ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Kalpataru Exquisite - Wing 4

Completed Litigation declared Residential / Group Housing project

Kalpataru Exquisite - Wing 4

By Kalpataru Retail Ventures Private Limited

RG-MH-14700 · RERA P52100023268 · Last updated on MahaRERA portal: 30 Jul 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Rs 300.00 crore secured on the land, in favour of IndusInd Bank Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Staircases, 98%
2 of 134Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Kalpataru Exquisite - Wing 4 is a Residential / Group Housing project by Kalpataru Retail Ventures Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100023268 on 9 Dec 2019. The registration is recorded completed; possession was promised by 30 Dec 2025. 132 of the 134 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameKalpataru Exquisite - Wing 4
  • TypeResidential / Group Housing
  • Location
    • Mont Vert Tropez
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100023268
  • ReraGenie IDRG-MH-14700

Builder

  • NameKalpataru Retail Ventures Private Limited
  • Entity typeCompany
  • CINU45202MH2000PTC129761
  • Other registrations6 more →
  • Completed7 of 7
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2019PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Dec 2019
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

99%132 of 134 units booked

Figures as on 30 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 4 - ElitaNA27271340134

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

Wing 4 - Elita: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises77%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.62%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.38%

Progress on shared amenities17

As on 30 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes88%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes94%
Street LightingYes75%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes91%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes0%
Club House other Recreational Areas and Swimming PoolYes100%
3 Nos of Common PodiumYes69%

Parking filed594

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots594
Closed/Covered594

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area865 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofIndusInd Bank Limited
Secured amountRs 300.00 crore
CERSAI search filedYes
Declared on10 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI10500.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Maneckji Wadia Bldg Nanik Motwani Marg Fort Mumbai 400023

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMINAJ MAGDUM
ArchitectAashay Bagwe
ArchitectSwapnil Potdar
EngineerVishal Nagle
EngineerSachin Hirukude
Chartered AccountantC R Mohnot & Co (Form 3)
Chartered AccountantC R Mohnot & Co ( CA Certificate-Form 3)
Chartered AccountantKhimji Kunverji & Co (Statutory Auditor - Form 5)
PartnerRole in project
Kalpataru Retail Ventures Private Limited-

Litigation declared2

CaseCourtStatus
1292/2014Civil Judge Senior Division PunePending
1180/2019Civil Judge Senior Division PunePending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Building 4 Elita Occupancy Certificate.pdf30 Jul 2025
Occupational CertificateFile: FIRST PAGE.pdf30 Jul 2025
Occupational CertificateFile: 2-5.pdf30 Jul 2025
Occupational CertificateFile: 6-9.pdf30 Jul 2025
Form 1File: kalpataru exquisite .pdf22 Jul 2025
Form 2File: Exquisite Wing 4 EC.pdf22 Jul 2025
Form 3File: CA Certificate_Kalpataru Exquisite W 4 Jun-25.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Exquisite- Wing 4.pdf22 Jul 2025
Form 2A (FY 2024-2025)File: Exquisite Tower 4.pdf7 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KL Exquisite 4.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Exquisite_EC.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3_Exquisite_March 25.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Exquisite Wing 4.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalpataru Exquisite.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Exquisite Wing - 4.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Exquisite Wing 4.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Exquisite 4.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Exquisite 4.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalpataru Exquisite_UPLOAD.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Exquisite 4.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Exquisite Wing 4.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Exqusite 4.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Exquisite-Wing 4.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Exquisite-Wing 4.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalpataru Exquisite Wing 4 June24.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Exquisite Wing 4.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: Exquisite 4.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K Exquisite Wing 4 Mar-24.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Exquisite 4.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Exqusite 4.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: K Exquisite Wing 4.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Exquisite 4.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Exqusite Wing 4.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA certificate Exqusite 4 Dec-23.pdf20 Jan 2024
Proforma of Agreement for saleFile: Exquisite Final 4.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: K Exquisite Wing 4.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Exquisite 4.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Exquisite 4.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Exquisite Tower 4_Sep23.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Exquisite Wing 4.pdf29 Sep 2023
Disclosure of sold/ booked inventoryFile: K Exquisite Bldg 4.pdf6 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Exquisite 4.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Exquisite 4.pdf26 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate K Exquisite Wing 4 June'23.pdf26 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Exquisite 4.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Exquisite 4.pdf22 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cer Kalpataru Exquisite Wing 4.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cer Kalpataru Exquisite wing-4.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: K Exquisite WING 4.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Exquisite Wing 4.pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kalpataru Exquisite Wing 4.pdf30 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Exquisite 4.pdf21 Apr 2022
Declaration about Commencement CertificateFile: Exquisite wing 4.pdf8 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Exq 4.pdf8 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_KRVPL_Wing 4_F_compressed.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Exq Wing 4.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Exq wing 4.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Exquisite wing 4.pdf9 Feb 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Exquisite wing 4.pdf29 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_KRVPL_Wing 4.pdf9 Oct 2020
Details of encumbrancesFile: Exq-4.pdf16 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Dec 2019.pdf16 Jan 2020
PAN CardFile: kalpataru retail venture pvt ltd.pdf3 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf14 Nov 2019
Layout approvalFile: Exquisite Wing 4 Layout Comp.pdf11 Nov 2019
Building plan approvalFile: IOD 19-06-2018_compressed.pdf11 Nov 2019
Copy of the legal title reportFile: TC2.pdf11 Nov 2019
Copy of the legal title reportFile: TC1.pdf11 Nov 2019
Details of encumbrancesFile: EC16102019.pdf11 Nov 2019
Copy of Layout Approval (in case of layout)File: Exquisite Wing 4 Layout Comp.pdf11 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: IOD 19-06-2018_compressed.pdf11 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Exquisite.pdf11 Nov 2019
Proforma of Allotment letterFile: AFS Wing 4.pdf11 Nov 2019
Proforma of Allotment letterFile: LOI - Kalpataru Exquiste Wing 4.pdf11 Nov 2019
Declaration in FORM BFile: B Form.pdf6 Nov 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Kalpataru Harmony253-1 and 247-6-1 Kalpataru Harmony Village Wakad Taluka Mulshi Pune479CompletedSep 2016Late, Nov 2016

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpataru Exquisite - Wing 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmKalpataru Exquisite - WiCompleted 132Lapsed / revoked 46Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 255 registered projects within 2 km.

Builder: Kalpataru Retail Ventures Private Limited

Kalpataru Retail Ventures Private Limited has 7 registrations on MahaRERA, including Kalpataru Exquisite - Wing 1 and Kalpataru Exquisite - Wing 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Kalpataru Exquisite - Wing 4 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru Exquisite - Wing 4?

The registered promoter entity is Kalpataru Retail Ventures Private Limited, a company as per the filing. Its CIN U45202MH2000PTC129761 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru Exquisite - Wing 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kalpataru Exquisite - Wing 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru Exquisite - Wing 4?

The professionals named in the filing: Architect: MINAJ MAGDUM; Architect: Aashay Bagwe; Architect: Swapnil Potdar; Engineer: Vishal Nagle; Engineer: Sachin Hirukude; Chartered Accountant: C R Mohnot & Co (Form 3). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru Exquisite - Wing 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru Exquisite - Wing 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru Exquisite - Wing 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.