Completed No litigation declared Residential / Group Housing project

Kashish Park Ghatkopar

By Ladam Homes Pvt Ltd.

RG-MH-08099 · RERA P51800002692 · Last updated on MahaRERA portal: 9 Jul 2022

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 99%
9Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Kashish Park Ghatkopar is a Residential / Group Housing project by Ladam Homes Pvt Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002692 on 2 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. The completion date has moved by 18 months from the original filing. 9 complaints are on record with the regulator.

At a glance

Project

  • NameKashish Park Ghatkopar
  • TypeResidential / Group Housing
  • Location
    • Rajaram Bane Marg
    • Ghatkopar East
    • Kurla
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002692
  • ReraGenie IDRG-MH-08099

Builder

  • NameLadam Homes Pvt Ltd.
  • Entity typeCompany
  • Managing DirectorSumesh Bharat Bhushan Agarwal
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CentroidNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.

Centroid: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises99%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered67

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,800 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7617.58
Proposed, not sanctioned7,385 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16 Ground Floor Kanakia Zillion LBS CST Road Junction BKC Annexe Kurla West Mumbai 400070 Ma

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSadashiv Nargundkar And Associates
EngineerMehmood Ahmed Waris Ali
Chartered AccountantI P Mehta & Company
Chartered AccountantC R More & Associates
PartnerRole in project
Ladam Homes Pvt Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009647Jun 2021 → Jun 2022

Reason as filed by the promoterOC is held up for want of Compliance of matters which involves the Government Authorities and further actions at their end but their functioing has been disrupted for last one year due to current Covid situation. So we are not permitted

Litigation declared1

CaseCourtStatus
MARJI/96/2017/2016Small Cause CourtHearing

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000023179SHANKAR B AUSARIKARSUMESH AGARWAL20/02/2018
CC006000000055065Ladam Homes Pvt. Ltd.Shankar Auserikar30/07/2018
CC006000000055815DNYANESHWAR LAXAMAN MORELADAM HOMES PVT LTD20/08/2018
CC006000000057633TUSHAR SHANKAR HULELADAM HOMES PRIVATE LIMITED (FORMERLY KNOWN AS LADAM HOMES LIMITED)31/08/2019
CC006000000079392Rajesh PanigrahiLadam Homes Ltd (Sumesh Agarwal)21/05/2019
CC006000000141037SOJAL AMIT SAWANT AND AMIT NAMDEO SAWANTLADAM HOMES PRIVATE LIMITED (FORMERLY KNOWN AS LADAM HOMES LIMITED)27/09/2019
CC006000000161368Prakash Jagannath Hinge & Sheetal P. HingeLadam Homes Private Limited02/11/2019
CC006000000196449Aditya Dnyaneshwar SheteLadam Homes Pvt. Ltd.22/03/2021
CC006000000195014Harshada Bhalesh NaikLadam Homes Pvt Ltd12/12/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jul 2021

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: LHPL Status of Conveyence Jun2022.pdf9 Jul 2022
Status of ConveyanceFile: Final MahaRERA LHPL conveyance note 05April2022 New.pdf5 Apr 2022
Status of ConveyanceFile: Final MahaRERA LHPL order 20 conveyance note 31DEC21.pdf3 Jan 2022
Status of ConveyanceFile: LHPL Centroid Conveyance Status note as on Sept 2021.pdf5 Oct 2021
Status of ConveyanceFile: Status of conveyance dated 13Aug2021.pdf14 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SRA Full Occupation certificate Centroid 30 Jun 2021.pdf6 Jul 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 SNA certificatte 5-7-2021.pdf6 Jul 2021
Disclosure of sold/ booked inventoryFile: Circular 29 Disclosure of sold OR booked inventory.pdf10 May 2021
Certificates of CA (Form 5)File: LHPL RERA FORM 5 dt 29 Sep 2020.pdf30 Sep 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate Dtd 21 August 2020.pdf7 Sep 2020
Details of Restarting of Construction work post lockdownFile: LHPL RERA COVID restart dt 19June2020_signed.pdf19 Jun 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SRA to SNA - Part Occupation for Sale Bldg No-4 dt 30sep19.pdf4 Oct 2019
Certificates of CA (Form 5)File: LHPL RERA Form 5 dt 26Sept19.pdf28 Sep 2019
Proforma of Allotment letterFile: LHPL RERA AFS.pdf24 Sep 2019
Proforma of Allotment letterFile: Final Executable AFS Centroid post AU Bank 2019April22.pdf24 Apr 2019
Details of encumbrancesFile: LHPL Encumbrance certificate dt 22April19.pdf23 Apr 2019
Form 2AFile: LHPL RERA Form 2A for quarter ended 31Dec19 dt 02jan19.pdf2 Jan 2019
Details of encumbrancesFile: AU Small Finance Bank Encumbrance dt 13Dec18 uploaded on 21Dec18.pdf24 Dec 2018
Details of encumbrancesFile: AU Small Finance Bank Encumbrance dt 13Dec18.pdf21 Dec 2018
Proforma of Allotment letterFile: Final Executable AFS Centroid post AU Bank 2018 Dec 19.pdf21 Dec 2018
Certificates of CA (Form 5)File: LHPL RERA Form 5 dt 26Sept18.pdf28 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: CC for Sale Building Further extended upto 15th Floor dt 01aug18.pdf17 Aug 2018
Certificates of CA (Form 3)File: LHPL Form-3 CA Certificate Qtr March 2018.pdf28 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LHPL RERA Form 1 Architech Certificate March 2018.pdf27 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LHPL Form 2 Engineer Certificate March 2018.pdf27 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rahul Gupta Form-2 Engineers Certificate dt 24apr18.pdf27 Apr 2018
Certificates of CA (Form 3)File: LHPL RERA CA certificate 31st March 2018.pdf27 Apr 2018
Certificates of CA (Form 3)File: LHPL Form 3.pdf29 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SNA dt 25jan18.pdf27 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rahul Gupta Engineers Certificate.pdf27 Jan 2018
Certificates of CA (Form 3)File: LHPL CA Certificate FORM-3 Dt 22jan18.pdf27 Jan 2018
Certificates of CA (Form 3)File: CA Certificate form 3 RERA LHPL Centroid dt 23oct17.pdf31 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate RERA Centroid 2017oct25.pdf26 Oct 2017
Certificates of CA (Form 3)File: CA Certificate form 3 RERA LHPL Centroid dt 2017oct23-min.pdf26 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Centroid RERA Architect Certificate dt 30sep17.pdf25 Oct 2017
Proforma of Allotment letterFile: Updated RERA LHPL reservation letter 2017oct23.pdf25 Oct 2017
Proforma of Allotment letterFile: Executable RERA AFS Centroid 2017aug19.pdf25 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf27 Jul 2017
Proforma of Allotment letterFile: RERA ALLOTMENT LETTER AND AFS CENTROID.pdf27 Jul 2017
Details of encumbrancesFile: 3 Encumbrance Index 2 Centroid.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sadashiv Nargunkar Architect's Cert Dt 17jul17.pdf26 Jul 2017
Building plan approvalFile: 10 IOD Amended plan of sale bldg, dt 01jul14.pdf25 Jul 2017
Building plan approvalFile: 10 IOA 11 Jan, 13.pdf25 Jul 2017
Building plan approvalFile: IOD Plans Centroid Dt 16nov16.pdf25 Jul 2017
Layout approvalFile: 14 Ghatkopar Project Site Layout Approval 11oct10.pdf25 Jul 2017
Layout approvalFile: 10 Centroid Layout Ground 8th Floor Plan Dt 16nov16.pdf25 Jul 2017
Building plan approvalFile: Bldg Plan section 16 Nov 2016.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: 14 Ghatkopar Project Site Layout Approval 11oct10.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: 10 Centroid Layout Ground 8th Floor Plan Dt 16nov16.pdf25 Jul 2017
Building Plan Approval (IOD)File: 10 IOA 11 Jan, 13.pdf25 Jul 2017
Building Plan Approval (IOD)File: 10 IOD Amended plan of sale bldg, dt 01jul14.pdf25 Jul 2017
Building Plan Approval (IOD)File: IOD Plans Centroid Dt 16nov16.pdf25 Jul 2017
Building Plan Approval (IOD)File: Bldg Plan section 16 Nov 2016.pdf25 Jul 2017
Declaration in FORM BFile: Affidavit Cum Declaration.pdf25 Jul 2017
Certificates of CA (Form 3)File: CA Certificate of Centroid dt 22jul17 .pdf24 Jul 2017
PAN CardFile: 2 Pancard of LHPL dt 07jun95.pdf15 Jul 2017
Copy of the legal title reportFile: 8 Centroid Legal Title Report.pdf15 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificate.pdf15 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Om Heights, Kashish Park - KalyanKashish Park Survey No 24 Hissa No 2 village Gandhare Taluka Kalyan District Thane 421301119CompletedDec 2012Late, Nov 2015
Om Residency, Kashish Park - KalyanKashish Park Survey No 24 Hissa No 2 village Gandhare Taluka Kalyan District Thane 42130110CompletedAug 2012Late, Dec 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kashish Park Ghatkopar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar East6,700+ in Mumbai Suburban

2 kmKashish Park GhatkoparCompleted 105Lapsed / revoked 63Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 260 registered projects within 2 km.

Builder: Ladam Homes Pvt Ltd.

Ladam Homes Pvt Ltd. has 1 registration on MahaRERA, including Kashish Park Ghatkopar. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Kashish Park Ghatkopar is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kashish Park Ghatkopar?

The registered promoter entity is Ladam Homes Pvt Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kashish Park Ghatkopar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kashish Park Ghatkopar?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kashish Park Ghatkopar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kashish Park Ghatkopar?

The professionals named in the filing: Architect: Sadashiv Nargundkar And Associates; Engineer: Mehmood Ahmed Waris Ali; Chartered Accountant: I P Mehta & Company; Chartered Accountant: C R More & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kashish Park Ghatkopar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kashish Park Ghatkopar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kashish Park Ghatkopar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.