Registered No litigation declared Residential / Group Housing project

KINGSMAN RESIDENCY

By SHREE SWASTIK CONSTRUCTIONS

RG-MH-19314 · RERA P51700078440 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 28.00 crore secured on the land, in favour of PIRAMAL TRUSTEESHIP SERVICES PRIVATE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedmoved 4 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 78%
131 of 143Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 145 documents Report an error

KINGSMAN RESIDENCY is a Residential / Group Housing project by SHREE SWASTIK CONSTRUCTIONS in Thane, Maharashtra, registered with MahaRERA as P51700078440 on 12 Dec 2024. Possession is promised by 30 Oct 2028. The completion date has moved by 4 months from the original filing. 12 of the 143 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameKINGSMAN RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Mohinder Singh Kabul Singh Road
    • Kalyan West
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700078440
  • ReraGenie IDRG-MH-19314

Builder

  • NameSHREE SWASTIK CONSTRUCTIONS
  • Entity typePartnership
  • PartnersMANOJ DINKAR DHOBALE, SMITA PRATAP DHOBLE
  • PartnerPRATAP CHANDRAKANT DHOBLE
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2024First promiseJun 2028Revised toOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Dec 2024
  • Promised completion30 Oct 2028
  • Revised completionRevised to 30 Oct 2028 (originally 30 Jun 2028)
  • Buildings1 building record
  • Documents filed145 files

Current status

8%12 of 143 units booked
50.3%Work done, per cost certificate

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KINGSMAN RESIDENCYNA131210439143

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 78%.

KINGSMAN RESIDENCY: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered97

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,984 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofPIRAMAL TRUSTEESHIP SERVICES PRIVATE LIMITED
Secured amountRs 28.00 crore
CERSAI search filedYes
Declared on24 Jul 2026
LandownerVillageDistrict
Maa Godavari Co Op Housing Society ltdKalyanThane
Swapnagandha Co op housing Society LtdKalyanThane
SHREE SWASTIK CONSTRUCTIONKalyanThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNCIPAL CORPORATION, KALYAN
Permissible FSI9076.44
Proposed, not sanctioned9,076 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch3 AND 4 , SHELAR PARK, KALYAN-421301
Estimated costRs 30.39 cr
Cost incurredRs 15.29 cr
Work done50.31%
BuildingWingEstimatedIncurred
KINGSMAN RESIDENCYNARs 28.39 crRs 15.29 cr
-NARs 2.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBINOD TRIPATHI
EngineerInfinity Consultants
EngineerBipin Dinesh Gaikar
Chartered AccountantCA KARAN DUDANI
PartnerRole in project
SHREE SWASTIK CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51700078440/WarJun 2028 → Oct 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2028

Documents filed145

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf7 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf7 Aug 2026
Withdrawal Update Form 1File: Form-1 Kingsman Q1.pdf24 Jul 2026
Withdrawal Update Form 2File: Form-2 Kingsman Q1.pdf24 Jul 2026
Withdrawal Update Form 3File: Form-3 Kingsman Q1.pdf24 Jul 2026
Form 1File: Form-1.pdf22 May 2026
Form 2File: Form-2.pdf22 May 2026
Form 3File: form-3 Udin Kingsman.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold And Booked Inventories.pdf22 May 2026
Form 1File: Form 1 Kingsman.pdf20 Jan 2026
Form 2File: Form 2 Kingsman.pdf20 Jan 2026
Form 3File: Form-3 kingsman signed.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold and Booked inventory.pdf20 Jan 2026
Form 1File: ARCHITECTS FORM 1.pdf12 Nov 2025
Form 2File: Form 2.pdf12 Nov 2025
Form 3File: Kingsman form 3 udin com.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold and booked inventory.pdf12 Nov 2025
Form 1File: FORM 1 ARCHITECT Q1 2526.pdf18 Aug 2025
Form 2File: Form 2 Kingsman Q1.pdf18 Aug 2025
Form 3File: Form 3 Q1 kingsman Udin.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked and Unsold Inventories.pdf18 Aug 2025
Form 1File: Form 1 Kingsman Q4.pdf8 Aug 2025
Form 2File: Form 2 kingsman Q4.pdf8 Aug 2025
Form 3File: form 3 kingsman udin.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold booked and unsold inventory kingsman.pdf8 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECTS CERTIFICATE Q-3 -2024.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: kingsman form3 reracompressed.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: kingsman form3 reracompressed.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Engineer Certificate Kingsman Residency.pdf6 Mar 2025
Other - LegalFile: ENCUMBRANCE CERTIFICATE.pdf5 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: HDFC Seperate Bank Account RERA.pdf5 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: HDFC Seperate Bank Account RERA.pdf5 Feb 2025
Other - LegalFile: ENCUMBRANCE CERTIFICATE.pdf5 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: HDFC Seperate Bank Account RERA.pdf5 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: HDFC Seperate Bank Account RERA.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SKM_28724112516071 Promoter Acceptance.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SKM_28724112516071 Promoter Acceptance.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf18 Nov 2024
Other - TechnicalFile: Binod Tripathi.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf18 Nov 2024
Other - TechnicalFile: Binod Tripathi.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration of KDMC Reservation and Refugee and Reconciliation with Form 3 and Building De6 Nov 2024
Other - TechnicalFile: Declaration of KDMC Reservation and Refugee and Reconciliation with Form 3 and Building De6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration of KDMC Reservation and Refugee and Reconciliation with Form 3 and Building De6 Nov 2024
Other - TechnicalFile: Declaration of KDMC Reservation and Refugee and Reconciliation with Form 3 and Building De6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Clarification Redevelopment Form 3.pdf4 Nov 2024
Other - FinanceFile: Clarification Redevelopment.pdf4 Nov 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AND SHEET.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Clarification Redevelopment Form 3.pdf4 Nov 2024
Other - FinanceFile: Clarification Redevelopment.pdf4 Nov 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AND SHEET.pdf4 Nov 2024
Proforma of Agreement for saleFile: star draft kingsmen godavari agreement for sale 18-10-2024 in rera site.pdf22 Oct 2024
Proforma of Agreement for saleFile: star draft kingsmen godavari agreement for sale 18-10-2024 in rera site.pdf22 Oct 2024
Proforma of Allotment letterFile: Model form of allotment letter.pdf21 Oct 2024
Deviation Report with respect to Allotment letterFile: declaration of deviation AL.pdf21 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Final DISCLOSURE OF INTEREST.pdf21 Oct 2024
Proforma of Allotment letterFile: Model form of allotment letter.pdf21 Oct 2024
Deviation Report with respect to Allotment letterFile: declaration of deviation AL.pdf21 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Final DISCLOSURE OF INTEREST.pdf21 Oct 2024
Other - LegalFile: HIGHLIGHTED FSI AS PER SANCTIONED PLAN.pdf10 Aug 2024
Other - LegalFile: HIGHLIGHTED FSI AS PER SANCTIONED PLAN.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with udin_merged_compressed.pdf9 Aug 2024
Other - LegalFile: SWAPNAGANDHA (developement agreement)_compressed-36-70.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-1-30.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-31-60.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-61-90.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-91-120.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-121-150.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-151-170.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-171-190.pdf9 Aug 2024
Other - LegalFile: SWAPNAGANDHA (developement agreement)_compressed-1-35.pdf9 Aug 2024
Other - LegalFile: SWAPNAGANDHA (developement agreement)_compressed-71-105.pdf9 Aug 2024
Other - LegalFile: SWAPNAGANDHA (developement agreement)_compressed-106-140.pdf9 Aug 2024
Other - LegalFile: SWAPNAGANDHA (developement agreement)_compressed-141-172.pdf9 Aug 2024
Other - LegalFile: DECLARATION OF REFUGEE FLATS SIGNED.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with udin_merged_compressed.pdf9 Aug 2024
Other - LegalFile: SWAPNAGANDHA (developement agreement)_compressed-36-70.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-1-30.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-31-60.pdf9 Aug 2024
Other - LegalFile: godavari DEVELOPMENT AGREEMENT_compressed-61-90.pdf9 Aug 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHIVNERI PARK CO OP HSG SOC LTDP51700051991KALYAN, Thane32Jul 2023OngoingMar 2027Not due yet

How this compares with Thane

8%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 4 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KINGSMAN RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan West7,600+ in Thane

2 kmKINGSMAN RESIDENCYCompleted 68Lapsed / revoked 37Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 205 registered projects within 2 km.

Builder: SHREE SWASTIK CONSTRUCTIONS

SHREE SWASTIK CONSTRUCTIONS has 2 registrations on MahaRERA, including SHIVNERI PARK CO OP HSG SOC LTD and KINGSMAN RESIDENCY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if KINGSMAN RESIDENCY is delayed beyond 30 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KINGSMAN RESIDENCY?

The registered promoter entity is SHREE SWASTIK CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KINGSMAN RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KINGSMAN RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KINGSMAN RESIDENCY?

The professionals named in the filing: Architect: BINOD TRIPATHI; Engineer: Infinity Consultants; Engineer: Bipin Dinesh Gaikar; Chartered Accountant: CA KARAN DUDANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KINGSMAN RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KINGSMAN RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KINGSMAN RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.