Home / Browse projects / Mumbai Suburban, Maharashtra / KANAKIA WALLSTREET WING A

Completed No litigation declared Commercial project

KANAKIA WALLSTREET WING A

By KANAKIA SPACES REALTY PRIVATE LIMITED

RG-MH-07940 · RERA P51800000121 · Last updated on MahaRERA portal: 5 Jul 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Installation of Lifts, 98%
2Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

KANAKIA WALLSTREET WING A is a Commercial project by KANAKIA SPACES REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000121 on 5 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKANAKIA WALLSTREET WING A
  • TypeCommercial
  • Location
    • Andheri
    • Mumbai Suburban
    • 400093
  • Pincode400093
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000121
  • ReraGenie IDRG-MH-07940

Builder

  • NameKANAKIA SPACES REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109MH2019PTC331509
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsRasesh Babubhai Kanakia, Himanshu Babubhai Kanakia
  • Other registrations10 more →
  • Completed11 of 11
  • Declared earlier projects15 →

Key dates

this monthRegisteredJul 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Jul 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KANAKIA WALLSTREET WING ANA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 98%.

KANAKIA WALLSTREET WING A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities16

As on 5 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes73%
Water SupplyYes99%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes91%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes59%
Street LightingYes72%
Community BuildingsYes69%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes66%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes87%
Electrical meter room, sub-station, receiving stationYes89%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
OTHERSYes72%

Parking filed539

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots539
Closed/Covered539

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,586 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI35312.86
Proposed, not sanctioned35,011 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALPATARU ESTATE BUILDING NO 1 JVLR ANDHERI EAST MUMBAI 400093

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Siddhesh Samant
ArchitectMr. Amod Shevde
ArchitectMr.Reza Kabul
EngineerMr. Watve
EngineerMr. Charudatta V. Samant
PartnerRole in project
KANAKIA SPACES REALTY PRIVATE LIMITED-

Litigation declared25

CaseCourtStatus
1514/2011HIGH COURTPENDING FOR HEARING
69/2015HIGH COURTPENDING FOR HEARING
2629/2016HIGH COURTPENDING FOR HEARING
4723/2015HIGH COURTPENDING FOR HEARING
333/2011CITY CIVIL COURT DINDOSHICONSENT TERMS FILED PENDING FOR PARTIES PRESENCE
2480/2013CITY CIVIL COURT DINDOSHIAS PER CONSENT TERMS MATTER DISPOSED OFF
791/2014CITY CIVIL COURT DINDOSHIKEPT FOR FRAMING OF ISSUES
2460/2014CITY CIVIL COURT DINDOSHINOTICE OF MOTION KEPT FOR HEARING
2324/2014CITY CIVIL COURT DINDOSHIKEPT FOR FRAMING OF ISSUES
2137/2015CITY CIVIL COURT DINDOSHIMATTER DISPOSED OFF
1450/2015CITY CIVIL COURT DINDOSHINOTICE OF MOTION PENDING FOR HEARING
2862/2015CITY CIVIL COURT DINDOSHINOTICE OF MOTION FOR HEARING
3335/2015CITY CIVIL COURT DINDOSHINOTICE OF MOTION FOR HEARING
1229/2015CITY CIVIL COURT DINDOSHINOTICE OF MOTION FOR HEARING
145/2016CITY CIVIL COURT DINDOSHINOTICE OF MOTION FILLED FOR SET ASIDE NO REPLY ORDER
3478/2015CITY CIVIL COURT DINDOSHIHEARING ON CONDONATION OF DELAY APPLICATION FILED FOR FILLING WRITTEN STATEMENT
736/2011SMALL CAUSES COURTSTEPS FOR AMENDMENT COMPLIANCE
278/2015SMALL CAUSES COURTSTEPS TO SERVE DEFENDANT
1949/2016CITY CIVIL COURT DINDOSHICHAMBER SUMMONS ALLOWED MATTER KEPT FOR COMPLIANCE DIRECTION
1592/2017CITY CIVIL COURT DINDOSHIKEPT FOR FRAMING ISSUES
2245/2016CITY CIVIL COURT DINDOSHIMATTER DISPOSED OFF
172/2017HIGH COURTMATTER DISMISSED
16528/2017HIGH COURTMATTER DISPOSED OFF
90/2016HIGH COURTPENDING FOR HEARING
60/2015HIGH POWER COMMITTEEPENDING FOR HEARING

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000055861Mr. Udyavar Vittal KamathM/s Kanakia Spaces Realty Private Limited21/08/2018
CC006000000055860Mr. Bellure Ranganath PoonjaM/s Kanakia Spaces Realty Private Limited21/08/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Oct 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: RERA LETTER Wallstreet Compress.pdf5 Jul 2024
Certificates of CA (Form 5)File: wallstreet A.pdf7 Sep 2019
Details of encumbrancesFile: HDFC Wall Street - Index II - 115 Cr.pdf17 Dec 2018
Certificates of CA (Form 3)File: Wallstreet CA Certificate.pdf6 Nov 2018
Certificates of CA (Form 3)File: Wallstreet CA Certificate.pdf6 Nov 2018
Certificates of CA (Form 5)File: Form 5 Wallstreet A RERA Registration no P5180000121.pdf29 Sep 2018
Details of encumbrancesFile: HDFC KSRPL 42 CR.pdf4 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WALL STREET AC 30 06 2018.pdf4 Sep 2018
Certificates of CA (Form 3)File: Wallstreet Wing A CA Certificate.pdf22 Aug 2018
OtherFile: Intimation-Bank.pdf6 Aug 2018
Certificates of Architect (Form 4)File: WALL STREET FORM 4.pdf2 Aug 2018
OtherFile: Full_OC_Kanakia_Wallstreet.pdf23 Jul 2018
Details of encumbrancesFile: Wall Street - 110 -Index-II.pdf20 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Wallstreet.pdf15 Jun 2018
Certificates of CA (Form 3)File: Wallstreet Cost Certificate.pdf11 May 2018
OtherFile: WALLSTREET PART OC 7 02 2018.pdf21 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wall Street Architect Certificate 31 12 2017.pdf20 Feb 2018
Certificates of CA (Form 3)File: Wallstreet RERA Certificate 31 12 2017 A Wing.pdf17 Feb 2018
Building plan approvalFile: Layout and OC Letters.pdf26 Oct 2017
Building plan approvalFile: 2,3,4.pdf26 Oct 2017
Building plan approvalFile: 5,6,7.pdf26 Oct 2017
Building plan approvalFile: 8,9,10.pdf26 Oct 2017
Building plan approvalFile: 11,12,13.pdf26 Oct 2017
Building plan approvalFile: 14,15,16.pdf26 Oct 2017
Building plan approvalFile: 17,18,19.pdf26 Oct 2017
Building plan approvalFile: 20,21,22.pdf26 Oct 2017
Building Plan Approval (IOD)File: Layout and OC Letters.pdf26 Oct 2017
Building Plan Approval (IOD)File: 2,3,4.pdf26 Oct 2017
Building Plan Approval (IOD)File: 5,6,7.pdf26 Oct 2017
Building Plan Approval (IOD)File: 8,9,10.pdf26 Oct 2017
Building Plan Approval (IOD)File: 11,12,13.pdf26 Oct 2017
Building Plan Approval (IOD)File: 14,15,16.pdf26 Oct 2017
Building Plan Approval (IOD)File: 17,18,19.pdf26 Oct 2017
Building Plan Approval (IOD)File: 20,21,22.pdf26 Oct 2017
Certificates of CA (Form 3)File: Wallstreet - CA Certificate.pdf23 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate kanakia wallstreet.pdf29 Sep 2017
Building plan approvalFile: Sheet No 18 AND 19.pdf3 Jul 2017
Building plan approvalFile: Sheet No 2 AND 3.pdf3 Jul 2017
Building plan approvalFile: Sheet No 4 AND 5.pdf3 Jul 2017
Building plan approvalFile: Sheet No 6 AND 7.pdf3 Jul 2017
Building plan approvalFile: Sheet No 8 AND 9.pdf3 Jul 2017
Building plan approvalFile: Sheet No 10 AND 11.pdf3 Jul 2017
Building plan approvalFile: Sheet No 12 AND 13.pdf3 Jul 2017
Building plan approvalFile: Sheet No 14 AND 15.pdf3 Jul 2017
Building plan approvalFile: Sheet No 16 AND 17.pdf3 Jul 2017
Building plan approvalFile: Sheet No 20.pdf3 Jul 2017
Copy of the legal title reportFile: TC Part 1.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 2 AND 3.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 4 AND 5.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 6 AND 7.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 8 AND 9.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 10 AND 11.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 12 AND 13.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 14 AND 15.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 16 AND 17.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 18 AND 19.pdf3 Jul 2017
Building Plan Approval (IOD)File: Sheet No 20.pdf3 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TC Part 2.pdf3 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TC Part 3.pdf3 Jul 2017
Declaration in FORM BFile: FORM B WALLSTREET COMMERCIAL PART 1.pdf29 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WALLSTREET ARCHITECT CERTIFICATE.PDF29 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form B Part II Wallstreet.pdf29 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form B Part III Wallstreet.pdf29 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form B Part IV Wallstreet.pdf29 Jun 2017
Certificates of CA (Form 3)File: WALLSTREET CERTIFICATE.pdf29 Jun 2017
Proforma of Allotment letterFile: Proforma Allotment Letter and Agreement for Sale 29062017.pdf29 Jun 2017
Building plan approvalFile: LAYOUT PLAN.pdf28 Jun 2017
Layout approvalFile: LAYOUT PLAN.pdf28 Jun 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf28 Jun 2017
Building Plan Approval (IOD)File: LAYOUT PLAN.pdf28 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: Wall Street- CC.pdf28 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: WALLSTREET-Engineer Certificate.pdf28 Jun 2017
Details of encumbrancesFile: WALLSTREET INDEX II.pdf22 Jun 2017
PAN CardFile: KANAKIA SPACES REALTY PAN.PDF14 Jun 2017

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise8 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KANAKIA MIAMIPlot No 766 Junction of Causeway Mori Road Mahim W Mumbai 40001647CompletedSep 2018Late, Nov 2019
WALL STREET WING BCHAKALA ANDHERI KURLA ROAD ANDHERI EAST MUMBAI 400093211CompletedDec 2017Mar 2017
KANAKIA AROHADATTAPADA ROAD DONGRI OFF VILLAGE KANHERI NEAR LOHANA MARRIAGE HALL BORIVALI EAST MUMBAI 400066183CompletedDec 2017Mar 2017
ZILLION PHASE 2LBS ROAD JUNCTION CST ROAD BKC ANNEXE MUMBAI 400070107CompletedDec 2016Late, Jan 2017
BOOMERANG PHASE 2MAIN CHANDIVALI FARM ROAD NEAR POWAI ANDHERI EAST MUMBAI 40007256CompletedJun 2015Late, May 2016
ZILLION PHASE 1LBS ROAD JUNCTION CST ROAD BKC ANNEXE MUMBAI 400070100CompletedDec 2014Aug 2014
ATRIUM IINEXT TO 215 ATRIUM BEHIND COURTYARD MARRIOT ANDHERI KURLA ROAD ANDHERI EAST MUMBAI 40009364CompletedDec 2014Late, Jan 2015
SAMARPAN EXCOTICAWESTERN EXPRESS HIGHWAY BORIVALI EAST MUMBAI 400066189CompletedApr 2014Late, Jun 2014
351 ICONWETSERN EXPRESS HIGHWAY ANDHERI EAST MUMBAI 4000699CompletedSep 2013Jul 2013
ANANTABEVERLY PARK MIRA ROAD EAST THANE 40110756CompletedJun 2012Late, Dec 2012
WESTERN EDGE IIWESTERN EXPRESS HIGHWAY BORIVALI EAST MUMBAI 400066152CompletedDec 2011Late, Jul 2012
BOOMERANG PHASE 1MAIN CHANDIVALI FARM ROAD NEAR POWAI ANDHERI EAST MUMBAI 400072159CompletedApr 2010Late, Aug 2010

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KANAKIA WALLSTREET WING A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmKANAKIA WALLSTREET WING Completed 102Lapsed / revoked 56Other 87Dot size: filed unitsN

Filed coordinates, straight-line distance. 245 registered projects within 2 km.

Builder: KANAKIA SPACES REALTY PRIVATE LIMITED

KANAKIA SPACES REALTY PRIVATE LIMITED has 11 registrations on MahaRERA, including KANAKIA MIAMI and KANAKIA WALLSTREET WING A. Its filings disclose 15 earlier MahaRERA projects: declares 5 of 15 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KANAKIA WALLSTREET WING A is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KANAKIA WALLSTREET WING A?

The registered promoter entity is KANAKIA SPACES REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70109MH2019PTC331509 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KANAKIA WALLSTREET WING A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KANAKIA WALLSTREET WING A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KANAKIA WALLSTREET WING A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KANAKIA WALLSTREET WING A?

The professionals named in the filing: Architect: Mr.Siddhesh Samant; Architect: Mr. Amod Shevde; Architect: Mr.Reza Kabul; Engineer: Mr. Watve; Engineer: Mr. Charudatta V. Samant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KANAKIA WALLSTREET WING A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KANAKIA WALLSTREET WING A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KANAKIA WALLSTREET WING A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.