Home / Browse projects / Thane, Maharashtra / KARRM GARDENS - 1

Registration lapsed No litigation declared Residential / Group Housing project

KARRM GARDENS - 1

By KARRM INFRASTRUCTURE PRIVATE LIMITED

RG-MH-21277 · RERA P51700008284 · Last updated on MahaRERA portal: 30 Nov 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 71 months past the filed date
  • 28 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2020Possession promised71 months past this date
63 of 110Construction stages doneacross 10 buildings; furthest along: Internal walls, 80%
28Complaints at MahaRERAon this registration
Jump to the 15 documents Report an error

KARRM GARDENS - 1 is a Residential / Group Housing project by KARRM INFRASTRUCTURE PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700008284 on 18 Aug 2017. Possession was promised by 30 Nov 2020 and is now 71 months past that date. The completion date has moved by 18 months from the original filing. 28 complaints are on record with the regulator.

At a glance

Project

  • NameKARRM GARDENS - 1
  • TypeResidential / Group Housing
  • Location
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008284
  • ReraGenie IDRG-MH-21277

Builder

  • NameKARRM INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorKETAL BABULAL PATEL
  • Other registrations4 more →
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

71 months past promisethis monthRegisteredAug 2017First promiseMay 2019Revised toNov 2020

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Aug 2017
  • Promised completion30 Nov 2020
  • Revised completionRevised to 30 Nov 2020 (originally 31 May 2019)
  • Buildings10 building records
  • Documents filed15 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GULABNA80000
CHAPHANA80000
JUINA80000
JAINA80000
MOGRANA80000
NISHIGANDHNA80000
PARIJATNA80000
GULMOHARNA80000
JASWANDNA80000
BAKULNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 30 Nov 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

63 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Internal walls, at 80%.

GULAB77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%
CHAPHA76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
JUI71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
JAI74%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
MOGRA68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
NISHIGANDH63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PARIJAT59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GULMOHAR60%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
JASWAND61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BAKUL59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 30 Nov 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes45%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes5%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes5%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Club HouseYes0%
GardenYes0%
Swimming PoolYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,079 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
KETAN B. PATELMumbai CityMumbai City

Approvals and building plan

Permissible FSI18449.42
Proposed, not sanctioned18,449 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBAI, FORT - 400001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFOUZI AND ASSOCIATES (MR ALIM FOUZI)
EngineerFOUZI AND ASSOCIATES (MR AAMIR)
PartnerRole in project
KARRM INFRASTRUCTURE PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700001827May 2019 → May 2020

Reason as filed by the promoterWe state that due to unavoidable circumstances and that to beyond the control of the promoter we shall be unable to deliver the above mentioned project or on before 31/05/2019 as per registration granted under section 5 of the Real Estate (regulation and Development) Act,2016.further ,adding to that due to lack of liquidity and defaulter allottees we are lagging behind to complete the project or on before 31/05/2019. We expect to deliver the project on or before 31/05/2020

Litigation declared2

CaseCourtStatus
Special Civil Court Suit no 161/2012/0KALYAN CIVIL COURT CIVIL JUDGE S DEVIDENCE
Regular Civil Suit no 88/2014/2014ULHASNAGAR COURTHearing on Exh Five

Complaints filed with MahaRERA28

Case no.ComplainantRespondentFiled
CC006000000171901Tarun GoyalKarrm Infrastructure Private Limited17/12/2019
CC006000000110749ANUDEEP VERMAKARRM INFRASTRUCTURE PRIVATE LIMITED29/08/2019
CC006000000001450DILESH DILIP LADKARAM INFRASTRUCTURE PRIVATE LIMITED25/10/2017
CC006000000151220MRS NETRA RAJEUSH BALLAMWARKARRM INFRASTRUCTURE PRIVATE LIMITED10/10/2019
CC006000000056079Sanket Vijay NIkamKarrm Infrastructure Pvt. Ltd.17/09/2018
CC006000000089591Sanket Vijay NikamKarrm Infrastructure Pvt Ltd11/06/2019
CC006000000100504LALU SALUNAN KOCHERYKARRM INFRASTRUCTURE PRIVATE LIMITED04/09/2019
CC006000000220985Lalu KocheryKarram Infrastructure Private Limited28/04/2022
CC006000000079119Surekha Pappu ShedaleKarrm Infrastructure Pvt. Ltd.01/05/2019
CC006000000089816Amit Govind RedkarKarrm Infrastrcuture Pvt Ltd21/06/2019
CC006000000171720SIDDHESH BELOSEKARRM INFRASTRUCTURE PVT LTD11/12/2019
CC006000000192729Mrs. Minal Prakash YeoleKarrm Infrastructure Private Limited06/03/2020
CC006000000192920VILAS BALIRAM YEOLEKARRM INFRASTRUCTURE PRIVATE LIMITED30/03/2020
CC006000000192969Mr. Shamkant Motiram WaniMr. Ramakant Subhash Jadhav19/03/2020
CC006000000089988Abdulwaheed MirzaKarrm Infrastructure02/12/2019
CC006000000100193Umesh Sambhaji MahajanKARRM INFRASTRUCTURE PRIVATE LIMITED18/07/2019
CC006000000100341ANANT ASHOK PANDIRKARKARRM INFRASTRUCTURE PRIVATE LIMITED27/08/2019
CC006000000100595Bharatbhushan Sudam SurveKarrm Infrastructure Pvt Ltd20/08/2019
CC006000000110702abhishek rajendra visputeKARRM Infrastructure Pvt. Ltd.26/08/2019
CC006000000140994PRATIKSHA PRASHANT KUBALKARRM INFRASTRUCTURE PRIVATE LIMITED22/09/2019
CC006000000194833Uday Anant PatilKarrm Infrastructure Pvt. Ltd06/11/2020
CC006000000195105Sunil Kumar YadavKarrm Infrastructure Pvt. Ltd.01/12/2020
CC006000000195547Kamal Vishindas SawlaniKarrm Infrastructure Private Limited20/02/2021
CC006000000195986AMJAD MUSA SHAIKH & NAZIYA AMJAD SHAIKHKARRM INFRASTRUCTURE PVT LTD17/02/2021
CC006000000196256Association of Allottees Karrm Garden Phase I, AmbarnathKarrmInfrastructure Pvt Ltd04/03/2021
CC006000000196658Varsha Anil KalankeKarrm Infrastructure Private Limited06/04/2021
CC006000000198867Rozine Rauf RajeM/s. Karrm Infrastructure Pvt. Ltd.29/10/2021
CC006000000209592BharatiSarangiKarrm Infrastructure Pvt Ltd10/01/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed15

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 signed_compressed.pdf30 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 signed_0001_compressed.pdf30 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: KARRM GARDENS- PROJECT-1 CC.pdf6 Apr 2018
Building plan approvalFile: Building Plan Layout (IOD) KG 1.pdf29 Jul 2017
Layout approvalFile: KG1 layout.PDF29 Jul 2017
Copy of Layout Approval (in case of layout)File: KG1 layout.PDF29 Jul 2017
Building Plan Approval (IOD)File: Building Plan Layout (IOD) KG 1.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE KG-1.pdf29 Jul 2017
PAN CardFile: PAN CARD KIPL.pdf28 Jul 2017
Copy of the legal title reportFile: Legal title Report KG 1.pdf28 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE KG.pdf28 Jul 2017
Declaration in FORM BFile: Declaration in Form B - Promoter - KG 1.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate KG.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of ENGINEER (FORM 2) KG-1.pdf28 Jul 2017
Proforma of Allotment letterFile: AFS and ALLOTMENT KG.pdf28 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KARRM RESIDENCY SECTOR 3VILLAGE DHASAI TALUKA SHAHPUR840CompletedDec 2014Late, Jul 2017
KARRM RESIDENCY SECTOR 2Village Dhasai Taluka Shahpur District Thane1,020CompletedDec 2014Late, Feb 2016
KARRM RESIDENCY SECTOR 1VILLAGE DHASAI TALUKA SHAHPUR540CompletedDec 2014Late, Feb 2016
KARRM GARDENS PROJECT 2VILLAGE AMBARNATH MC I TALUKA AMBARNATH DISTRICT THANE119CompletedDec 2014Late, Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KARRM GARDENS - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambarnath(M Cl)7,600+ in Thane

2 kmKARRM GARDENS - 1Completed 107Lapsed / revoked 46Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 222 registered projects within 2 km.

Builder: KARRM INFRASTRUCTURE PRIVATE LIMITED

KARRM INFRASTRUCTURE PRIVATE LIMITED has 5 registrations on MahaRERA, including KARRM PANCHTATVA -1 and KARRM PANCHTATVA-3. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that KARRM GARDENS - 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KARRM GARDENS - 1 is delayed beyond 30 Nov 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KARRM GARDENS - 1?

The registered promoter entity is KARRM INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KARRM GARDENS - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KARRM GARDENS - 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KARRM GARDENS - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KARRM GARDENS - 1?

The professionals named in the filing: Architect: FOUZI AND ASSOCIATES (MR ALIM FOUZI); Engineer: FOUZI AND ASSOCIATES (MR AAMIR). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KARRM GARDENS - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KARRM GARDENS - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KARRM GARDENS - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.