Home / Browse projects / KINGS TOWER

Registered No litigation declared Mixed project

KINGS TOWER

By MOHAMMED ESHAQ ALI VADGAMA

RG-MH-43701 · RERA P51900034425 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2026Possession promised1 month past this date
10 of 22Construction stages doneacross 3 buildings; furthest along: Staircases, 95%
21 of 82Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

KINGS TOWER is a Mixed project by MOHAMMED ESHAQ ALI VADGAMA in MUMBAI CENTRAL, 400008, registered with MahaRERA as P51900034425 on 5 Apr 2022. Possession was promised by 29 Sep 2026 and is now 1 months past that date. The completion date has moved by 12 months from the original filing. 61 of the 82 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameKINGS TOWER
  • TypeMixed
  • Location
    • MORLAND ROAD
    • MUMBAI CENTRAL
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900034425
  • ReraGenie IDRG-MH-43701

Builder

  • NameMOHAMMED ESHAQ ALI VADGAMA
  • Entity typeIndividual

Key dates

1 months past promisethis monthRegisteredApr 2022First promiseSep 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2022
  • Promised completion29 Sep 2026
  • Revised completionRevised to 29 Sep 2026 (originally 30 Sep 2025)
  • Buildings2 building records
  • Documents filed65 files

Current status

74%61 of 82 units booked
94.3%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KINGS TOWERNA1919511061
KINGS TOWERNA191919019

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 95%.

KINGS TOWER80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
KINGS TOWER80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered90

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,782 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Oct 2025

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI6881.97
Proposed, not sanctioned6,882 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHRIN MANZIL GROUND FLOOR SHOP NO 3 TO 6 18/24 ST MARY ROAD MAZGAON MUMBAI 400010
Estimated costRs 44.25 cr
Cost incurredRs 41.74 cr
Work done94.33%
BuildingWingEstimatedIncurred
KINGS TOWERNARs 33.25 crRs 32.32 cr
KINGS TOWERNARs 10.45 crRs 9.42 cr
-NARs 55.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAJJAR & ASSOCIATES
ArchitectGajjar and Associates Consultants Private Limited
EngineerSUPCONS CONSULTANTS
Chartered AccountantJ N MEHTA & ASSOCIATES
Chartered AccountantM H JAIN & CO.
Chartered AccountantSanket R Shah and Associates
PartnerRole in project
MOHAMMED ESHAQ ALI VADGAMA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07102518054Sep 2025 → Sep 2026

Reason as filed by the promoterDue to delayed in approval of permission and NOC, but the project is almost completion stage, therefore apply for extension. Request you to accept the extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Mar 26 - King Circle.pdf3 Jun 2026
Withdrawal Update Form 2File: Form 2 Mar 26 - King Circle.pdf3 Jun 2026
Withdrawal Update Form 3File: Scan Form III Mar 26-Kings Tower.pdf3 Jun 2026
Withdrawal Update Form 1File: Form 1 Dec 25 - King Circle.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec 25 - King Circle.pdf1 Jun 2026
Withdrawal Update Form 3File: RERA form lll dec25.pdf1 Jun 2026
Withdrawal Update Form 1File: Form - 1_Sep 25 - King Tower.pdf30 Apr 2026
Withdrawal Update Form 2File: Form - 2_Sep 25 - King Tower.pdf30 Apr 2026
Withdrawal Update Form 3File: Form III (Sep 25) - King Tower_compressed.pdf30 Apr 2026
Form 1File: SUTTARWALA RERA 2023.pdf29 Aug 2025
Form 2File: 1 Form 2 Mar 23.pdf29 Aug 2025
Form 3File: 1 Form 3 Mar 23.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 1 Mar 23.pdf29 Aug 2025
Self-declaration of Quarterly ProgressFile: QPR Mar 23.pdf29 Aug 2025
Form 1File: SUTTARWALA RERA 2024.pdf29 Aug 2025
Form 2File: 2 Form 2 Mar 24.pdf29 Aug 2025
Form 3File: 2 Form 3 Mar 24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 2 Mar 24.pdf29 Aug 2025
Self-declaration of Quarterly ProgressFile: QPR Mar 24.pdf29 Aug 2025
Form 1File: SUTTARWALA RERA 2025.pdf29 Aug 2025
Form 2File: 3 Form 2 Jun 24.pdf29 Aug 2025
Form 3File: 3 Form 3 Jun 24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 3 Jun 24.pdf29 Aug 2025
Self-declaration of Quarterly ProgressFile: QPR Jun 24.pdf29 Aug 2025
Form 1File: SUTTARWALA RERA 2025.pdf29 Aug 2025
Form 2File: 4 Form 2 Sep 24.pdf29 Aug 2025
Form 3File: 4 Form 3 Sep 24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Sep 24.pdf29 Aug 2025
Self-declaration of Quarterly ProgressFile: QPR Sep 24.pdf29 Aug 2025
Form 1File: SUTTARWALA RERA 2025.pdf29 Aug 2025
Form 2File: 5 Form 2 Dec 24.pdf29 Aug 2025
Form 3File: 5 Form 3 Dec 24.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 5 Dec 24.pdf29 Aug 2025
Self-declaration of Quarterly ProgressFile: QPR Dec 24.pdf29 Aug 2025
Form 1File: SUTTARWALA RERA 2025.pdf29 Aug 2025
Form 2File: 6 Form 2 Mar 25.pdf29 Aug 2025
Form 3File: 6 Form 3 Mar 25.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 6 Mar 25.pdf29 Aug 2025
Form 1File: SUTTARWALA RERA Jun 25.pdf29 Aug 2025
Form 2File: 7 Form 2 Jun 25.pdf29 Aug 2025
Form 3File: 7 Form 3 Jun 25.pdf29 Aug 2025
Disclosure of Sold and Booked InventoryFile: 7 Jun 25.pdf29 Aug 2025
Self-declaration of Quarterly ProgressFile: QPR Jun 25.pdf29 Aug 2025
Building plan approval or NA orderFile: 2293980_IOD_signed (1).pdf31 Mar 2022
Layout approvalFile: MYSCAN_20220328_0007.pdf31 Mar 2022
Layout approvalFile: MYSCAN_20220330_0006_compressed.pdf31 Mar 2022
Layout approvalFile: MYSCAN_20220330_0005_compressed.pdf31 Mar 2022
Layout approvalFile: MYSCAN_20220330_0004_compressed.pdf31 Mar 2022
Layout approvalFile: MYSCAN_20220330_0008_compressed.pdf31 Mar 2022
Copy of Layout Approval (in case of layout)File: MYSCAN_20220328_0007.pdf31 Mar 2022
Copy of Layout Approval (in case of layout)File: MYSCAN_20220330_0006_compressed.pdf31 Mar 2022
Copy of Layout Approval (in case of layout)File: MYSCAN_20220330_0005_compressed.pdf31 Mar 2022
Copy of Layout Approval (in case of layout)File: MYSCAN_20220330_0004_compressed.pdf31 Mar 2022
Copy of Layout Approval (in case of layout)File: MYSCAN_20220330_0008_compressed.pdf31 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 2293980_IOD_signed (1).pdf31 Mar 2022
PAN CardFile: Pan card Mohd Eshaq.pdf9 Mar 2022
Copy of the legal title reportFile: Rera Final Title Report Format - A_compressed.pdf9 Mar 2022
Details of encumbrancesFile: MYSCAN_20220328_0007.pdf9 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CC ZERO FSI.pdf9 Mar 2022
Declaration about Commencement CertificateFile: Rera Declaration For CC.pdf9 Mar 2022
Declaration in FORM BFile: Rera Affidavit Cum Declaration.pdf9 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200233167521_For_Asset_Based_Search_23_03_2022_13_26_29_999.pdf9 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sign copy_compressed.pdf9 Mar 2022
Proforma of Allotment letterFile: Agreement for Sale.pdf9 Mar 2022
Proforma of Allotment letterFile: Rera Allotment Letter_compressed.pdf9 Mar 2022

Keep KINGS TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI CENTRAL

2 kmKINGS TOWERCompleted 12Lapsed / revoked 19Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: MOHAMMED ESHAQ ALI VADGAMA

MOHAMMED ESHAQ ALI VADGAMA has 1 registration on MahaRERA, including KINGS TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if KINGS TOWER is delayed beyond 29 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KINGS TOWER?

The registered promoter entity is MOHAMMED ESHAQ ALI VADGAMA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KINGS TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KINGS TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KINGS TOWER?

The professionals named in the filing: Architect: GAJJAR & ASSOCIATES; Architect: Gajjar and Associates Consultants Private Limited; Engineer: SUPCONS CONSULTANTS; Chartered Accountant: J N MEHTA & ASSOCIATES; Chartered Accountant: M H JAIN & CO.; Chartered Accountant: Sanket R Shah and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KINGS TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KINGS TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KINGS TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.