Home / Browse projects / Mumbai Suburban, Maharashtra / ZENNITH

Registered No litigation declared Commercial project

ZENNITH

By APEXBLISS INFRAVENTURES PRIVATE LIMITED

RG-MH-17896 · RERA P51800055713 · Last updated on MahaRERA portal: 19 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 20.00 crore secured on the land, in favour of UCO BANK

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
2 of 10Construction stages donefurthest along: Basement (if any), 90%
95 of 208Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

ZENNITH is a Commercial project by APEXBLISS INFRAVENTURES PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055713 on 15 Apr 2024. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 113 of the 208 units on this registration are recorded sold or booked, and 2 of 10 construction stages are filed complete.

At a glance

Project

  • NameZENNITH
  • TypeCommercial
  • Location
    • MAROL INDUSTRIES
    • ANDHERI (EAST)
    • Andheri
    • Mumbai Suburban
    • 400093
  • Pincode400093
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800055713
  • ReraGenie IDRG-MH-17896

Builder

  • NameAPEXBLISS INFRAVENTURES PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AAWCA8876H1ZQ
  • DirectorsDINESH BHERUMAL BHOJWANI, KAILASH T BANGEJA, RAJESH DOULATRAM RAHEJA

Key dates

this monthRegisteredApr 2024First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed81 files

Current status

54%113 of 208 units booked
18.8%Work done, per cost certificate

Figures as on 19 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ZENNITHNA17160208208

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 10 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

ZENNITH: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes20%
Solid Waste Management And DisposalYes25%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYesNot applicable

Parking filed227

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots227
Closed/Covered227

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,530 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofUCO BANK
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on26 May 2026

Approvals and building plan

Sanctioning authorityMAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Permissible FSI18814.8
Proposed, not sanctioned18,815 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPREMIER CHEMICALS GR FLOOR PLOT NO 38 MIDC CENTRAL ROAD ANDHERI EAST MUMBAI - 400093
Estimated costRs 85.47 cr
Cost incurredRs 16.06 cr
Work done18.79%
BuildingWingEstimatedIncurred
ZENNITHNARs 80.13 crRs 15.62 cr
-NARs 5.34 crRs 43.20 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHOEB MOHAMMED
EngineerASSOCIATED STRUCTURAL ENGINEERS LLP
EngineerVISHAKHA KULKARNI
Chartered AccountantNAINA JAIN
Chartered AccountantSAMARPIT GANESH PINGALE
Chartered AccountantKAMLESH DEEPAK KAMRIA
PartnerRole in project
APEXBLISS INFRAVENTURES PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA01072621651Dec 2026 → Dec 2027

Reason as filed by the promoterDelay in the approval process for project plan approval and the issuance of CC certificate with M.I.D.C and BMC IOD took around 9 months for approval.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf19 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf19 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf19 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf18 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf18 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf18 Aug 2026
Form 2A (FY 2024-2025)File: FORM 2A.pdf3 Jun 2026
Form 2A (FY 2025-2026)File: FORM 2A.pdf3 Jun 2026
Form 5 (FY 2024-2025)File: Form 5.pdf3 Jun 2026
Building plan approvalFile: Building Plan Layout -Highlighted.pdf2 Jun 2026
Form 1File: FORM 1.pdf20 Apr 2026
Form 2File: FORM 2.pdf20 Apr 2026
Form 3File: FORM 3.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY.pdf20 Apr 2026
Form 1File: Form 1.pdf27 Jan 2026
Form 2File: Form 2.pdf27 Jan 2026
Form 3File: Form 3.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY.pdf27 Jan 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf17 Oct 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf17 Oct 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf17 Oct 2025
Form 1File: Form 1 - Architect Certificate.pdf19 Jul 2025
Form 2File: Form 2- Engineer Certificate.pdf19 Jul 2025
Form 3File: Form 3 CA Certificate.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY.pdf19 Jul 2025
Declaration in FORM BFile: Form B - for extension.pdf2 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3.pdf6 May 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UNSOLD - BOOKING INVENTORY.pdf6 May 2025
Declaration about Commencement CertificateFile: DECLERATION ABOUT CC.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Achitect Certificate With DSC.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 24 High Zennith.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY (2).pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate With Sign.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 With Sign.pdf8 Feb 2025
Layout approvalFile: Approved Plan_C-1 C-2 with sign_1-1.pdf18 Jan 2025
Building plan approvalFile: Approved Plan_C-1 C-2 with sign_2-2.pdf18 Jan 2025
Building plan approvalFile: Approved Plan_C-1 C-2 with sign_3-3.pdf18 Jan 2025
Building plan approvalFile: Approved Plan_C-1 C-2 with sign_4-4.pdf18 Jan 2025
Building plan approvalFile: Approved Plan_C-1 C-2 with sign_5-end.pdf18 Jan 2025
Copy of Layout Approval (in case of layout)File: Approved Plan_C-1 C-2 with sign_1-1.pdf18 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Letter.pdf18 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan_C-1 C-2 with sign_2-2.pdf18 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan_C-1 C-2 with sign_3-3.pdf18 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan_C-1 C-2 with sign_4-4.pdf18 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan_C-1 C-2 with sign_5-end.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - UNSOLD INVENTORY (1).pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with sign.pdf19 Jul 2024
Layout approvalFile: Approved Plan (1)-pages-1.pdf4 Apr 2024
Building plan approvalFile: Approved Plan (1)-pages-2.pdf4 Apr 2024
Building plan approvalFile: Approved Plan (1)-pages-3.pdf4 Apr 2024
Copy of Layout Approval (in case of layout)File: Approved Plan (1)-pages-1.pdf4 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan (1)-pages-2.pdf4 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan (1)-pages-3.pdf4 Apr 2024
Other - LegalFile: Agreement.pdf29 Mar 2024
Other - TechnicalFile: ANNEXURE - A ORDER NO 50 OF 2024.pdf29 Mar 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE- Apexbliss FINAL.pdf11 Mar 2024
Proforma of Allotment letterFile: Allotment letter (1).pdf11 Mar 2024
Deviation Report with respect to Allotment letterFile: NO DEVIATION IN ALLOTMENT LETTER.pdf11 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT FOR AFS.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Form 1.pdf8 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form -2.pdf8 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant Certificate _Form 3.pdf8 Mar 2024
Building plan approvalFile: CC Letter.pdf7 Mar 2024
PAN CardFile: PAN CARD_APEXBLISS.pdf7 Mar 2024
Copy of the legal title reportFile: title and search.pdf7 Mar 2024
Details of encumbrances concerned to FinanceFile: ENC TO FINANCE_merged.pdf7 Mar 2024
Details of encumbrances concerned to LegalFile: ENC TO FINANCE_merged.pdf7 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: CC Letter.pdf7 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Letter.pdf7 Mar 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf7 Mar 2024
Declaration in FORM BFile: 100 Legal Paper From B Declaration.pdf7 Mar 2024
CERSAI detailsFile: CERSAI.pdf7 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: COMPANY A_merged.pdf7 Mar 2024

How this compares with Mumbai Suburban

54%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ZENNITH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI (EAST)6,700+ in Mumbai Suburban

2 kmZENNITHCompleted 116Lapsed / revoked 57Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 258 registered projects within 2 km.

Builder: APEXBLISS INFRAVENTURES PRIVATE LIMITED

APEXBLISS INFRAVENTURES PRIVATE LIMITED has 1 registration on MahaRERA, including ZENNITH. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ZENNITH is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ZENNITH?

The registered promoter entity is APEXBLISS INFRAVENTURES PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAWCA8876H1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ZENNITH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ZENNITH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ZENNITH?

The professionals named in the filing: Architect: SHOEB MOHAMMED; Engineer: ASSOCIATED STRUCTURAL ENGINEERS LLP; Engineer: VISHAKHA KULKARNI; Chartered Accountant: NAINA JAIN; Chartered Accountant: SAMARPIT GANESH PINGALE; Chartered Accountant: KAMLESH DEEPAK KAMRIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ZENNITH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ZENNITH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ZENNITH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.