Home / Browse projects / Mumbai Suburban, Maharashtra / Kamla Jainson Wing C
Kamla Jainson Wing C
By Kamla Homes & Infrastructure
RG-MH-06515 · RERA P51800052711 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kamla Jainson Wing C is a Residential / Group Housing project by Kamla Homes & Infrastructure in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052711 on 22 Sep 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 18 of the 25 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameKamla Jainson Wing C
- TypeResidential / Group Housing
- Location
- Jakaria Road
- Malad West
- Malad
- Borivali
- Mumbai Suburban
- 400064
- Pincode400064
- RERA no.P51800052711
- ReraGenie IDRG-MH-06515
Builder
- NameKamla Homes & Infrastructure
- Entity typePartnership
- PartnersAnkur Shah, Arvind Shah, Jitendra Shah, Pravin Jain, Rajeshkumar Kothari
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Sep 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed68 files
Current status
Figures as on 13 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Kamla Jainson Wing C | NA | 16 | 12 | 25 | 0 | 25 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Kamla Jainson Wing C: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed174
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Kamla Jainson Wing C | NA | Rs 24.28 cr | Rs 13.65 cr |
| - | NA | Rs 24.28 cr | Rs 13.65 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rasik P. Hingoo Associates |
| Architect | D4 Architects |
| Engineer | Paras Consultants |
| Engineer | kirit gosalia |
| Chartered Accountant | S.D. Jain & Co. |
| Chartered Accountant | S.D JAIN & CO |
| Partner | Role in project |
|---|---|
| Kamla Homes & Infrastructure | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to delay in obtaining required permission, the occupation certificate got delayed, however the construction of the proposed building is completed in respect and ready to hand over possession but only occupation certificate is pending. We would like to request you to grant us further extension for one year
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Jainson Wing C.pdf | 13 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Jainson Wing C.pdf | 13 Jul 2026 |
| Withdrawal Update Form 3File: KAMLA JAINSON WING C FORM 3.pdf | 13 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Jainson Wing C.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Jainson Wing C.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: KAMLA JAINSON WING C FORM 3.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Jainson Wing C.pdf | 20 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Jainson Wing C.pdf | 20 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 - JAINSON WING C.pdf | 20 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Jainson C Wing.pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Jainson C Wing.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Jainson.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Jainson.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: KAMLA JAINSON WING C FORM 3 (1).pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: KAMLA JAINSON WING C FORM 3 (1).pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 - Jainson.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - Jainson.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: JAINSON FORM 3.pdf | 11 Nov 2025 |
| Form 5 (FY 2024-2025)File: JAINSON FORM 5.pdf | 12 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jainson C Wing (1).pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jainson C wing.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Jainson C Wing.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Jainson C wing.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Jainson C Wing.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Jainson C Wing.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jainson.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KAMLA JAIN SON WING- Form 3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jainson.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JAINSON form 3.pdf | 13 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: KAMLA JAINSON.pdf | 13 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jainson Form 1.pdf | 8 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jainson -Form 2.pdf | 8 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A -JAINSON WING C.pdf | 2 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Jainson WingC.pdf | 11 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-JAINSON WING C.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-JAINSON WING C.pdf | 10 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY DETAILS.pdf | 27 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-KAMLA JAINSON WING-C.pdf | 16 Aug 2023 |
| Building plan approvalFile: KAMLA JAINSON IOA 04072023.pdf | 12 Aug 2023 |
| Layout approvalFile: 1 highlighted.pdf | 12 Aug 2023 |
| Layout approvalFile: 2.pdf | 12 Aug 2023 |
| Layout approvalFile: 3.pdf | 12 Aug 2023 |
| Layout approvalFile: 4.pdf | 12 Aug 2023 |
| Layout approvalFile: 5.pdf | 12 Aug 2023 |
| Layout approvalFile: 6.pdf | 12 Aug 2023 |
| Layout approvalFile: 7.pdf | 12 Aug 2023 |
| PAN CardFile: KHI PAN.pdf | 12 Aug 2023 |
| Copy of the legal title reportFile: Legal Title Report-Jainson Wing C for RERA.pdf | 12 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrance self declaration.pdf | 12 Aug 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrance self declaration.pdf | 12 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 1 highlighted.pdf | 12 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 2.pdf | 12 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 3.pdf | 12 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 4.pdf | 12 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 5.pdf | 12 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 6.pdf | 12 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 7.pdf | 12 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: KAMLA JAINSON IOA 04072023.pdf | 12 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Full CC- Wing C.pdf | 12 Aug 2023 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 12 Aug 2023 |
| Declaration in FORM BFile: Form-B.pdf | 12 Aug 2023 |
| CERSAI detailsFile: CERSAI declaration.pdf | 12 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A DOI.pdf | 12 Aug 2023 |
| Proforma of Agreement for saleFile: Agreement_for_Sale_kamla[1].pdf | 12 Aug 2023 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 12 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT FORMAT A- Kamla Jainson Wing C.pdf | 12 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation letter on Allotment.pdf | 12 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation letter on Agreement.pdf | 12 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Kamla Jainson Wing C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Malad West6,700+ in Mumbai Suburban
Ruparel Stardom
AMI MODISPACES LLP
Chandak Treesourus
CHANDAK REALTORS PRIVATE LIMITED
ANCHORPOINT AVIARA
YUKTI INFRAPROJECTS LLP
AURIS ILARIA TOWER A
TRANSCON-SHETH CREATORS PRIVATE LIMITED
ADHRIT
MUNDARA DEVELOPERS
IRENE WING B PHASE 1
Sheth Creators and Sunvision Private Limit
See every Mumbai Suburban project, with the district possession charts
Builder: Kamla Homes & Infrastructure
Kamla Homes & Infrastructure has 1 registration on MahaRERA, including Kamla Jainson Wing C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Kamla Jainson Wing C is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kamla Jainson Wing C?
The registered promoter entity is Kamla Homes & Infrastructure, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kamla Jainson Wing C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Kamla Jainson Wing C?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kamla Jainson Wing C?
The professionals named in the filing: Architect: Rasik P. Hingoo Associates; Architect: D4 Architects; Engineer: Paras Consultants; Engineer: kirit gosalia; Chartered Accountant: S.D. Jain & Co.; Chartered Accountant: S.D JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kamla Jainson Wing C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback