KIMAYA PRIME

By SAMIR AMRUT GANDHI

RG-MH-73089 · RERA P52600047892 · Last updated on MahaRERA portal: 18 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

KIMAYA PRIME is a Others project by SAMIR AMRUT GANDHI in Solapur, Maharashtra, registered with MahaRERA as P52600047892 on 1 Dec 2022. Possession was promised by 31 Mar 2025 and is now 19 months past that date.

At a glance

Project

  • NameKIMAYA PRIME
  • TypeOthers
  • Location
    • VIP ROAD
    • RAILWAY LINES
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413001
  • Pincode413001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600047892
  • ReraGenie IDRG-MH-73089

Builder

  • NameSAMIR AMRUT GANDHI
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

19 months past promisethis monthRegisteredDec 2022PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Dec 2022
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KIMAYA PRIMENA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

KIMAYA PRIME: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 18 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes80%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered1
Open Space3

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area827 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SAMIR A GANDHISolapur (M Corp.)Solapur

Approvals and building plan

Sanctioning authoritySolapur Municipal Corporation
Permissible FSI3509.76
Proposed, not sanctioned2,073 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHOTGI OAD SOLAPUR 413003

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHESH PATIL
ArchitectPrathamesh Gandhi
EngineerPUSHKAR BALDAWA
EngineerChandrakant Chavdekar
Chartered AccountantDILIP SAPATNEKAR
Chartered AccountantDhiraj Baldota
PartnerRole in project
SAMIR AMRUT GANDHI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jul 2024

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: KP FORM B.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: KP FORM 2A 2023.pdf18 Apr 2025
Details of encumbrances concerned to FinanceFile: LEGAL ENC.pdf17 Apr 2025
CERSAI detailsFile: CERSAI.pdf17 Apr 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK FORMAT A.pdf17 Apr 2025
Deviation Report with respect to Allotment letterFile: DEVI ALLOT.pdf17 Apr 2025
Details of encumbrances concerned to LegalFile: LEGAL ENC.pdf17 Apr 2025
Other - TechnicalFile: DEC CUM UNDER ANNEXURE A.pdf17 Apr 2025
Deviation Report with respect to model copy of AgreementFile: DEV AGMT.pdf17 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISC IN OTHER REAL ESTATE.pdf17 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: FIN ENC.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KP ARCH CERT JAN 2025.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KP ENGG CERT JAN 2025.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: KP UNSOLD CHART JAN 2025.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: KP FORM 2A 2023.pdf28 Nov 2024
Building plan approvalFile: Kimaya Prime R2 Plan.pdf6 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Kimaya Prime R2 Plan.pdf6 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Kimaya Prime R2 Permission.pdf6 Aug 2024
OtherFile: KP SUPP DOD AUG 2024.pdf6 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KP COMM SMC OC JULY 2024.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: KP UNSOLD CHART FEB 2024.pdf16 Feb 2024
Building plan approvalFile: KP SMC PLAN DEC 2023.pdf21 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: KP SMC PLAN DEC 2023.pdf21 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: KP BP DEC 2023.pdf21 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SAG KP FORM 5 22-23.pdf6 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: KP FORM 2A 2023.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: KP FORM 2A 2023.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: KP FORM 5 2022.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: KP FORM 2A 2023.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: KP FORM 5 2022.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KP FORM 5 2022.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KP FORM 5 2022.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: KP FORM 5 2022.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KP FORM 5 2022.pdf18 Apr 2023
Details of encumbrances concerned to FinanceFile: DETAILS OF ENCUMBRANCES CONCERNED TO LEGAL NOV 2022.pdf18 Nov 2022
Details of encumbrances concerned to LegalFile: DETAILS OF ENCUMBRANCES CONCERNED TO LEGAL NOV 2022.pdf18 Nov 2022
Details of encumbrances concerned to LegalFile: KP PHANSALKAR COURT ORDER OCT-22.pdf16 Nov 2022
Proforma of Agreement for saleFile: KP AFS PART I.pdf16 Nov 2022
Proforma of Agreement for saleFile: KP AFS PART II.pdf16 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DEC OF LEGAL ENTITY.pdf6 Oct 2022
Status of ConveyanceFile: STATUS OF CONVEYANCE.pdf6 Oct 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OCT 2022.pdf6 Oct 2022
OtherFile: KP ALLOTMRNT LETTER.pdf6 Oct 2022
OtherFile: KP AFS PART I.pdf6 Oct 2022
OtherFile: KP AFS PART II.pdf6 Oct 2022
Details of encumbrances concerned to LegalFile: KP DETAILS OF ENCUMON TO LEGAL.pdf29 Aug 2022
Proforma of Allotment letterFile: KP RERA MODEL ALLOTMENT LETTER JULY 2022.pdf29 Aug 2022
Deviation Report with respect to Allotment letterFile: KP DEVIATION REPORT.pdf29 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAG-KP- CA Certificate.pdf25 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: KP ENCUMB DETAILS.pdf25 Aug 2022
Declaration in FORM BFile: KP FORM B DEC.pdf1 Aug 2022
Details of encumbrances concerned to FinanceFile: DEC ENCU TO FINANCE.pdf23 Jul 2022
Declaration about Commencement CertificateFile: KP DEC COMM CERT.pdf23 Jul 2022
Copy of the legal title reportFile: KIMAYA PRIME LEGAL TITLE REPORT JULY 2022.pdf16 Jul 2022
CERSAI detailsFile: KIMAYA PRIME CERSAI_Search_Report.pdf16 Jul 2022
Layout approvalFile: SMC PLANS MARCH 2022.pdf8 Jun 2022
Copy of Layout Approval (in case of layout)File: SMC PLANS MARCH 2022.pdf8 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT JUNE 22.pdf8 Jun 2022
Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY JUN 22.pdf4 Jun 2022
OtherFile: KIRLOSKAR - SAG NEW CTS PROPERTY CARD.pdf4 Jun 2022
Building plan approvalFile: SMC PLANS MARCH 2022.pdf3 Jun 2022
PAN CardFile: SAG PAN.pdf3 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: SMC PLANS MARCH 2022.pdf3 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: SMC BP MARCH 2022.pdf3 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT.pdf3 Jun 2022

How this compares with Solapur

15%of Solapur projects moved their completion datethis one has not
39%of Solapur registrations have lapsed or been cancelledthis one is among them

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep KIMAYA PRIME on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAILWAY LINES550+ in Solapur

2 kmKIMAYA PRIMECompleted 18Lapsed / revoked 12Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: SAMIR AMRUT GANDHI

SAMIR AMRUT GANDHI has 2 registrations on MahaRERA, including KIMAYA MAYURSHRI and KIMAYA PRIME. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What does it mean that KIMAYA PRIME shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KIMAYA PRIME is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KIMAYA PRIME?

The registered promoter entity is SAMIR AMRUT GANDHI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KIMAYA PRIME?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KIMAYA PRIME?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KIMAYA PRIME?

The professionals named in the filing: Architect: MAHESH PATIL; Architect: Prathamesh Gandhi; Engineer: PUSHKAR BALDAWA; Engineer: Chandrakant Chavdekar; Chartered Accountant: DILIP SAPATNEKAR; Chartered Accountant: Dhiraj Baldota. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KIMAYA PRIME?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KIMAYA PRIME. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KIMAYA PRIME to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.