Home / Browse projects / Pune, Maharashtra / KEDARNATH
KEDARNATH
RG-MH-01623 · RERA P52100001977 · Last updated on MahaRERA portal: 26 Apr 2022
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 51 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 45 months
- 4 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KEDARNATH is a Others project by Gruha Navnirman Developers in Pune, Maharashtra, registered with MahaRERA as P52100001977 on 31 Jul 2017. Possession was promised by 31 Jul 2022 and is now 51 months past that date. The completion date has moved by 45 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameKEDARNATH
- TypeOthers
- Location
- Pune (M Corp.)
- Pune City
- Pune
- 411030
- Pincode411030
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100001977
- ReraGenie IDRG-MH-01623
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Jul 2017
- Promised completion31 Jul 2022
- Revised completionRevised to 31 Jul 2022 (originally 31 Oct 2018)
- Buildings1 building record
- Documents filed27 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KEDARNATH | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.
KEDARNATH: 76% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 26 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 10% |
| Energy managemcnt | Yes | 10% |
| Fire protection and fire safety requirements | Yes | 10% |
| Electrical meter room, sub-station, receiving station | Yes | 10% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed44
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| KEDARNATH CO OP HSG SOC LTD | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Adesign Studio Arch Siddharth Harischandrakar |
| Engineer | JW Consultants LLP Umesh Joshi as Designated Partner |
| Partner | Role in project |
|---|---|
| Gruha Navnirman Developers | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe hereby request for extension of 10 months in order to finish the site. Kindly find below few major reasons for delay: 1. We have ramp to be constructed for the project. Retaining wall was suggested by structural engineer before start of work. It was not anticipated thus causing 2 months delay in the project. 2. This being a redevelopment project with 24 existing members, delay was caused as decisions regarding changes in flat were not given in-time. Last minute demolition work for internal work caused delay of almost 1 month. 3. After GST implementation in July 2017, lot of material orders
Reason as filed by the promoterThe development work of project ‘Kedarnath’ is underway & we are leaving no stone un-turned to finish the project work at the earliest but due to some reasons & adverse circumstances we are unable to complete the project by 31/10/2019. We have done revised estimate of time required for completion & we are confident to complete the project by 15 May 2020. We have discussed the issue with the allottees & society members they have given their consent for proposed extension of registration under RERA till 15/05/2020. Copy of Society Resolution & sample consent letters from allottees are attached h
Reason as filed by the promoterDear Sir/Madam, A Detailed Explanatory note regarding the state of development works in the project and reason for delay is separately attached along with this application. The main reason for the delay is COVID 19 Pandemic, other reasons are also explained in detail in the Explanatory note. The copy of the Society Resolution agreeing for the extension of time for completion, Form E along with supporting documents are enclosed herewith. Your honor is requested to kindly grant an extension for RERA Registration till 30/06/2021. Kindly do the needful and oblige. Sincere regards For GRUH NAVNIRMA
Reason as filed by the promoterProject Development is completed , However we need further time to complete finishing work, Handover possession of Units, Complete the Project Handover and conveyance procedures
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000269590 | Aditya Madhusudan Sathaye | Abhijit D Kenjale | 16/10/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed27
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration about Commencement CertificateFile: KEDARNATH - DECLARATION ABOUT COMMENCEMENT CERTIFICATE.PDF | 26 Apr 2022 |
| CERSAI detailsFile: cersai report.pdf | 26 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GNN FORM 5 KEDARNATH FY19-20.pdf | 26 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GNN FORM 5 KEDARNATH FY20-21.pdf | 26 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kedarnanth - Form 1.pdf | 18 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Engineer Certificate for Quality Assurance.pdf | 18 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: KEDARNATH - SOLD AND UNSOLD INVENTORY.PDF | 18 Apr 2022 |
| Certificates of CA (Form 3)File: Kedarnanth - Form 3_compressed.pdf | 18 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 FORM 1 - 30092019.pdf | 12 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 04 FORM 2 - 30092019.pdf | 12 Nov 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 2017-2018.PDF | 11 Nov 2019 |
| Certificates of CA (Form 3)File: Form 3-Kedarnath COMPRESSED.pdf | 29 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KEDARNATH-Form 5 2018-2019 COMPRESSED.pdf | 29 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Document.pdf | 28 Feb 2018 |
| Building plan approvalFile: Kedarnath Plan.pdf | 26 Jul 2017 |
| Layout approvalFile: Kedarnath Plan.pdf | 26 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Kedarnath Plan.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: Kedarnath Plan.pdf | 26 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Kedarnath CC.pdf | 26 Jul 2017 |
| Declaration in FORM BFile: Form B Declaration Kedaarnath Soc.pdf | 26 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kedarnath.pdf | 22 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 Kedarnath.pdf | 22 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect 's Certificate_Kedarnath Soc_1-7-17.pdf | 14 Jul 2017 |
| Details of encumbrancesFile: ENCUM Kedarnath.pdf | 4 Jul 2017 |
| Proforma of Allotment letterFile: Kedarnath CHS RERA MODEL AGREEMENT.pdf | 4 Jul 2017 |
| PAN CardFile: PAN CARD COPY.PDF | 29 Jun 2017 |
| Copy of the legal title reportFile: Kedarnath_Search_and_Title_Report_R-11-8-16.pdf | 29 Jun 2017 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| TRUPTI | THORAT LANE CTS NO 109 FINAL PLOT NO 54 ERANDWANE PUNE | 11 | Completed | Jan 2017 | Jan 2017 |
| MATRUSMRITI APARTMENTS | ERANDWANE OPP SNDT COLLEGE PALANDE COURIER LANE KOTHRUD PUNE | 12 | Completed | Dec 2016 | Late, Apr 2017 |
| PERFECT APARTMENTS | SURVEY NO 44 4 45 5 AND 46 7 CTS NO 323 AND 327 PLOT NO 14 AND 15 SHEELAVIHAR COLONY KOTHRUD | 26 | Completed | Dec 2016 | Dec 2016 |
| CENTURY COOPERATIVE HOUSING SOCIETY LTD | SURVEY NO 45 9A CTS NO 323 SHEELAVIHAR COLONY KOTHRUD | 16 | Completed | Aug 2016 | Aug 2016 |
| VIJIGISHA | S NO 93B 1B SHIVAJINAGAR BHAMBURDA PUNE | 20 | Completed | Aug 2016 | Late, Oct 2016 |
| ANUVEE | PLOT NO 55 DHANUKAR COLONY | 14 | Completed | Jul 2016 | Jul 2016 |
| KALAKUNJ A B | SR NO 26 DAHANUKAR COLONY KOTHRUD 38 | 40 | Completed | Jun 2016 | Late, Dec 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 27 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep KEDARNATH on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pune (M Corp.)13,700+ in Pune
Filed coordinates, straight-line distance. 259 registered projects within 2 km.
NYATI EVANIA
NYATI CONSTRUCTION PRIVATE LIMITED
CENTRALVISTA
NAIKNAVARE DEVELOPERS PVT. LTD.
Guardian Cityscapes Phase-3
Guardian Homes Private Limited
SARASNAGAR
CITY ETHERNAL LLP
PROFITBAY
LAXMI SPACECON LLP
SUN GLORY
Jindal Mittal Graha Nirman Pvt. Ltd.
Builder: Gruha Navnirman Developers
Gruha Navnirman Developers has 5 registrations on MahaRERA, including TRIMURTI and SWAYAMPRABHA. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 7 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that KEDARNATH shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KEDARNATH is delayed beyond 31 Jul 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KEDARNATH?
The registered promoter entity is Gruha Navnirman Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KEDARNATH?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KEDARNATH?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KEDARNATH?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KEDARNATH?
The professionals named in the filing: Architect: Adesign Studio Arch Siddharth Harischandrakar; Engineer: JW Consultants LLP Umesh Joshi as Designated Partner. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KEDARNATH?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback