KAVYA ASHWAMEGH

By KAVYA CONSTRUCTION COMPANY

RG-MH-11330 · RERA P51800007183 · Last updated on MahaRERA portal: 24 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 6 complaints at MahaRERA
  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
7 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 95%
6Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

KAVYA ASHWAMEGH is a Others project by KAVYA CONSTRUCTION COMPANY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007183 on 17 Aug 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 42 months from the original filing. 6 complaints are on record with the regulator.

At a glance

Project

  • NameKAVYA ASHWAMEGH
  • TypeOthers
  • Location
    • MUMBAI
    • Kurla
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007183
  • ReraGenie IDRG-MH-11330

Builder

  • NameKAVYA CONSTRUCTION COMPANY
  • Entity typePartnership
  • PartnersMANSUKHLAL CHATRABHUJ VORA, JIGNESH MANSUKHLAL VORA
  • Declared earlier projects4 →

Key dates

22 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAVYA ASHWAMEGH CHSL A WINGNA190000
KAVYA ASHWAMEGH CHSL B WINGNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 95%.

KAVYA ASHWAMEGH CHSL A WING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises3%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
KAVYA ASHWAMEGH CHSL B WING44%
ActivityProgress
Excavation95%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises3%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
KAVYA ASHWAMEGH CHSL A WING11
KAVYA ASHWAMEGH CHSL B WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area921 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5649.04
Proposed, not sanctioned2,302 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD, VENUS APARTMENT, GROUND FLOOR, WADIA STREET, TARDEO, MUMBAI-400034

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISION ARCHITECTURAL CONSULTANT
EngineerPARAS COUNSULTANTS
PartnerRole in project
KAVYA CONSTRUCTION COMPANY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013463Jun 2021 → Dec 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 24 MONTHS

EXT51800010442Jun 2021 → Jun 2022

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000044036Yogesh MaruKavya Construction Company07/04/2018
CC006000000500403Yogesh MaruKavya Construction Company10/05/2024
CC006000000100564Shah InvestmentsKavya Construction Company17/08/2019
CC006000000196989Tejas ManiarKavya Construction Company13/05/2021
CC006000000408559Rajesh Vinodchandra ShahKAVYA CONSTRUCTION COMPANY20/12/2023
CC12501960Rahul Suresh BelwalkarMr Nimish Manshuklal Vora16/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM - 2A KCC.pdf24 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KCC-FORM-1 apr to june.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KCC-FORM-1 july tosep.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KCC-FORM-1 oct to sep.pdf7 Feb 2025
Certificates of CA (Form 3)File: KCC FORM-3 31122024 (1).pdf5 Feb 2025
Certificates of CA (Form 3)File: july to sep 24 form 3.pdf5 Feb 2025
Certificates of CA (Form 3)File: oct to dec 24 form 3.pdf5 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: KCC-FORM-5 FY 23-24.pdf21 Jan 2025
Certificates of CA (Form 3)File: form 3 oct to dec 23.pdf15 Jan 2025
Certificates of CA (Form 3)File: form 3 jan to march 24.pdf15 Jan 2025
Certificates of CA (Form 3)File: form 3 april to june 24.pdf15 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 12 23.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 03 24.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 06 24.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 09 24.pdf30 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 12 24.pdf30 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf21 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1-31-12-2023.pdf27 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf27 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf6 Jun 2024
Certificates of CA (Form 3)File: Form-3 KCC 06 23.pdf27 Oct 2023
Certificates of CA (Form 3)File: Form-3 KCC 09 23.pdf27 Oct 2023
Disclosure of sold/ booked inventoryFile: Kavya Ashwamegh-Inventory disclosure format.pdf25 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-KCC-06 23.pdf5 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-KCC-09 23.pdf5 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KCC-Ashwamegh- Rera Arc Certificate-06 23.pdf3 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KCC-Ashwamegh- Rera Arc Certificate-09 23.pdf3 Oct 2023
Certificates of CA (Form 3)File: Form- 3 KCC 03 21.pdf19 Aug 2023
Certificates of CA (Form 3)File: Form -3 KCC 03 22.pdf19 Aug 2023
Certificates of CA (Form 3)File: Form- 3 KCC 03 23.pdf19 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 KCC 21-22.pdf18 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 KCC 22-23.pdf18 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 KCC 03 20.pdf17 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 KCC 03 21.pdf17 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 KCC 03 22.pdf17 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 KCC 03 23.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A KCC 03 22.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A KCC 03 23.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: ASHWAMEGH SOLD UNSOLD (1).pdf23 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 03 19.pdf6 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 03 20.pdf6 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 03 21.pdf6 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 03 22.pdf6 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 03 23.pdf6 May 2023
Certificates of CA (Form 3)File: KCC-Rera SNCO-Form3-Dec-20.pdf4 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Kavya Construction Co 20-21.pdf5 Jan 2023
Certificates of CA (Form 5)File: KCC FORM 5 17-18.pdf1 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: KCC FORM 5 18-19.pdf1 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: KCC FORM 5 19-20.pdf1 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: kavya Construction Company 19-20.pdf28 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A KCC 2020.pdf28 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A KCC 2021.pdf28 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A KCC 2021.pdf28 Jul 2021
Disclosure of sold/ booked inventoryFile: ASHWAMEGH INVENTORY - RERA UPDATION.pdf28 Jul 2021
Declaration about Commencement CertificateFile: CC COVERING LETTER ASHWAMEGH.pdf21 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf17 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A 19-20.pdf14 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf14 Jul 2021
Disclosure of sold/ booked inventoryFile: INVENTORY DISCLOSURE.pdf14 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf14 Jul 2021
Certificates of CA (Form 3)File: CA kavya Ashwamegh compressed.pdf19 Oct 2018
Certificates of CA (Form 5)File: KAVYA ASHWAMEGH compressed.pdf9 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ashwamegh ARCH.pdf30 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: Revaldation CC.pdf27 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTIFICATE2.pdf29 Jul 2017
Certificates of CA (Form 3)File: ca certificate.pdf29 Jul 2017
Building plan approvalFile: IOD.pdf27 Jul 2017
Details of encumbrancesFile: ENCRUMBRANCE ASHWAMEGH.pdf27 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form.pdf26 Jul 2017
Declaration in FORM BFile: FORM B.pdf22 Jul 2017
Layout approvalFile: SANCTION PLAN.pdf18 Jul 2017
PAN CardFile: KCC PAN CARD.pdf18 Jul 2017
Copy of the legal title reportFile: title.pdf18 Jul 2017
Copy of Layout Approval (in case of layout)File: SANCTION PLAN.pdf18 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: cc1mb.pdf18 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf18 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Kavya Hill ViewTHANE107CompletedJan 2012Late, Mar 2012
Atlas, ThaneTHANE45CompletedMar 2011Late, May 2011
Atlantis, ThaneTHANE84CompletedMar 2010Late, Jul 2010

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 42 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAVYA ASHWAMEGH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI6,700+ in Mumbai Suburban

2 kmKAVYA ASHWAMEGHCompleted 118Lapsed / revoked 63Other 105Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: KAVYA CONSTRUCTION COMPANY

KAVYA CONSTRUCTION COMPANY has 1 registration on MahaRERA, including KAVYA ASHWAMEGH. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that KAVYA ASHWAMEGH shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KAVYA ASHWAMEGH is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAVYA ASHWAMEGH?

The registered promoter entity is KAVYA CONSTRUCTION COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAVYA ASHWAMEGH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KAVYA ASHWAMEGH?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KAVYA ASHWAMEGH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAVYA ASHWAMEGH?

The professionals named in the filing: Architect: VISION ARCHITECTURAL CONSULTANT; Engineer: PARAS COUNSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAVYA ASHWAMEGH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAVYA ASHWAMEGH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAVYA ASHWAMEGH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.