Completed No litigation declared Residential / Group Housing project

KANCHAN GEET

By Raghukul Constructions Private Limited

RG-MH-97717 · RERA P50500018334 · Last updated on MahaRERA portal: 7 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

KANCHAN GEET is a Residential / Group Housing project by Raghukul Constructions Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500018334 on 23 Oct 2018. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameKANCHAN GEET
  • TypeResidential / Group Housing
  • Location
    • M A K AZAD ROAD
    • SHIVAJI NAGAR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440010
  • Pincode440010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500018334
  • ReraGenie IDRG-MH-97717

Builder

  • NameRaghukul Constructions Private Limited
  • Entity typeCompany
  • CINU45202MH2009PTC197303
  • GSTIN27AAECR5597C1Z5
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorMrs Maithili Dilip Bharade
  • Other registrations8 more →
  • Completed6 of 9
  • Declared earlier projects14 →

Key dates

this monthRegisteredOct 2018PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Oct 2018
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KANCHAN GEETNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

KANCHAN GEET: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities17

As on 7 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
ELEVATORSYes2%
MECHANICAL STACKER PARKINGYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,338 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4849.18
Proposed, not sanctioned4,580 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT 373 NORTH AMBAZARI ROAD GANDHI NAGAR NAGPUR 440010

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKaran Nashine
EngineerP S Patankar
PartnerRole in project
Raghukul Constructions Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Oct 2021

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Kanchan Geet Form 4.pdf7 Apr 2023
Declaration about Commencement CertificateFile: 4 permit.pdf4 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form no 5 20-21 CA Annual Report.pdf23 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KG Architects Certificate Form 1.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KG Engineer's Certificate Form 2.pdf7 Oct 2021
Form 2AFile: KG Engineer's Certificate for Quality Assurance Form 2A.pdf7 Oct 2021
Certificates of CA (Form 3)File: KG Chartered Accountan's Certificate Form 3.pdf7 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KG Occupancy Certificate.pdf7 Oct 2021
Architect’s Certificate on Completion of Project (Form 4)File: KG Architects Certificate Form 4.pdf7 Oct 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: KG formation of Society.pdf7 Oct 2021
Status of ConveyanceFile: KG Conveyance Deeds.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Kg annual report on statement of account pdf.pdf1 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate (Form 1).pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate (Form 1).pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KG Engineer's Certificate.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KG Engineer's Certificate.pdf14 Aug 2021
Form 2AFile: Quality Assurance (Form 2A).pdf14 Aug 2021
Form 2AFile: Quality Assurance (Form 2A).pdf14 Aug 2021
Certificates of CA (Form 3)File: Chartered Account Certificate ( Form 3).pdf14 Aug 2021
Certificates of CA (Form 3)File: Chartered Account Certificate ( Form 3).pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf28 Mar 2021
Form 2AFile: Quality Assurance.pdf28 Mar 2021
Certificates of CA (Form 3)File: Chartered Account Certificate.pdf28 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: kg_architect_certificate.pdf4 Nov 2020
Form 2AFile: Form- 2A _RERA_Sep20.pdf4 Nov 2020
Form 2AFile: kg_quality_certificate.pdf4 Nov 2020
Certificates of CA (Form 3)File: kanchan_Geet_rera_sep20 (2).pdf4 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_Certificate_Kanchan_Geet.pdf19 Feb 2020
Certificates of CA (Form 3)File: Form-3_ Kanchan_ Geet_.pdf19 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form_5_KG.pdf12 Dec 2019
Certificates of CA (Form 3)File: Form_3_KG.pdf28 Nov 2019
Building plan approvalFile: MYSCAN_20191126_0001 (1).PDF26 Nov 2019
Building plan approvalFile: MYSCAN_20191126_0003.PDF26 Nov 2019
Building plan approvalFile: MYSCAN_20191126_0002 (1).PDF26 Nov 2019
Building plan approvalFile: DOC.pdf26 Nov 2019
Building plan approvalFile: DOC.pdf26 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191126_0001 (1).PDF26 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191126_0003.PDF26 Nov 2019
Building Plan Approval (IOD)File: MYSCAN_20191126_0002 (1).PDF26 Nov 2019
Building Plan Approval (IOD)File: DOC.pdf26 Nov 2019
Building Plan Approval (IOD)File: DOC.pdf26 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: DOC.pdf26 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 KG.pdf26 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KG_Form-2.pdf27 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KG_Architect_Cert.pdf11 Sep 2019
Certificates of CA (Form 3)File: KG_Form_3.pdf9 Sep 2019
Certificates of CA (Form 3)File: KG Rera CA.pdf21 May 2019
Form 2AFile: AK_RERA_FORM-2A.pdf8 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KG_Arc.pdf31 Jan 2019
Certificates of CA (Form 3)File: KG_CA.pdf31 Jan 2019
Building plan approvalFile: 1.pdf15 Oct 2018
Building plan approvalFile: 2.pdf15 Oct 2018
Building plan approvalFile: 3.pdf15 Oct 2018
Building plan approvalFile: 4 permit.pdf15 Oct 2018
Layout approvalFile: WHOMESOEVER_IT_MAY_CONCERN.pdf15 Oct 2018
Copy of Layout Approval (in case of layout)File: WHOMESOEVER_IT_MAY_CONCERN.pdf15 Oct 2018
Building Plan Approval (IOD)File: 1.pdf15 Oct 2018
Building Plan Approval (IOD)File: 2.pdf15 Oct 2018
Building Plan Approval (IOD)File: 3.pdf15 Oct 2018
Building Plan Approval (IOD)File: 4 permit.pdf15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: 4 permit.pdf15 Oct 2018
Proforma of Allotment letterFile: AGREEMENT ALLOTMENT PROFARMA.pdf15 Oct 2018
OtherFile: KANCHAN GEEET SPECIFICATION-converted.pdf3 Oct 2018
Details of encumbrancesFile: Kanchan Geet_Encumbrance_letter.pdf2 Oct 2018
Certificates of CA (Form 3)File: CA_certificate_form_3.pdf29 Sep 2018
PAN CardFile: Raghukul_constructions_pan_card.pdf28 Sep 2018
Declaration in FORM BFile: declaretion_from_b.pdf28 Sep 2018
OtherFile: Agreement_part-1_for_rera.pdf28 Sep 2018
OtherFile: Agreement_part-2_for_rera.pdf28 Sep 2018
OtherFile: general_power_of_attorney_for_rera.pdf28 Sep 2018
Copy of the legal title reportFile: kanchan geet Title Report RERA 2.pdf24 Sep 2018
OtherFile: Civil_Aviation_NOC.pdf24 Sep 2018

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise8 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
DIGVIJAYAP50500047723Shankar Nagar, Nagpur-Nov 2022CompletedSep 2027Mar 2025
Silver ParadiseP50500023454Somalwada, Nagpur-Dec 2019CompletedDec 2026Jan 2024
SRI BALAJIP50500034108SHIVAJI NAGAR NAGPUR, Nagpur-Mar 2022CompletedJan 2026Jun 2024
Amrit SaritaP50500001628Nagpur (M Corp.), Nagpur-Jul 2017CompletedDec 2019Dec 2019
Amrit KalashP50500001929Nagpur (M Corp.), Nagpur-Jul 2017CompletedMar 2019Jan 2019
Silver Meadows ApartmentsPlot No 1 Near Navnath Society Mouza Somalwada Nagpur16-CompletedFeb 2017Late, Mar 2017
Smruti ApartmentsPlot no 59 Dharampeth extension Shivaji Nagar Nagpur24-CompletedOct 2016Late, Nov 2016
Samarpan ApartmentsPlot No 80A B Dharampeth Extension Shivaji Nagar Nagpur10-CompletedOct 2015Late, Dec 2015
Silver HeightsPlot No 2 Near Navnath Society Mouza- Somalwada Nagpur32-CompletedOct 2015Late, Nov 2015
Shree Mohini Raj ApartmentsMouza Lendra Khare Town Dharampeth Nagpur26-CompletedMar 2014Late, Jul 2014
Harikrupa ApartmentsPlot No E 3 Mouza Ambazari Buty Layout Dharampeth Extension Nagpur8-CompletedMar 2014Late, Apr 2014
Krushna Kunj ApartmentsPlot no. 152 Mouza Ambazari Dharampeth Extension Nagpur12-CompletedJan 2014Late, Feb 2014
Silver Glory Apartmentsplot no 3 Near Navnath Society Mouza Somalwada Nagpur28-CompletedOct 2012Late, Dec 2012

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KANCHAN GEET on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAJI NAGAR2,800+ in Nagpur

2 kmKANCHAN GEETCompleted 32Lapsed / revoked 18Other 61Dot size: filed unitsN

Filed coordinates, straight-line distance. 111 registered projects within 2 km.

Builder: Raghukul Constructions Private Limited

Raghukul Constructions Private Limited has 9 registrations on MahaRERA, including Amrit Kalash and Amrit Sarita. Its filings disclose 14 earlier MahaRERA projects: declares 6 of 14 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if KANCHAN GEET is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KANCHAN GEET?

The registered promoter entity is Raghukul Constructions Private Limited, a company as per the filing. Its CIN U45202MH2009PTC197303 and GSTIN 27AAECR5597C1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KANCHAN GEET?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KANCHAN GEET?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KANCHAN GEET?

The professionals named in the filing: Architect: Karan Nashine; Engineer: P S Patankar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KANCHAN GEET?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KANCHAN GEET. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KANCHAN GEET to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.