Red flags

  • 11 complaints at MahaRERA
  • Completion date moved by 27 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 98%
11Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

KANAKIA PARIS is a Residential / Group Housing project by KANAKIA SPACES REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000122 on 5 Jul 2017. The registration is recorded completed; possession was promised by 28 Dec 2021. The completion date has moved by 27 months from the original filing. 11 complaints are on record with the regulator.

At a glance

Project

  • NameKANAKIA PARIS
  • TypeResidential / Group Housing
  • Location
    • Andheri
    • Mumbai Suburban
    • 400052
  • Pincode400052
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000122
  • ReraGenie IDRG-MH-07961

Builder

  • NameKANAKIA SPACES REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109MH2019PTC331509
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsRasesh Babubhai Kanakia, Himanshu Babubhai Kanakia
  • Other registrations10 more →
  • Completed11 of 11
  • Declared earlier projects15 →

Key dates

this monthRegisteredJul 2017First promiseSep 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Jul 2017
  • Promised completion28 Dec 2021
  • Revised completionRevised to 28 Dec 2021 (originally 30 Sep 2019)
  • Buildings1 building record
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KANAKIA PARISNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 98%.

KANAKIA PARIS: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises91%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 28 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes86%
Open ParkingNoNot applicable
OTHERSYes90%

Parking filed576

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots576
Closed/Covered576

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,359 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
ACE HOUSING & CONSTRUCTION LIMITEDAndheriMumbai Suburban
RAJAT PATELAndheriMumbai Suburban
DHRUV ENTERPRISESAndheriMumbai Suburban
SHREE GAJRAJ HOUSING NIRMAN PVT LTDABCD-400001Mumbai City
METROPOLITAN LIFESPACE REAL ESTATEDEVELOPERSPVTLTD-Mumbai City

Approvals and building plan

Permissible FSI48269.44
Proposed, not sanctioned47,747 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALPATARU ESTATE BUILDING NO 1 JOGESHWARI VIKHROLI LINK ROAD ANDHERI EAST MUMBAI 400093

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Shekhar Patki
ArchitectMr. Sameer V. Kulkarni
EngineerMr. Gokani
EngineerMr. Charudatta V. Samant
PartnerRole in project
KANAKIA SPACES REALTY PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800002488Sep 2019 → Jun 2021

Reason as filed by the promoterThe Real Estate Project namely “Kanakia Paris” was assigned Registration No. P51800000122 and Authority has issued Certificate of Registration dated 05.07.2017. The Registration is valid for a period commencing from 05/07/2017 and ending with 30/09/2019. The Construction of the Project is duly completed and we have started handing over possession of the flats to the Allottees. We have received Occupation Certificate for the Real Estate Project save and except 4 (Four) flats in Tower G on 3.04.2019. Copy of the Occupation Certificate is already uploaded on the MahaRera website. The occupation c

Complaints filed with MahaRERA11

Case no.ComplainantRespondentFiled
CC006000000057782Abhishek Kotharikanakia spaces realty23/01/2019
CC006000000110693Salman Shahkanakia Spaces Realty Private Limited11/09/2019
CC006000000161349Kanakia Spaces Realty Pvt LtdKaushal Kumar Modi01/02/2020
CC006000000161430Kanakia Spaces Realty Pvt LtdGautam Nand Allahabadia and 2 ors01/02/2020
CC006000000161431Kanakia Spaces Realty Pvt LtdSunil Sheth and Anr01/02/2020
CC006000000195779Kanakia Spaces Realty Pvt LtdAjay Uttamchandani27/01/2021
CC006000000171717Abhishek RegeKanakia Spaces Realty Private Limited18/12/2019
CC006000000194185Yogesh KodkaniKanakia Space Realty Private Limited29/09/2020
CC006000000197675PDA Trade Fairs Pvt LtdKanakia Spaces Realty Pvt Ltd20/07/2021
CC006000000292627Arti Sunil ShethKanakia Spaces Realty Private Limited20/09/2022
CC006000000303652Amrit RajDhruv enterprises12/12/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Aug 2021

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Letter to RERA Paris Sybmission of lease Deed Draft compressed.pdf28 Jun 2024
Status of ConveyanceFile: mail asking docs for execution of paris conveyance.pdf10 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Paris Society Certificate.pdf3 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate 24 August 2018.pdf9 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate 3 April 2019.pdf9 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate 9 March 2021.pdf9 Aug 2021
OtherFile: Declaration Kanakia Paris.pdf28 Jun 2021
OtherFile: Occupation Certificate.pdf25 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Paris Quality Assurance Certificate.pdf19 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Paris.pdf13 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ZEN SEP 30092019.pdf8 Nov 2019
Certificates of CA (Form 5)File: paris.pdf7 Sep 2019
Certificates of CA (Form 3)File: CA Cert Paris 30062019.pdf26 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Paris Arch Certificate 300619.pdf8 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Paris Rera letter 31March2019.pdf7 Aug 2019
Certificates of CA (Form 3)File: Paris CA Certificate.pdf5 Jul 2019
Details of encumbrancesFile: KSRPL-HDFC Limited - 160 Cr.pdf13 May 2019
Details of encumbrancesFile: KSRPL-RBL- Index II.pdf13 May 2019
Certificates of Architect (Form 4)File: FORM 4 A TO F WING.pdf11 Apr 2019
OtherFile: LETTER WITH ARCHITECT CERTIFICATE.pdf11 Apr 2019
OtherFile: Paris part OC EF20 G19 DATE 0342019.pdf5 Apr 2019
Certificates of CA (Form 3)File: Kanakia Paris Certificate-23-01-2019.pdf29 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archietecture certificate Paris 31-12-18.pdf15 Jan 2019
Certificates of CA (Form 3)File: Kanakia Paris Certificate.pdf6 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Paris architects certificate 30-09-2018.pdf23 Oct 2018
Certificates of CA (Form 5)File: Paris Annual Rera Certificate FY17-18.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PARIS AC 30 06 2018.pdf4 Sep 2018
OtherFile: PARIS PART OC DATE 24 08 2018.pdf4 Sep 2018
Certificates of CA (Form 3)File: Paris CA Certificate.pdf22 Aug 2018
Building plan approvalFile: PARIS AMENDED IOD 19 06 2018.pdf21 Aug 2018
Building Plan Approval (IOD)File: PARIS AMENDED IOD 19 06 2018.pdf21 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Paris.pdf15 Jun 2018
Certificates of CA (Form 3)File: Paris Cost Certificate.pdf11 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Paris Architect Cetificate 31 12 2017.pdf20 Feb 2018
Certificates of CA (Form 3)File: Paris Rera Certificate 31 Dec 2017.pdf17 Feb 2018
Certificates of CA (Form 3)File: Paris - CA Certificate.pdf23 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Paris Project.pdf29 Sep 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PARIS- Architect Certificate.pdf4 Jul 2017
Declaration in FORM BFile: FORM B PARIS PART 1.pdf30 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PARIS- Architect Certificate.pdf30 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM B PARIS PART 2.pdf30 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM B PARIS PART 3.pdf30 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PARIS - Engineer Certificate.pdf30 Jun 2017
Certificates of CA (Form 3)File: PARIS CERTIFICATE.pdf30 Jun 2017
Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER AND AGREEMENT FOR SALE.pdf30 Jun 2017
Building plan approvalFile: 24-03-2017 Lay-out Plan.pdf26 Jun 2017
Building Plan Approval (IOD)File: 24-03-2017 Lay-out Plan.pdf26 Jun 2017
Details of encumbrancesFile: BKC PARIS INDEX II.pdf22 Jun 2017
Layout approvalFile: 24-03-2017 Lay-out Plan.pdf21 Jun 2017
Copy of the legal title reportFile: TCand high court order.pdf21 Jun 2017
Copy of Layout Approval (in case of layout)File: 24-03-2017 Lay-out Plan.pdf21 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: Paris CC.pdf21 Jun 2017
PAN CardFile: KANAKIA SPACES REALTY PAN.PDF14 Jun 2017

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise8 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KANAKIA MIAMIPlot No 766 Junction of Causeway Mori Road Mahim W Mumbai 40001647CompletedSep 2018Late, Nov 2019
WALL STREET WING BCHAKALA ANDHERI KURLA ROAD ANDHERI EAST MUMBAI 400093211CompletedDec 2017Mar 2017
KANAKIA AROHADATTAPADA ROAD DONGRI OFF VILLAGE KANHERI NEAR LOHANA MARRIAGE HALL BORIVALI EAST MUMBAI 400066183CompletedDec 2017Mar 2017
ZILLION PHASE 2LBS ROAD JUNCTION CST ROAD BKC ANNEXE MUMBAI 400070107CompletedDec 2016Late, Jan 2017
BOOMERANG PHASE 2MAIN CHANDIVALI FARM ROAD NEAR POWAI ANDHERI EAST MUMBAI 40007256CompletedJun 2015Late, May 2016
ZILLION PHASE 1LBS ROAD JUNCTION CST ROAD BKC ANNEXE MUMBAI 400070100CompletedDec 2014Aug 2014
ATRIUM IINEXT TO 215 ATRIUM BEHIND COURTYARD MARRIOT ANDHERI KURLA ROAD ANDHERI EAST MUMBAI 40009364CompletedDec 2014Late, Jan 2015
SAMARPAN EXCOTICAWESTERN EXPRESS HIGHWAY BORIVALI EAST MUMBAI 400066189CompletedApr 2014Late, Jun 2014
351 ICONWETSERN EXPRESS HIGHWAY ANDHERI EAST MUMBAI 4000699CompletedSep 2013Jul 2013
ANANTABEVERLY PARK MIRA ROAD EAST THANE 40110756CompletedJun 2012Late, Dec 2012
WESTERN EDGE IIWESTERN EXPRESS HIGHWAY BORIVALI EAST MUMBAI 400066152CompletedDec 2011Late, Jul 2012
BOOMERANG PHASE 1MAIN CHANDIVALI FARM ROAD NEAR POWAI ANDHERI EAST MUMBAI 400072159CompletedApr 2010Late, Aug 2010

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 27 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KANAKIA PARIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmKANAKIA PARISCompleted 133Lapsed / revoked 74Other 158Dot size: filed unitsN

Filed coordinates, straight-line distance. 365 registered projects within 2 km.

Builder: KANAKIA SPACES REALTY PRIVATE LIMITED

KANAKIA SPACES REALTY PRIVATE LIMITED has 11 registrations on MahaRERA, including KANAKIA MIAMI and KANAKIA WALLSTREET WING A. Its filings disclose 15 earlier MahaRERA projects: declares 5 of 15 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KANAKIA PARIS is delayed beyond 28 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KANAKIA PARIS?

The registered promoter entity is KANAKIA SPACES REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U70109MH2019PTC331509 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KANAKIA PARIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KANAKIA PARIS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KANAKIA PARIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KANAKIA PARIS?

The professionals named in the filing: Architect: Mr.Shekhar Patki; Architect: Mr. Sameer V. Kulkarni; Engineer: Mr. Gokani; Engineer: Mr. Charudatta V. Samant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KANAKIA PARIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KANAKIA PARIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KANAKIA PARIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.