Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 5 complaints at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KCD Jogesh Eva is a Residential / Group Housing project by KCD Heritage Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029753 on 29 Jun 2021. Possession was promised by 29 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 20 of the 41 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 5 complaints are on record with the regulator.
At a glance
Project
- NameKCD Jogesh Eva
- TypeResidential / Group Housing
- Location
- Natwar Nagar Road 1
- Jogeshwari
- Andheri
- Mumbai Suburban
- 400060
- Pincode400060
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800029753
- ReraGenie IDRG-MH-29914
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Jun 2021
- Promised completion29 Dec 2025
- Revised completionRevised to 29 Dec 2025 (originally 31 Dec 2023)
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 17 Apr 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KCD JOGESH EVA | NA | 16 | 16 | 41 | 0 | 41 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 67%.
KCD JOGESH EVA: 56% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 67% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 64% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| JOGESH CO-OPERATIVE HOUSING SOCIETY LIMITED | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASHISH SOLANKI |
| Engineer | MS UNISTEPS CONSULTING PVT LTD |
| Chartered Accountant | NEHALI DOSHI |
| Partner | Role in project |
|---|---|
| KCD Heritage Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO COVID 19 NOT ABLE TO COMPLETE PROJECT PLEASE GRANT US EXTENSION UNTILL 30/12/2024
Reason as filed by the promoterDue to delay in approval process for obtaining aviation NOC which led to the further delay of getting FCC the project was not able to get completed in time. We would like to request you to further granr us extension for 12 month.
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600041 | SARIKA SANTOSH GAIKWAD | KCD Heritage Private Limited | 03/01/2026 |
| CC12600495 | Ajinkya Anil Jadhav | KCD Heritage Private Limited | 28/01/2026 |
| CC12601500 | Parag Jamdade | KCD Heritage Private Limited | 18/03/2026 |
| CC12602048 | Ramesh Dattatray Devrukhkar | KCD Heritage Private Limited | 07/04/2026 |
| CC12603009 | Deepali Satishchandra Palekar | KCD Heritage Private Limited | 21/05/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jun 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jun 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 May 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - KCD Jogesh Eva - Mar 2025.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - KCD Jogesh Eva - Mar 2025 (1).pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - KCD Jogesh Eva - Mar 2025.pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory - KCD Jogesh Eva.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - KCD Jogesh Eva - Mar 2024.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - KCD Jogesh Eva - Jun 2024.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - KCD Jogesh Eva - Sep 2024.pdf | 11 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - KCD Jogesh Eva - Dec 2024.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - KCD Jogesh Eva - Mar 2024.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - KCD Jogesh Eva - Jun 2024.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - KCD Jogesh Eva - Sep 2024.pdf | 11 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 dec 24.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - KCD Jogesh Eva - Mar 2024.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - KCD Jogesh Eva - Jun 2024.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - KCD Jogesh Eva - Sep 2024.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - KCD Jogesh Eva - Dec 2024.pdf | 11 Apr 2025 |
| CERSAI detailsFile: CERSAI DECLARATION - KCD JOGESH EVA.pdf | 11 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - KCD Jogesh Eva - FY 2023-24.pdf | 11 Apr 2025 |
| Declaration in FORM BFile: KCD Jogesh Eva - Form B.pdf | 27 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A jogesh eva 23-24.pdf | 27 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 2429772_FurtherCC_signed.pdf | 24 Dec 2024 |
| Declaration in FORM BFile: FORM B KCD JOGESH EVA.pdf | 12 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: KCD Jogesh Eva - Inventory - Dec 2023.pdf | 12 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory - KCD Jogesh Eva.pdf | 7 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY - KCD JOGESH EVA.pdf | 7 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 7 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Audit Report 2223 KCD Jogesh.pdf | 20 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: KCD Jogesh Eva - Inventory - Dec 2023.pdf | 18 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Cert - KCD Jogesh Eva - Dec 2023.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch cert - KCD Jogesh Eva - Dec 2023.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Struct Engg - KCD Jogesh Eva - Dec 2023.pdf | 8 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Struct Engg - KCD Jogesh Eva - Sep 2023.pdf | 6 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory - Sep 2023 - KCD Jogesh Eva.pdf | 6 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA - KCD Jogesh Eva - Sep 2023.pdf | 6 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arch - Kcd Jogesh Eva - Sep 2023.pdf | 19 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2390699_FurtherCC_signed.pdf | 14 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 14 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - KCD JOGESH EVA - JUNE 2023.pdf | 24 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - KCD JOGESH EVA - JUNE 2023.pdf | 24 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - KCD JOGESH EVA - FY 2022-23.pdf | 24 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jogesh March 2023.pdf | 22 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 -Jogesh -march 2022.pdf | 22 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- KCD Jogesh Eva - March 2023- Form 1.pdf | 8 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JOGESH EVA.pdf | 27 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate-kcd jogesh eva.pdf | 4 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert Jogesh Eva (1).pdf | 21 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engg cert- Jogesh Eva.pdf | 18 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 1729406278NoteSheet_18534_signed.pdf | 12 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2330556_FurtherCC_signed.pdf | 12 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JOGESH CHS ACCOUNTANT CERTIFICATE.pdf | 19 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 (1).pdf | 6 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 MahaRERA.pdf | 6 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Booked Inventory.pdf | 26 Jul 2021 |
| Copy of the legal title reportFile: TITLE-compressed.pdf | 24 Jun 2021 |
| Declaration about Commencement CertificateFile: Form D - Declaration of CC.pdf | 24 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: 2278496_FirstCC_signed.pdf | 23 Jun 2021 |
| Declaration in FORM BFile: img-617123029.pdf | 23 Jun 2021 |
| Layout approvalFile: jogesh plan pg 1.pdf | 3 Jun 2021 |
| Layout approvalFile: jogesh plan pg 2.pdf | 3 Jun 2021 |
| Layout approvalFile: jogesh plan pg 3.pdf | 3 Jun 2021 |
| Layout approvalFile: jogesh plan pg 4.pdf | 3 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: jogesh plan pg 1.pdf | 3 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: jogesh plan pg 2.pdf | 3 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: jogesh plan pg 3.pdf | 3 Jun 2021 |
| Copy of Layout Approval (in case of layout)File: jogesh plan pg 4.pdf | 3 Jun 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 of RERA (1).pdf | 3 Jun 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 3 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certified form 3 (1)-compressed.pdf | 3 Jun 2021 |
| Proforma of Allotment letterFile: Final Jogesh - Draft - Sale Agreement .pdf | 3 Jun 2021 |
| Building plan approvalFile: iod certificate.pdf | 18 May 2021 |
| Details of encumbrancesFile: no encumbrance.pdf | 18 May 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: iod certificate.pdf | 18 May 2021 |
| Proforma of Allotment letterFile: allotment letter scan copy.pdf | 18 May 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PALKHI AURA | MUMBAI | 101 | Completed | Jun 2019 | Late, Feb 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep KCD Jogesh Eva on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Jogeshwari6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 296 registered projects within 2 km.
RATAN HERITAGE
NEXUS BUILDERS & DEVELOPERS
JP Parkway
Srushti Raj Developers LLP
Gyan Gold Crest
Gyan S. P. Developers LLP
PREM BUILDERS
PREM BUILDERS
Edenrose
Hillview Venture
AIM Garden
AIM Developers
See every Mumbai Suburban project, with the district possession charts
Builder: KCD Heritage Private Limited
KCD Heritage Private Limited has 4 registrations on MahaRERA, including KCD Lumin and KCD Jogesh Eva. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that KCD Jogesh Eva shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KCD Jogesh Eva is delayed beyond 29 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KCD Jogesh Eva?
The registered promoter entity is KCD Heritage Private Limited, a company as per the filing. Its GSTIN 27AAFCK5450N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KCD Jogesh Eva?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KCD Jogesh Eva?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KCD Jogesh Eva?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KCD Jogesh Eva?
The professionals named in the filing: Architect: ASHISH SOLANKI; Engineer: MS UNISTEPS CONSULTING PVT LTD; Chartered Accountant: NEHALI DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KCD Jogesh Eva?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback