ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Silver Paradise

Completed No litigation declared Residential / Group Housing project

Silver Paradise

By Raghukul Constructions Private Limited

RG-MH-80909 · RERA P50500023454 · Last updated on MahaRERA portal: 18 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 137 documents Report an error

Silver Paradise is a Residential / Group Housing project by Raghukul Constructions Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500023454 on 16 Dec 2019. The registration is recorded completed; possession was promised by 30 Dec 2026.

At a glance

Project

  • NameSilver Paradise
  • TypeResidential / Group Housing
  • Location
    • 24 Mtr DP Road
    • Somalwada
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440015
  • Pincode440015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500023454
  • ReraGenie IDRG-MH-80909

Builder

  • NameRaghukul Constructions Private Limited
  • Entity typeCompany
  • CINU45202MH2009PTC197303
  • GSTIN27AAECR5597C1Z5
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorMrs Maithili Dilip Bharade
  • Other registrations8 more →
  • Completed6 of 9
  • Declared earlier projects14 →

Key dates

this monthRegisteredDec 2019PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Dec 2019
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed137 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Silver ParadiseNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

Silver Paradise: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities24

As on 18 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Basement ParkingYes1%
CC TV surveillanceYes2%
Compound GateYes2%
ElevatorsYes4%
Fire Escape StaircaseYes1%
StaircaseYes3%
Ground water sumpYes1%
Overhead TankYes2%
Peripheral compound wallYes1%

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered32
Open Space14

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,872 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7778.95
Proposed, not sanctioned7,779 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 373 N A Road Gandhinagar Ambazari Nagpur

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectkaran Nashine
EngineerDeveshkumar singh
EngineerSandeep Shelgaonkar
Chartered AccountantSK Panigrahi & Associates
PartnerRole in project
Raghukul Constructions Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Feb 2024

Documents filed137

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Conveyance _SP.pdf18 Nov 2024
Status of ConveyanceFile: Conveyance _SP.pdf18 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SP Occupancy 18-01-2024.pdf17 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: Silver Paradise Form 4.pdf17 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SP_compressed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SP ARCHITECT .pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sp engineering certificate .pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SP QUALITY .pdf19 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200293825944_For_Asset_Based_Search_17_01_2024_20_24_20_050.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: SP sold unsold.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SILVER PARADISE _compressed.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Silver Paradise Engineering .pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SP ARCHITECT.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SP QUALITY .pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: SP SOLD UNSOLD .pdf17 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200283821372_For_Asset_Based_Search_17_10_2023_19_50_25_183.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - SILVER PARADISE .pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SP ARCHITECT.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SP ENGINEER.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SP QUALITY .pdf20 Jul 2023
CERSAI detailsFile: SP_CERSAI.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: SP SOLD UNSOLD.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SILVER PARADISE _compressed.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SP ARCHITECT'S CERTIFICATE.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SP ENGINEER CERTIFICATE .pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SP ENGINEER'S CERTIFICATE FORM 2 A.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: SP DISCLOSURE OF SOLDBOOKED INVENTORY.pdf20 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200266645322_For_Asset_Based_Search_20_04_2023_18_16_10_951.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Document 20_compressed.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 sp.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sp Architect Certificate.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sp- Enginners certificate.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: sp quality cert rera (1).pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: sp sold unsold inventory.pdf20 Jan 2023
CERSAI detailsFile: cersai silver paradise.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Silver paradise _compressed.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Silver Paradise Architect.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SP-Engineer Certificate .pdf19 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SP-QUALITY.pdf19 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_200250209635_For_Asset_Based_Search_19_10_2022_17_02_16_082.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: SP-SOLD UNSOLD.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SP-CA_compressed.pdf19 Oct 2022
CERSAI detailsFile: CERSAI_SILVER_PARADISE.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SP CA Certifiate_.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Document 67.pdf19 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Document 68 (1)-compressed.pdf19 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Document 69.pdf19 Jul 2022
Disclosure of sold/ booked inventoryFile: Document 68.pdf19 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Document 70_compressed.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects cetificate.pdf6 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers cetificate form 2.pdf6 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: engineers quality assuarance 2A.pdf6 May 2022
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory.pdf6 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf6 May 2022
Disclosure of sold/ booked inventoryFile: sold unsold inventory-converted.pdf9 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate.pdf7 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate.pdf7 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's certificate for Quality assurance.pdf7 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200227347341_For_Asset_Based_Search_04_01_2022_18_30_53_388.pdf4 Jan 2022
CERSAI detailsFile: acknowledgement.pdf4 Jan 2022
Declaration about Commencement CertificateFile: circuler32 SP.pdf9 Dec 2021
Disclosure of sold/ booked inventoryFile: Sold unsold inventry docement.pdf9 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SP Chartered Accountan's Certificate.pdf9 Dec 2021
OtherFile: Format C-Circuler 28.pdf9 Dec 2021
OtherFile: SP Chartered Accountan's Certificate.pdf9 Dec 2021
Declaration about Commencement CertificateFile: circuler32 SP.pdf23 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: from no 5 20-21 CA annual report.pdf23 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SP Architects Certificate Form 1.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SP Engineer's Certificate Form 2.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SP Engineer's Certificate for Quality Assurance Form 2A.pdf7 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SP Chartered Accountan's Certificate.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: sp annual report on statement of account pdf.pdf1 Sep 2021
Building plan approvalFile: Permit_Letter.pdf15 Aug 2021
Building plan approvalFile: BASEMENT PLAN.pdf15 Aug 2021
Building plan approvalFile: GF_FF_PLAN_Sheet2.pdf15 Aug 2021
Building plan approvalFile: SF_TF_PLAN_Sheet3.pdf15 Aug 2021
Building plan approvalFile: Fourth_Nine_PLAN_Sheet4.pdf15 Aug 2021
Building plan approvalFile: Elevation_Sheet_5.pdf15 Aug 2021

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise8 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
DIGVIJAYAP50500047723Shankar Nagar, Nagpur-Nov 2022CompletedSep 2027Mar 2025
SRI BALAJIP50500034108SHIVAJI NAGAR NAGPUR, Nagpur-Mar 2022CompletedJan 2026Jun 2024
KANCHAN GEETP50500018334SHIVAJI NAGAR, Nagpur-Oct 2018CompletedDec 2024Jul 2021
Amrit SaritaP50500001628Nagpur (M Corp.), Nagpur-Jul 2017CompletedDec 2019Dec 2019
Amrit KalashP50500001929Nagpur (M Corp.), Nagpur-Jul 2017CompletedMar 2019Jan 2019
Silver Meadows ApartmentsPlot No 1 Near Navnath Society Mouza Somalwada Nagpur16-CompletedFeb 2017Late, Mar 2017
Smruti ApartmentsPlot no 59 Dharampeth extension Shivaji Nagar Nagpur24-CompletedOct 2016Late, Nov 2016
Samarpan ApartmentsPlot No 80A B Dharampeth Extension Shivaji Nagar Nagpur10-CompletedOct 2015Late, Dec 2015
Silver HeightsPlot No 2 Near Navnath Society Mouza- Somalwada Nagpur32-CompletedOct 2015Late, Nov 2015
Shree Mohini Raj ApartmentsMouza Lendra Khare Town Dharampeth Nagpur26-CompletedMar 2014Late, Jul 2014
Harikrupa ApartmentsPlot No E 3 Mouza Ambazari Buty Layout Dharampeth Extension Nagpur8-CompletedMar 2014Late, Apr 2014
Krushna Kunj ApartmentsPlot no. 152 Mouza Ambazari Dharampeth Extension Nagpur12-CompletedJan 2014Late, Feb 2014
Silver Glory Apartmentsplot no 3 Near Navnath Society Mouza Somalwada Nagpur28-CompletedOct 2012Late, Dec 2012

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Silver Paradise on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Somalwada2,800+ in Nagpur

2 kmSilver ParadiseCompleted 41Lapsed / revoked 19Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 112 registered projects within 2 km.

Builder: Raghukul Constructions Private Limited

Raghukul Constructions Private Limited has 9 registrations on MahaRERA, including Amrit Kalash and Amrit Sarita. Its filings disclose 14 earlier MahaRERA projects: declares 6 of 14 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Silver Paradise is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Silver Paradise?

The registered promoter entity is Raghukul Constructions Private Limited, a company as per the filing. Its CIN U45202MH2009PTC197303 and GSTIN 27AAECR5597C1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Silver Paradise?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Silver Paradise?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Silver Paradise?

The professionals named in the filing: Architect: karan Nashine; Engineer: Deveshkumar singh; Engineer: Sandeep Shelgaonkar; Chartered Accountant: SK Panigrahi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Silver Paradise?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Silver Paradise. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Silver Paradise to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.