KENDALE EMERALDS PHASE III

By KENDALE DEVELOPERS

RG-MH-05396 · RERA P51700055837 · Last updated on MahaRERA portal: 11 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 45%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

KENDALE EMERALDS PHASE III is a Residential / Group Housing project by KENDALE DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700055837 on 23 Apr 2024. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameKENDALE EMERALDS PHASE III
  • TypeResidential / Group Housing
  • Location
    • KATRAP ROAD
    • Belavali
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700055837
  • ReraGenie IDRG-MH-05396

Builder

  • NameKENDALE DEVELOPERS
  • Entity typePartnership
  • PartnersLata Santosh Kendale, Sudhin S Bhattacharya
  • Other registrations2 more →
  • Completed1 of 3
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Current status

64.3%Work done, per cost certificate

Figures as on 11 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KENDALE EMERALDS PHASE IIINA88000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 45%.

KENDALE EMERALDS PHASE III: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed57

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots57
Closed/Covered57

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area937 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNICIPAL COUNCIL
Permissible FSI2387.84
Proposed, not sanctioned2,388 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND AND FIRST FLOOR PATEL ESTATE BAZAR PETH KALYAN WEST
Estimated costRs 7.09 cr
Cost incurredRs 4.56 cr
Work done64.28%
BuildingWingEstimatedIncurred
KENDALE EMERALDS PHASE IIINARs 6.80 crRs 4.56 cr
-NARs 28.75 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJ ASSCOAITES
EngineerKB CONSULTANTS
Chartered AccountantM/s. Vidya S. Bhure & Co.
Chartered AccountantGURMUKH ARJANDAS RAGHANI
Chartered AccountantSUNNY BHAGIA
PartnerRole in project
KENDALE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate PH 3.pdf11 Apr 2026
Withdrawal Update Form 2File: Form - 2 Engineer Certificate (PH-3).pdf11 Apr 2026
Withdrawal Update Form 3File: Form 3_ Kendale Emeralds Phase 3_ Q4_ FY 2025-26.pdf11 Apr 2026
Withdrawal Update Form 1File: Form -1 - Architect Certificate - Phase - 3.pdf21 Jan 2026
Withdrawal Update Form 2File: Form -2 Engineer Certificate - Phase -3.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 - Kendale Emeralds Ph III December 2025.pdf21 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Kendale Ph III_FY 2024-25.pdf20 Nov 2025
Withdrawal Update Form 1File: Form -1 - Architect Certificate.pdf19 Oct 2025
Withdrawal Update Form 2File: Form -2 - Engineer Certificate.pdf19 Oct 2025
Withdrawal Update Form 3File: Final Form 3_Emeralds Phase III Sep 2025.pdf19 Oct 2025
Form 1File: Form 1_Kendale Emeralds Ph III March 2025.pdf11 Sep 2025
Form 2File: Form 2_Kendale Emeralds Ph III March 2025.pdf11 Sep 2025
Form 3File: Scan FORM 3- march 2025.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Final Form 3- March 2025.pdf11 Sep 2025
Form 1File: Form -1_Kendale Phase III_Dec 2024.pdf11 Sep 2025
Form 2File: Form 2_Kendale Ph III_Dec 2024.pdf11 Sep 2025
Form 3File: Scan Form3-Dec 2024.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: Scan Form3-Dec 2024.pdf11 Sep 2025
Withdrawal Update Form 1File: Form-1- Architect Certificate.pdf11 Sep 2025
Withdrawal Update Form 2File: Form 2_Kendale Emeralds Ph III June 2025.pdf11 Sep 2025
Withdrawal Update Form 3File: Scanned Form 3_Kendale Emeralds Ph III June 2025_compressed.pdf11 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form3-Dec 2024_compressed.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan FORM 3- march 2025_compressed.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Kendale Ph III_Dec 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1_Kendale Phase III_Dec 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Phase III G Wing C A Certificate Q2 for your reference.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q1 June 2024.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q2 Sep 2024.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Q1 June 2024.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Q2 Sep 2024.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Q1 June 2024.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Q2 Sep 2024.pdf23 Dec 2024
Other - TechnicalFile: CC Verification mail.pdf20 Apr 2024
Other - LegalFile: Conveyance Deed 29-Mar-2024 11-24-12_11zon.pdf29 Mar 2024
Other - LegalFile: DEED OF CONSTITUTION OF PARTNERSHIP ON ADMISSION AND RETIREMENT OF PARTNERS_11zon.pdf28 Mar 2024
Other - TechnicalFile: 1 Other - Technical (6) (1).pdf28 Mar 2024
Proforma of Agreement for saleFile: Final AFS-Kendale Emeralds Phase III.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (2).pdf27 Apr 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance -Finance.pdf22 Apr 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrances Declaration.pdf22 Apr 2023
Details of encumbrances concerned to LegalFile: No Encumbrance -Finance.pdf22 Apr 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrances Declaration.pdf22 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate organisation.pdf22 Apr 2023
Layout approvalFile: Phase III Plan Copy (2).pdf7 Apr 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (69).pdf7 Apr 2023
PAN CardFile: PAN- KENDALE DEVELOPERS.pdf7 Apr 2023
Copy of the legal title reportFile: legal title report_compressed.pdf7 Apr 2023
Copy of Layout Approval (in case of layout)File: Phase III Plan Copy (2).pdf7 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (69).pdf7 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf7 Apr 2023
Declaration about Commencement CertificateFile: Format D (2).pdf7 Apr 2023
Declaration in FORM BFile: Form B.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RAJ ASSOCIATES ARCHITECT FOR RERA PHASE III.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate For Phase III.pdf7 Apr 2023
CERSAI detailsFile: Cersai Declaration.pdf7 Apr 2023
Proforma of Allotment letterFile: Allotment letter.pdf7 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Bank Accounts.pdf7 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation Report.pdf7 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report of AFS.pdf7 Apr 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Kendale Emeralds phase II69 1 and 69 2 1 village katrap near carmel school badlapur east148OngoingOct 2025Oct 2025
Kendale EmeraldsSurvey No 69 1 And 69 2 1 DP road Village Katrap Near Carmel School187OngoingOct 2024Oct 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KENDALE EMERALDS PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Belavali7,600+ in Thane

Builder: KENDALE DEVELOPERS

KENDALE DEVELOPERS has 3 registrations on MahaRERA, including KENDALE EMERALDS and KENDALE EMERALDS. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if KENDALE EMERALDS PHASE III is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KENDALE EMERALDS PHASE III?

The registered promoter entity is KENDALE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KENDALE EMERALDS PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KENDALE EMERALDS PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KENDALE EMERALDS PHASE III?

The professionals named in the filing: Architect: RAJ ASSCOAITES; Engineer: KB CONSULTANTS; Chartered Accountant: M/s. Vidya S. Bhure & Co.; Chartered Accountant: GURMUKH ARJANDAS RAGHANI; Chartered Accountant: SUNNY BHAGIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KENDALE EMERALDS PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KENDALE EMERALDS PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KENDALE EMERALDS PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.