclosure of Interest.pdf24 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Mr Roshan Sawant.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Certificate 2023.pdf24 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Kingsmarque Developer Bank Report Form 5.pdf24 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Certification 2024.pdf24 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf24 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Kings Developer Disclosure For secuerd Unsecured.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KMD Form 3 Final.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: KMD Form 5 2017-18 1_compressed.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KMD Form 5 2018-19.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KMD Form 5 2019-20.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KMD Form 5 2020-21.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KMD Form 5 2021-22.pdf22 Feb 2023

How this compares with Palghar

27%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 29 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KINGSMARQUE HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP BANK OF BARODA3,200+ in Palghar

Builder: KINGSMARQUE DEVELOPERS

KINGSMARQUE DEVELOPERS has 1 registration on MahaRERA, including KINGSMARQUE HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if KINGSMARQUE HEIGHTS is delayed beyond 5 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KINGSMARQUE HEIGHTS?

The registered promoter entity is KINGSMARQUE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KINGSMARQUE HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KINGSMARQUE HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KINGSMARQUE HEIGHTS?

The professionals named in the filing: Architect: KULDEEP PATIL; Engineer: SHILPLEKHA CONSULTANT; Chartered Accountant: DOLLY MILAN ASHER ASHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KINGSMARQUE HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KINGSMARQUE HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KINGSMARQUE HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.