  • Completion date moved by 89 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 89 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Ketan Heights Wing / Building No A is a Residential / Group Housing project by ketandevelopers in Pune, Maharashtra, registered with MahaRERA as P52100005520 on 11 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 89 months from the original filing.

At a glance

Project

  • NameKetan Heights Wing / Building No A
  • TypeResidential / Group Housing
  • Location
    • Pune Bangalore Highway
    • S.NO 112/1/1. Near Hill view residency
    • Opposite RMD College
    • Warje
    • Haveli
    • Pune
    • 411058
  • Pincode411058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100005520
  • ReraGenie IDRG-MH-62269

Builder

  • Nameketandevelopers
  • Entity typePartnership
  • PartnersShivaji Maruti Ghosale, Avinash Shivaji Ghosale

Key dates

this monthRegisteredAug 2017First promiseJul 2019Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Jul 2019)
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ketan Heights Wing / Building No ANA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

Ketan Heights Wing / Building No A: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities16

As on 12 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes80%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
GardenYes0%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,340 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4046.21
Proposed, not sanctioned2,054 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai Banglowar Higway , Near Sobha Puram , Warje 411058

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
ketandevelopers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100002265Jul 2019 → Jul 2020

Reason as filed by the promoterAmendment in approval of TDR by center government

EXT52100009522Jul 2019 → Dec 2026

Reason as filed by the promoterWe sincerely apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to several factors, including issues with procurement, unforeseen site conditions, coordination challenges, delays in obtaining the Occupancy Certificate (OC), and temporary financial constraints. Additionally, we have encountered a change in the Floor Space Index (FSI), which has impacted the overall project timeline. Despite these setbacks, we are working diligently to address all issues and complete the remaining work as soon as possible. As of now, 85% of the

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Apr 2021

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11zon_merged-PDF (70) (1).pdf12 May 2025
Certificates of CA (Form 3)File: 11zon_merged-PDF (70) (1).pdf12 May 2025
Certificates of CA (Form 3)File: 11zon_merged-PDF (72).pdf12 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11zon_merged-PDF (73).pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Adobe Scan May 12, 2025.pdf12 May 2025
Other - TechnicalFile: P52100005520_FileName_3.pdf12 May 2025
Declaration in FORM BFile: Form B- Ketan Heights.pdf4 Mar 2025
Certificates of CA (Form 3)File: Form 3 Sept 2024_11zon.pdf24 Dec 2024
Building plan approvalFile: 1-6_11zon.pdf23 Dec 2024
Building plan approvalFile: 2-6_11zon.pdf23 Dec 2024
Building plan approvalFile: 3-6_11zon.pdf23 Dec 2024
Building plan approvalFile: 4-6_11zon.pdf23 Dec 2024
Building plan approvalFile: 5-6_11zon.pdf23 Dec 2024
Building plan approvalFile: 6-6_11zon.pdf23 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf23 Dec 2024
Building Plan Approval (IOD)File: 1-6_11zon.pdf23 Dec 2024
Building Plan Approval (IOD)File: 2-6_11zon.pdf23 Dec 2024
Building Plan Approval (IOD)File: 3-6_11zon.pdf23 Dec 2024
Building Plan Approval (IOD)File: 4-6_11zon.pdf23 Dec 2024
Building Plan Approval (IOD)File: 5-6_11zon.pdf23 Dec 2024
Building Plan Approval (IOD)File: 6-6_11zon.pdf23 Dec 2024
Declaration about Commencement CertificateFile: Format D.pdf23 Dec 2024
Certificates of CA (Form 3)File: Form 3 - 30092024.pdf10 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30092024 (2).pdf10 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30092024.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19-K.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 19-20 - K.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - K.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 21-22- K.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23- K.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24- K.pdf10 Dec 2024
Declaration about Commencement CertificateFile: Format D.pdf21 Nov 2024
Declaration about Commencement CertificateFile: Format D.pdf21 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Oct 24.pdf30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf22 Oct 2024
Declaration in FORM BFile: Form B_11zon.pdf16 Oct 2024
CERSAI detailsFile: Declaration of CERSAI.pdf16 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Ketan heights sold inventory.pdf10 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RERA For Completion.pdf20 Apr 2021
Certificates of CA (Form 5)File: Form 5 REAR.pdf29 Jul 2019
Layout approvalFile: 1.pdf31 Jul 2017
Building plan approvalFile: 3.pdf31 Jul 2017
Building plan approvalFile: 4.pdf31 Jul 2017
Building plan approvalFile: 5.pdf31 Jul 2017
Building plan approvalFile: 1.pdf31 Jul 2017
Building plan approvalFile: 2.pdf31 Jul 2017
PAN CardFile: ketan pan card.pdf31 Jul 2017
Copy of the legal title reportFile: KETAN SEARCH.pdf31 Jul 2017
Details of encumbrancesFile: KETAN SELF DECLARATION PDF.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 1.pdf31 Jul 2017
Building Plan Approval (IOD)File: 1.pdf31 Jul 2017
Building Plan Approval (IOD)File: 2.pdf31 Jul 2017
Building Plan Approval (IOD)File: 3.pdf31 Jul 2017
Building Plan Approval (IOD)File: 4.pdf31 Jul 2017
Building Plan Approval (IOD)File: 5.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT CERTIFICATE.pdf31 Jul 2017
Declaration in FORM BFile: ghosale aff.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf31 Jul 2017
Proforma of Allotment letterFile: KETAN DRAFT.pdf31 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 89 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ketan Heights Wing / Building No A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near S.NO 112/1/1. Near Hill view residency, Opposite RMD College13,700+ in Pune

2 kmKetan Heights Wing / BuiCompleted 163Lapsed / revoked 119Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: ketandevelopers

ketandevelopers has 1 registration on MahaRERA, including Ketan Heights Wing / Building No A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Ketan Heights Wing / Building No A is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ketan Heights Wing / Building No A?

The registered promoter entity is ketandevelopers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ketan Heights Wing / Building No A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ketan Heights Wing / Building No A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Ketan Heights Wing / Building No A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ketan Heights Wing / Building No A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ketan Heights Wing / Building No A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.