Home / Browse projects / Satara, Maharashtra / KARTIKIASHWINI

Completed No litigation declared Residential / Group Housing project

KARTIKIASHWINI

By ASHWINI BUILDER'S & DEVELOPERS Pvt. Ltd.

RG-MH-26267 · RERA P52700014192 · Last updated on MahaRERA portal: 13 Jun 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
19 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

KARTIKIASHWINI is a Residential / Group Housing project by ASHWINI BUILDER'S & DEVELOPERS Pvt. Ltd. in Satara, Maharashtra, registered with MahaRERA as P52700014192 on 14 Nov 2017. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameKARTIKIASHWINI
  • TypeResidential / Group Housing
  • Location
    • SATARA KOREGAON ROAD
    • SANGAMNAGAR
    • Vanvaswadi
    • Satara
    • 415003
  • Pincode415003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700014192
  • ReraGenie IDRG-MH-26267

Builder

  • NameASHWINI BUILDER'S & DEVELOPERS Pvt. Ltd.
  • Entity typeCompany
  • Managing DirectorASHOK BABURAO JARE
  • ChairpersonsABHISHEK ASHOK JARE, ASHUTOSH ASHOK JARE
  • Other registrations4 more →
  • Completed4 of 5

Key dates

this monthRegisteredNov 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Nov 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA60000
B WINGNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 95%.

A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 13 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes25%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
A WING11
B WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2153.68
Proposed, not sanctioned2,154 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJI CIRCLE SATARA

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN MOHITE
EngineerMANGESH AVINASH LAWAND
Chartered AccountantP L DAIV ABD ASSOCIATES
Chartered AccountantMS YOGESH PATIL AND CO
PartnerRole in project
ASHWINI BUILDER'S & DEVELOPERS Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jun 2024

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Kartiki A Wing (1).pdf13 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Kartiki B Wing (1).pdf13 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: Kartiki Form 4 (1).pdf13 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Certificate.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KARTIKIASHWINI ARCH.pdf25 Jan 2023
Certificates of CA (Form 3)File: Kartikiashwini Certificate.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kartikiashwini.pdf23 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Kartikiashwini Certificate.pdf21 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kartiki Arch Cert.pdf25 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG 2 31-3-22.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Kartiki 1 A Wing Sold Inventory.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Kartiki B Sold Inventory.pdf7 Apr 2022
Certificates of CA (Form 3)File: Kartik Ashwini CA 31-3-22.pdf7 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200229042374_For_Asset_Based_Search_29_01_2022_14_44_50_208.pdf29 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC 21.pdf10 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: kartikiashwini-30 sept.pdf6 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: kartikiashwini - 30 DEC-.pdf6 Jan 2022
Certificates of CA (Form 3)File: DEC 21 CA 3 F.pdf6 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch 14-8.pdf16 Aug 2021
Certificates of CA (Form 3)File: KARTIKI ASHWINI CA 14-8.pdf16 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Kartikiashwini Form 5 20-21.pdf10 Aug 2021
Status of ConveyanceFile: Ashwini Dixit.pdf10 Aug 2021
Status of ConveyanceFile: Dipak Dixit.pdf10 Aug 2021
Declaration about Commencement CertificateFile: DEC 1.pdf7 Aug 2021
Disclosure of sold/ booked inventoryFile: SOLD 1.pdf7 Aug 2021
Status of ConveyanceFile: 1.pdf7 Aug 2021
Status of ConveyanceFile: 2.pdf7 Aug 2021
Status of ConveyanceFile: 3.pdf7 Aug 2021
Status of ConveyanceFile: 4.pdf7 Aug 2021
Status of ConveyanceFile: 5.pdf7 Aug 2021
Status of ConveyanceFile: 6.pdf7 Aug 2021
Status of ConveyanceFile: 7.pdf7 Aug 2021
Status of ConveyanceFile: 8.pdf7 Aug 2021
Status of ConveyanceFile: 9.pdf7 Aug 2021
Status of ConveyanceFile: 10.pdf7 Aug 2021
Status of ConveyanceFile: 11.pdf7 Aug 2021
Status of ConveyanceFile: 12.pdf7 Aug 2021
Status of ConveyanceFile: 13.pdf7 Aug 2021
Status of ConveyanceFile: 14.pdf7 Aug 2021
Status of ConveyanceFile: 15.pdf7 Aug 2021
Status of ConveyanceFile: 16.pdf7 Aug 2021
Status of ConveyanceFile: 17.pdf7 Aug 2021
Status of ConveyanceFile: 18.pdf7 Aug 2021
Status of ConveyanceFile: 19.pdf7 Aug 2021
Status of ConveyanceFile: 19.pdf7 Aug 2021
Status of ConveyanceFile: 20.pdf7 Aug 2021
Status of ConveyanceFile: 21.pdf7 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM NO 5 19-20.pdf5 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM NO 5 18-19.pdf10 Mar 2020
Status of ConveyanceFile: Ajay Jangam.pdf18 Dec 2019
Status of ConveyanceFile: Ajay Jangam.pdf18 Dec 2019
Status of ConveyanceFile: Ajit Nalawade.pdf18 Dec 2019
Status of ConveyanceFile: Anita Ajnalkar.pdf18 Dec 2019
Status of ConveyanceFile: Archana Shende.pdf18 Dec 2019
Status of ConveyanceFile: Kiran Kharat.pdf18 Dec 2019
Status of ConveyanceFile: Narendra P Darveshi.pdf18 Dec 2019
Status of ConveyanceFile: Sachin Katkar.pdf18 Dec 2019
Status of ConveyanceFile: Sachin Kharat.pdf18 Dec 2019
Status of ConveyanceFile: Swapnil Mane.pdf18 Dec 2019
Status of ConveyanceFile: Tulshiram Deshmukh.pdf18 Dec 2019
Status of ConveyanceFile: VRUSHALI GAIDHAR.pdf18 Dec 2019
Status of ConveyanceFile: Avdhut Kamble 1.pdf22 Jul 2019
Status of ConveyanceFile: Avdhut Kamble 2.pdf22 Jul 2019
Status of ConveyanceFile: Kavita Bendgude.pdf22 Jul 2019
Status of ConveyanceFile: Paurnima Pharande.pdf22 Jul 2019
Status of ConveyanceFile: Potdar B.pdf22 Jul 2019
Status of ConveyanceFile: Anantrao V Patil.pdf22 Jul 2019
Certificates of CA (Form 5)File: FORM NO 5.pdf17 Jul 2019
Status of ConveyanceFile: VIJAY JAGADALE 2.pdf27 Dec 2018
Status of ConveyanceFile: JAMDADE.pdf24 Nov 2018
Status of ConveyanceFile: JAISWAR SU.pdf24 Nov 2018
Status of ConveyanceFile: JOTYA JADHAV.pdf6 Nov 2018
Status of ConveyanceFile: VIJAY JAGADALE.pdf6 Nov 2018
Proforma of Allotment letterFile: Final Draft KARTIK ASHWINI.pdf23 Oct 2017
Layout approvalFile: LAYOUT.pdf9 Oct 2017
Building plan approvalFile: PLAN1.pdf9 Oct 2017
Building plan approvalFile: PLAN2.pdf9 Oct 2017
PAN CardFile: PAN.pdf9 Oct 2017
Copy of the legal title reportFile: SEARCH REPORT.pdf9 Oct 2017
Details of encumbrancesFile: ENCUM.pdf9 Oct 2017

How this compares with Satara

16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep KARTIKIASHWINI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANGAMNAGAR1,100+ in Satara

2 kmKARTIKIASHWINICompleted 15Lapsed / revoked 22Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: ASHWINI BUILDER'S & DEVELOPERS Pvt. Ltd.

ASHWINI BUILDER'S & DEVELOPERS Pvt. Ltd. has 5 registrations on MahaRERA, including SONAASHWINI RESIDENCY and KARTIKIASHWINI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if KARTIKIASHWINI is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KARTIKIASHWINI?

The registered promoter entity is ASHWINI BUILDER'S & DEVELOPERS Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KARTIKIASHWINI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KARTIKIASHWINI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KARTIKIASHWINI?

The professionals named in the filing: Architect: KIRAN MOHITE; Engineer: MANGESH AVINASH LAWAND; Chartered Accountant: P L DAIV ABD ASSOCIATES; Chartered Accountant: MS YOGESH PATIL AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KARTIKIASHWINI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KARTIKIASHWINI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KARTIKIASHWINI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.