ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / KINGS COUNTY PHASE - I

Registered No litigation declared Residential / Group Housing project

KINGS COUNTY PHASE - I

By KING'S MARQUE GROUP

RG-MH-97110 · RERA P52100055635 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 85%
87 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

KINGS COUNTY PHASE - I is a Residential / Group Housing project by KING'S MARQUE GROUP in Pune, Maharashtra, registered with MahaRERA as P52100055635 on 5 Apr 2024. Possession is promised by 31 Dec 2027. 65 of the 152 units on this registration are recorded sold or booked, and 2 of 44 construction stages are filed complete.

At a glance

Project

  • NameKINGS COUNTY PHASE - I
  • TypeResidential / Group Housing
  • Location
    • NEAR GANESH MANDIR
    • WAKADKARWASTI
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055635
  • ReraGenie IDRG-MH-97110

Builder

  • NameKING'S MARQUE GROUP
  • Entity typePartnership
  • PartnersMrs RANI CHANDRAKANT WAKADKAR, Mr NANDKUMAR SHANKAR WAKADKAR, Mr SHAKAR TUKARAM WAKADKAR, Mr SUSHIL SHANKAR WAKADKAR, Mr VISHAL SHANKAR WAKADKAR, Mr CHANDRAKANT PANDURANG WAKADKAR, Mr PANDURANG TUKARAM WAKADKAR, Mrs SHOBHA PANDURANG WAKADKAR, Mrs VIJAYA SHANKAR WAKADKAR

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed146 files

Current status

43%65 of 152 units booked
33.9%Work done, per cost certificate

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING BNA181876076
BUILDING CNA171776076
BUILDING ANA00000
BUILDING DNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 85%.

BUILDING B38%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)85%
Plinth85%
Stilt Floor0%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C37%
ActivityProgress
Excavation100%
Basement (if any)85%
Podiums (if any)85%
Plinth85%
Stilt Floor0%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56
BuildingClosed/CoveredTotal
BUILDING B11
BUILDING C5555

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,715 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Dec 2025

Approvals and building plan

Sanctioning authorityPimpri-Chinchwad Municipal Corporation
Permissible FSI26585.04
Proposed, not sanctioned7,085 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 118 119 AND 120, THE ADDRESS COMMERCIAL NEAR SAYAJI HOTEL WAKAD 4110057
Estimated costRs 92.98 cr
Cost incurredRs 31.54 cr
Work done33.92%
BuildingWingEstimatedIncurred
BUILDING CNARs 48.55 crRs 14.37 cr
BUILDING BNARs 38.88 crRs 17.13 cr
-NARs 5.56 crRs 3.75 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Pramod Chavan
EngineerSatish Marathe.
EngineerSHRIKANT MADANRAO AMBHURE
Chartered AccountantVINIT D ACHHA AND ASSOCIATES
Chartered AccountantSHUBHAM BORA
PartnerRole in project
KING'S MARQUE GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 25-26.pdf2 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf10 May 2026
Withdrawal Update Form 2File: Rera From 2.pdf10 May 2026
Withdrawal Update Form 3File: Rera Form3_.pdf10 May 2026
Withdrawal Update Form 1File: Form 1 Architect .pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3_compressed.pdf5 Feb 2026
Layout approvalFile: Layout.pdf30 Dec 2025
Building plan approvalFile: Plan 01.pdf30 Dec 2025
Building plan approvalFile: Plan 02.pdf30 Dec 2025
Building plan approvalFile: Plan 03.pdf30 Dec 2025
Building plan approvalFile: Plan 04.pdf30 Dec 2025
Building plan approvalFile: Plan 05.pdf30 Dec 2025
Building plan approvalFile: Plan 06.pdf30 Dec 2025
Building plan approvalFile: Plan 07.pdf30 Dec 2025
Building plan approvalFile: Plan 08.pdf30 Dec 2025
Building plan approvalFile: Plan 09.pdf30 Dec 2025
Building plan approvalFile: Plan 10.pdf30 Dec 2025
Building plan approvalFile: Plan 11.pdf30 Dec 2025
Building plan approvalFile: Plan 12.pdf30 Dec 2025
Building plan approvalFile: Plan 13.pdf30 Dec 2025
Building plan approvalFile: Plan 14.pdf30 Dec 2025
Building plan approvalFile: Plan 15.pdf30 Dec 2025
Building plan approvalFile: Plan 16.pdf30 Dec 2025
Building plan approvalFile: Plan 17.pdf30 Dec 2025
Building plan approvalFile: Plan 18.pdf30 Dec 2025
Building plan approvalFile: Plan 19.pdf30 Dec 2025
Building plan approvalFile: Plan 20.pdf30 Dec 2025
Building plan approvalFile: Plan 21.pdf30 Dec 2025
Form 1File: Form 1 Architect Certificate .pdf13 Oct 2025
Form 2File: FORM 2 ENGINEERING .pdf13 Oct 2025
Form 3File: FORM 3 1.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf13 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 new.pdf25 Sep 2025
Form 1File: Form 1 Architect Certificate WAKAD King’s Marque Group 04.pdf21 Jul 2025
Form 2File: Form 2.pdf21 Jul 2025
Form 3File: Form 3_compressed.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold .pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf14 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3c.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jan 2025
Details of encumbrances concerned to FinanceFile: Kings -1.pdf6 Nov 2024
CERSAI detailsFile: Kings -2.pdf6 Nov 2024
Details of encumbrances concerned to LegalFile: Kings -1.pdf6 Nov 2024
Layout approvalFile: 1 Layout_compressed.pdf24 Oct 2024
Building plan approvalFile: 2_compressed.pdf24 Oct 2024
Building plan approvalFile: 3_compressed.pdf24 Oct 2024
Building plan approvalFile: 4_compressed.pdf24 Oct 2024
Building plan approvalFile: 5_compressed.pdf24 Oct 2024
Building plan approvalFile: 6.pdf24 Oct 2024
Building plan approvalFile: 8_compressed.pdf24 Oct 2024
Building plan approvalFile: 9_compressed.pdf24 Oct 2024
Building plan approvalFile: 10_compressed.pdf24 Oct 2024
Building plan approvalFile: 11_compressed.pdf24 Oct 2024
Building plan approvalFile: 12_compressed.pdf24 Oct 2024
Building plan approvalFile: 13_compressed.pdf24 Oct 2024
Building plan approvalFile: 14_compressed.pdf24 Oct 2024
Building plan approvalFile: 15_compressed.pdf24 Oct 2024
Building plan approvalFile: 16_compressed.pdf24 Oct 2024
Building plan approvalFile: 17_compressed.pdf24 Oct 2024
Building plan approvalFile: 18_compressed.pdf24 Oct 2024
Building plan approvalFile: 19_compressed.pdf24 Oct 2024
Building plan approvalFile: 20_compressed.pdf24 Oct 2024
Building plan approvalFile: 21_compressed.pdf24 Oct 2024
Building plan approvalFile: 22_compressed.pdf24 Oct 2024
Copy of Layout Approval (in case of layout)File: 1 Layout_compressed.pdf24 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 14_compressed.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_compressed.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 15_compressed.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 16_compressed.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 17_compressed.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 18_compressed.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 19_compressed.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 20_compressed.pdf24 Oct 2024

How this compares with Pune

43%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KINGS COUNTY PHASE - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKADKARWASTI13,700+ in Pune

2 kmKINGS COUNTY PHASE - ICompleted 103Lapsed / revoked 40Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 206 registered projects within 2 km.

Builder: KING'S MARQUE GROUP

KING'S MARQUE GROUP has 1 registration on MahaRERA, including KINGS COUNTY PHASE - I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KINGS COUNTY PHASE - I is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KINGS COUNTY PHASE - I?

The registered promoter entity is KING'S MARQUE GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KINGS COUNTY PHASE - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KINGS COUNTY PHASE - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KINGS COUNTY PHASE - I?

The professionals named in the filing: Architect: Ar. Pramod Chavan; Engineer: Satish Marathe.; Engineer: SHRIKANT MADANRAO AMBHURE; Chartered Accountant: VINIT D ACHHA AND ASSOCIATES; Chartered Accountant: SHUBHAM BORA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KINGS COUNTY PHASE - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KINGS COUNTY PHASE - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KINGS COUNTY PHASE - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.