Home / Browse projects / Thane, Maharashtra / KENDALE EMERALDS
KENDALE EMERALDS
RG-MH-15739 · RERA P51700023217 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 11 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KENDALE EMERALDS is a Residential / Group Housing project by Kendale Developers in Thane, Maharashtra, registered with MahaRERA as P51700023217 on 6 Dec 2019. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 11 months from the original filing. 73 of the 148 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameKENDALE EMERALDS
- TypeResidential / Group Housing
- Location
- VILLAGE BELAVLI KATRAP ROAD
- JADHAV NAGAR
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- RERA no.P51700023217
- ReraGenie IDRG-MH-15739
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Dec 2019
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 30 Oct 2025)
- Buildings3 building records
- Documents filed97 files
Current status
Figures as on 29 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 3 WING D | NA | 12 | 10 | 49 | 0 | 49 |
| BUILDING NO 4 WING E | NA | 7 | 5 | 25 | 6 | 31 |
| BUILDING NO 5 WING F | NA | 12 | 10 | 59 | 9 | 68 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 90%.
BUILDING NO 3 WING D43%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 65% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 4 WING E72%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
BUILDING NO 5 WING F81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SAKHARAM MAHADEO JADHAV | Badlapur (M Cl) | Thane |
| Kailash Sakharam Jadhav | Pune (M Corp.) | Pune |
| Sagar Kailash Jadhav | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 5 WING F | NA | Rs 8.83 cr | Rs 8.83 cr |
| BUILDING NO 3 WING D | NA | Rs 6.87 cr | Rs 5.15 cr |
| BUILDING NO 4 WING E | NA | Rs 2.49 cr | Rs 2.49 cr |
| - | NA | Rs 1.00 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJ Associates |
| Engineer | BRIJESH D PARASIYA |
| Chartered Accountant | SUNNY BHAGIA AND ASSOCIATES CHARTERED ACCOUNTANTS |
| Chartered Accountant | Gurmukh A Raghani |
| Partner | Role in project |
|---|---|
| Kendale Developers | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to COVID 19 our construction progress got constantly affected and has continuously and regularly been delayed since then, thereby resulting into an overall delay in project execution and implementation. Sir, we have almost completed our project and only some fit out work is pending and completion permissions are awaited (we are enclosing herewith latest Form I for your reference and record), which we expect to receive in two to three months. Therefore, to cope up with / stabilize the progress, we are applying for an extension of 6 months but we are sure of completing the project in two to
Reason as filed by the promoterSir, we have substantially completed our project and the work of making application for OC i.e. Occupancy Certificate with the Municipal Authorities is on going and it being an administrative task shall take some reasonable time.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12603597 | Ankit Ramchandra Kharwade | Kendale Developers | 10/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Nov 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Nov 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1- Architect Certificate.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Kendale Emeralds Ph II June 2025.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: Scanned Form 3_Kendale Emeralds Ph II June 2025_11zon.pdf | 29 Apr 2026 |
| Form 1File: Form 1 - Architect Certificate (PH 2).pdf | 11 Apr 2026 |
| Form 2File: Form - 2 Engineer Certificate (PH-2).pdf | 11 Apr 2026 |
| Form 3File: Form 3_ Kendale Emeralds Phase 2_ Q4_ FY 2025-26.pdf | 11 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Phase 2 Sold Inventory As on 31032026.pdf | 11 Apr 2026 |
| Form 1File: Form -1 - Architect Certificate - Phase - 2.pdf | 22 Jan 2026 |
| Form 2File: Form -2 Engineer Certificate - Phase -2.pdf | 22 Jan 2026 |
| Form 3File: Form 3 - Kendale Emeralds Ph II December 2025.pdf | 22 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Phase 2 Sold and Booked Inventory.pdf | 22 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Scanned.pdf | 2 Jan 2026 |
| Form 1File: Form -1 - Architect Certificate..pdf | 19 Oct 2025 |
| Form 2File: Form -2 - Engineer Certificate.pdf | 19 Oct 2025 |
| Form 3File: Final Form 3_Emeralds Ph II Sep 2025.pdf | 19 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Phase II Sold Inventory As On 30-09-2025.pdf | 19 Oct 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance As on 31032025.pdf | 22 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Form 3-mar 2025_compressed.pdf | 8 May 2025 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 21 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality assurance As on 31032020.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality assurance As on 31032021.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: D- Wing Sold Details Phase 2.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: E- Wing Sold Details Phase 2.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: F- Wing Sold Details Phase 2.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality assurance As on 31032022.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality assurance As on 31032023.pdf | 19 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance As on 31032024.pdf | 19 Mar 2025 |
| Declaration in FORM BFile: Affidavit_Kendale Developers.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kendale Emeralds Ph II Dec 2024_Final with UDIN.pdf | 27 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Kendale Ph II_Dec 2024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Kendale Phase II_Dec 2024.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Final Form 3_Kendale Emeralds Ph II_June 2024_compressed.pdf | 8 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Final Form 3_Kendale Emeralds Ph II_Sep 2024_compressed.pdf | 8 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Kendale Emeralds Ph II_Sep 2024.pdf | 3 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Kendale Emeralds Ph II_Sep 2024.pdf | 31 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Form 3_Kendale Emeralds Ph II_March 2024_compressed.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Form 3_Kendale Emeralds Ph II_Dec 2023.pdf | 27 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Form 3_Kendale Emeralds Ph II_June 2023.pdf | 26 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scanned Form 3_Kendale Emeralds Ph II_Sep 2024.pdf | 26 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1- Q1-Phase-2.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2- Q1-Phase-2.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q-1.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q-2.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q-3.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Q-4.pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 FY-22-23-Q4 - phase II - signed.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 QUARTER 1.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 QUARTER 3.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 QUARTER 2_compressed.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 QUARTER 4.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PHASE 2.pdf | 1 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE PHASE II.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: PHASE II INVENTORY.pdf | 1 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: PHASE II FORM 5 FY202223.pdf | 1 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - phase 2_compressed.pdf | 25 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kendale Developers Form 5- 2021-22 - Phase II.pdf | 25 Mar 2023 |
| Details of encumbrancesFile: Encumbrance Letter Phase II.pdf | 23 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Units.pdf | 23 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: kendale Developers_compressed.pdf | 23 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certifiacte1PhaseII_compressed.pdf | 18 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect CertifiactePhaseII Q 3_compressed.pdf | 18 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate PHASE II SEPT 2021_compressed.pdf | 18 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate PHASE II DEC 2021.pdf | 18 May 2022 |
| Building plan approvalFile: Revised plan approval.pdf | 11 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised plan approval.pdf | 11 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate _compressed.pdf | 11 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Kendale Developers Form 5- 2017-18- Phase II.pdf | 24 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kendale Developers Form 5- 2018-19- Phase II.pdf | 24 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Kendale Developers Form 5- 2019-20- Phase II.pdf | 24 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Kendale Developers Form 5- 2020-21- Phase II.pdf | 24 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate For Phase II Till 30 June 2021.pdf | 27 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Phae II Till 30 June 2021 Phase II.pdf | 27 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold- booked inventory.pdf | 27 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 27 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase II- Architect Certificate.pdf | 12 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase II- Engineers Certificate 31 March 2021.pdf | 12 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Phase II- Disclosure of sold_ Booked Inventory.pdf | 12 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase II- Form 3.pdf | 12 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kendale Developers Architect Certifcate Phase II As On 31st Dec 2020 (2).pdf | 5 Feb 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Dec 2020 Phase II.pdf | 5 Feb 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VASHNAVI PARK | KATEMANIVALI KALYAN EAST | 8 | Completed | Mar 2011 | Mar 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KENDALE EMERALDS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JADHAV NAGAR7,600+ in Thane
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: Kendale Developers
KENDALE DEVELOPERS has 3 registrations on MahaRERA, including KENDALE EMERALDS and KENDALE EMERALDS. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if KENDALE EMERALDS is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KENDALE EMERALDS?
The registered promoter entity is Kendale Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KENDALE EMERALDS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KENDALE EMERALDS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KENDALE EMERALDS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KENDALE EMERALDS?
The professionals named in the filing: Architect: RAJ Associates; Engineer: BRIJESH D PARASIYA; Chartered Accountant: SUNNY BHAGIA AND ASSOCIATES CHARTERED ACCOUNTANTS; Chartered Accountant: Gurmukh A Raghani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KENDALE EMERALDS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback