Home / Browse projects / Pune, Maharashtra / Keystone Altura
Keystone Altura
By Keystone Lifespaces Private Limited
RG-MH-09210 · RERA P52100001524 · Last updated on MahaRERA portal: 15 Feb 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Keystone Altura is a Others project by Keystone Lifespaces Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100001524 on 28 Jul 2017. The registration is recorded completed; possession was promised by 29 Dec 2024. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameKeystone Altura
- TypeOthers
- Location
- Bhumkar Chowk Road
- Wakad
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100001524
- ReraGenie IDRG-MH-09210
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Jul 2017
- Promised completion29 Dec 2024
- Revised completionRevised to 29 Dec 2024 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed150 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Keystone Altura | NA | 23 | 0 | 0 | 0 | 0 |
| KEYSTONE EMINENCE | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
Keystone Altura100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
KEYSTONE EMINENCE100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities17
As on 15 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
| Only Drive Way | Yes | 100% |
| Campus Lighting | Yes | 100% |
Parking filed275
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Keystone Altura | 179 | 20 | 199 |
| KEYSTONE EMINENCE | 66 | 10 | 76 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SOLESPACE |
| Engineer | J W CONSULTANTS LLP |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Partner | Role in project |
|---|---|
| Keystone Lifespaces Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Dec 2024
Documents filed150
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 150 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Socierty Certificate.pdf | 15 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: ilovepdf_merged (36).pdf | 27 Dec 2024 |
| Building plan approvalFile: B WING 555_merged_11zon.pdf | 21 Dec 2024 |
| Building plan approvalFile: A Wing 12346_merged (1)_11zon.pdf | 21 Dec 2024 |
| Building plan approvalFile: A, B, B(M) Plan_11zon (1).pdf | 21 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Declaration_merged (2).pdf | 21 Dec 2024 |
| Building Plan Approval (IOD)File: B WING 555_merged_11zon.pdf | 21 Dec 2024 |
| Building Plan Approval (IOD)File: A Wing 12346_merged (1)_11zon.pdf | 21 Dec 2024 |
| Building Plan Approval (IOD)File: A, B, B(M) Plan_11zon (1).pdf | 21 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Declaration_merged.pdf | 20 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 0_OC 1_merged.pdf | 20 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Keystone Altura for FY 2023-24.pdf | 15 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Keystone Altura as on Sep 2024.pdf | 13 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 1.pdf | 13 Nov 2024 |
| Layout approvalFile: g_11zon.pdf | 8 Nov 2024 |
| Layout approvalFile: Elevation (2)_11zon.pdf | 8 Nov 2024 |
| Building plan approvalFile: A, B, B(M) Plan_11zon.pdf | 8 Nov 2024 |
| Building plan approvalFile: Layout_11zon.pdf | 8 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: g_11zon.pdf | 8 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: Elevation (2)_11zon.pdf | 8 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 8 Nov 2024 |
| Building Plan Approval (IOD)File: A, B, B(M) Plan_11zon.pdf | 8 Nov 2024 |
| Building Plan Approval (IOD)File: Layout_11zon.pdf | 8 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Keystone Altura as on March 2024.pdf | 27 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Keystone Altura as on June 2024.pdf | 27 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 of Keystone Altura as on 30th June 2024.pdf | 20 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Keystone Altura as on June 2024.pdf | 18 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: declaration Keystone.pdf | 29 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Keystone Altura as on March 2024.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Form 3 Keystone Altura as on 31st March 2024.pdf | 27 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Keystone Altura as on Dec 2023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Keystone Altura as on 31st December 2023.pdf | 20 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Keystone Altura.pdf | 6 Jan 2024 |
| Layout approvalFile: 1 to 4 pages_rotated.pdf | 11 Dec 2023 |
| Layout approvalFile: 5 to 8 pages_rotated.pdf | 11 Dec 2023 |
| Layout approvalFile: 9 to 12 pages_rotated.pdf | 11 Dec 2023 |
| Layout approvalFile: 13 to 16 pages_rotated.pdf | 11 Dec 2023 |
| Layout approvalFile: 17 to 19 pages_rotated.pdf | 11 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 1 to 4 pages_rotated.pdf | 11 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 5 to 8 pages_rotated.pdf | 11 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 9 to 12 pages_rotated.pdf | 11 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 13 to 16 pages_rotated.pdf | 11 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: 17 to 19 pages_rotated.pdf | 11 Dec 2023 |
| Declaration in FORM BFile: Affidavit.pdf | 28 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate.pdf | 28 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 28 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 28 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate_11zon.pdf | 28 Nov 2023 |
| Certificates of CA (Form 5)File: Form 5 2017 to 2018.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018 to 2019.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019 to 2020.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020 to 2021.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021 to 2022.pdf | 28 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022 to 2023_11zon.pdf | 28 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Keystone - Form 1 (2) (1).pdf | 31 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Keystone Altura as on September 2023.pdf | 31 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 Keystone Altura as on 30-09-2023.pdf | 31 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: New Format Form 5 Keystone Altura FY 2022-23.pdf | 30 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Keystone Altura as on June 2023.pdf | 31 Aug 2023 |
| Certificates of CA (Form 3)File: Form 3- Keystone Altura as on 30-06-2023.pdf | 19 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Keystone - Form 1 -163.pdf | 9 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Keystone Form-1 (4).pdf | 24 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Keystone Altura as on March 2023.pdf | 16 May 2023 |
| Certificates of CA (Form 3)File: Form 3- Keystone Altura as on March 2023.pdf | 16 May 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29- Keystone Altura_compressed.pdf | 10 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Keystone Altura as on December 2022.pdf | 4 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 Keystone Altura Dec 2022.pdf | 4 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Keystone Altura.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A- Keystone Altura.pdf | 14 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Certified Form 5 Keystone Altura 2018-19.pdf | 8 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 461.pdf | 8 Dec 2022 |
| Declaration about Commencement CertificateFile: Keystone Altura Format D.pdf | 22 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Keystone Altura- Form 2A - (19-20).pdf | 22 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Keystone Altura- Form 2A - (19-20).pdf | 22 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Keystone Altura- Form 2A - (20-21).pdf | 22 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Keystone Altura- CIRCULAR 29_compressed.pdf | 22 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Keystone Altura September 2022.pdf | 18 Nov 2022 |
| Certificates of CA (Form 3)File: Form 3 Keystone Altura Sept 2022_compressed.pdf | 18 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Certificate 228.pdf | 18 Nov 2022 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KEYSTONE ARISTA | PLOT NO 149 SECTOR 10 TALOJA NAVI MUMBAI | 31 | Completed | Dec 2016 | Jun 2016 |
| KEYSTONE VISTA | PLOT NO 26 SECTOR NO 34C KHARGHAR NAVI MUMBAI | 28 | Completed | Dec 2014 | Late, Jul 2015 |
| KEYSTONE ELITA | PLOT NO 49 SECTOR NO 15 KHARGHAR NAVI MUMBAI | 84 | Completed | Dec 2014 | Late, Jun 2015 |
| KEYSTONE BALLISTA | PLOT NO 49 SECTOR NO 27 OWE KHARGHAR | 35 | Completed | Dec 2013 | Dec 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 150 filed documents as one ZIP, foldered, with a manifest
Keep Keystone Altura on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wakad13,700+ in Pune
Filed coordinates, straight-line distance. 219 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Keystone Lifespaces Private Limited
Keystone Lifespaces Private Limited has 2 registrations on MahaRERA, including KEYSTONE SOLISTA and Keystone Altura. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Keystone Altura is delayed beyond 29 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Keystone Altura?
The registered promoter entity is Keystone Lifespaces Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Keystone Altura?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Keystone Altura?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Keystone Altura?
The professionals named in the filing: Architect: SOLESPACE; Engineer: J W CONSULTANTS LLP; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Keystone Altura?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback