Home / Browse projects / Thane, Maharashtra / Kakad Paradise Phase 2

Completed No litigation declared Others project

Kakad Paradise Phase 2

By Kakad Housing Corporation

RG-MH-09249 · RERA P51700006750 · Last updated on MahaRERA portal: 24 May 2024

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
4Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Kakad Paradise Phase 2 is a Others project by Kakad Housing Corporation in Thane, Maharashtra, registered with MahaRERA as P51700006750 on 16 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2024. 4 complaints are on record with the regulator.

At a glance

Project

  • NameKakad Paradise Phase 2
  • TypeOthers
  • Location
    • Off Western Express Highway
    • Penkarpada
    • Mahajanwadi
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700006750
  • ReraGenie IDRG-MH-09249

Builder

  • NameKakad Housing Corporation
  • Entity typePartnership
  • PartnersMalav Kakad, Kunal Kakad
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017PromisedJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Aug 2017
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing CNA260000
Wing DNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Wing C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed86

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots86
Closed/Covered86
BuildingClosed/CoveredTotal
Wing C4343
Wing D4343

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,907 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11905.0
Proposed, not sanctioned11,905 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNew Marine Lines, Mumbai

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjay Mane
EngineerSurendra Velji Patel
PartnerRole in project
Kakad Housing Corporation-

Litigation declared1

CaseCourtStatus
181/2008Thane City Civil CourtPending

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000000302Sherbahadur SinghKunal Kakad30/08/2017
CC006000000110837SANJAY C SOPARKARkakad16/10/2019
CC006000000089924Rajkumari singhKakad houding corporation08/07/2019
CC006000000480120Ramchandra Vishwanath SinghKAKAD HOUSING CORPORATION06/05/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 May 2024

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC of Kakad Paradise Phase-2.pdf24 May 2024
Certificates of CA (Form 3)File: FORM 3 (1)_compressed.pdf11 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 KHC.pdf11 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 KP2.pdf28 Sep 2023
Declaration about Commencement CertificateFile: CC Declaration Upto 10th.pdf27 Sep 2023
Declaration about Commencement CertificateFile: CC Declaration Upto 18th.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf27 Sep 2023
Disclosure of sold/ booked inventoryFile: Booking Details as 25092023.pdf27 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC KP2.pdf26 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf4 Apr 2023
Certificates of CA (Form 3)File: Form 3 KHC.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2.pdf18 Mar 2023
Declaration about Commencement CertificateFile: CC of KP2.pdf17 Mar 2023
Disclosure of sold/ booked inventoryFile: C WING Booking Details.pdf17 Mar 2023
Disclosure of sold/ booked inventoryFile: D WING Booking Details.pdf17 Mar 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Declaration KP2.pdf16 Mar 2023
Details of encumbrances concerned to LegalFile: Encumbrance Declaration KP2.pdf16 Mar 2023
CERSAI detailsFile: Cersai Challan-Satisfaction.pdf16 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest KK RERA.pdf16 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest MK RERA.pdf16 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: CD Society.pdf16 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account RERA KHC.pdf16 Mar 2023
Foreclosure of the ProjectFile: No Dues Certificate (4).pdf16 Mar 2023
Deviation Report with respect to Allotment letterFile: Allotment Deviation.pdf16 Mar 2023
Deviation Report with respect to model copy of AgreementFile: AFS Deviation.pdf16 Mar 2023
Proforma of Agreement for saleFile: Draft AFS KP2.pdf18 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed Form 5 of KHC.pdf17 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 KHC 20-21.pdf31 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Proposed work of Kakad Paradise Ph-II dt 1st Aug 2020.pdf11 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Proposed work of Kakad Paradise Ph II dt 3rd Aug 2021.pdf11 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - KHC 30092020.pdf19 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1-KHC Form-5 certificate08019.pdf15 Nov 2019
Certificates of CA (Form 5)File: KHC FORM 5 for 2017-18.pdf15 Nov 2018
Proforma of Allotment letterFile: Draft Agreement of Phase-II (For Investors).pdf13 Apr 2018
Details of encumbrancesFile: LIC Encumbrance Certificate.pdf8 Jan 2018
Proforma of Allotment letterFile: REVISED DRAFT AFS UPLOADED .pdf28 Aug 2017
Proforma of Allotment letterFile: RERA AFS Kakad Paradise Phase 2 Uploaded.pdf22 Aug 2017
Details of encumbrancesFile: Encumbrance Certificate - KHC.pdf28 Jul 2017
Declaration in FORM BFile: KHC Form B Declaration.pdf28 Jul 2017
Certificates of CA (Form 3)File: CA Certificate - KHC.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Cert Combo.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate-KP.pdf27 Jul 2017
Proforma of Allotment letterFile: KHC Decaration for NO AGREEMENT AND ALLOTMENT.pdf27 Jul 2017
Layout approvalFile: CC page 1 2 .pdf5 Jul 2017
Layout approvalFile: CC page 3 4 5 .pdf5 Jul 2017
Building plan approvalFile: Location Clearance Pg 1.pdf5 Jul 2017
Building plan approvalFile: Location Clearance Pg 2.pdf5 Jul 2017
Building plan approvalFile: Location Clearance Pg 3.pdf5 Jul 2017
Copy of Layout Approval (in case of layout)File: CC page 1 2 .pdf5 Jul 2017
Copy of Layout Approval (in case of layout)File: CC page 3 4 5 .pdf5 Jul 2017
Building Plan Approval (IOD)File: Location Clearance Pg 1.pdf5 Jul 2017
Building Plan Approval (IOD)File: Location Clearance Pg 2.pdf5 Jul 2017
Building Plan Approval (IOD)File: Location Clearance Pg 3.pdf5 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC page 1 2 .pdf5 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC page 3 4 5 .pdf5 Jul 2017
PAN CardFile: KHC - PAN Card.pdf4 Jul 2017
Copy of the legal title reportFile: Title Report.pdf4 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Kakad Paradise Phase 1Mira Road East148CompletedSep 2014Late, Apr 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kakad Paradise Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Penkarpada, Mahajanwadi7,600+ in Thane

2 kmKakad Paradise Phase 2Completed 105Lapsed / revoked 80Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: Kakad Housing Corporation

Kakad Housing Corporation has 1 registration on MahaRERA, including Kakad Paradise Phase 2. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Kakad Paradise Phase 2 is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kakad Paradise Phase 2?

The registered promoter entity is Kakad Housing Corporation, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kakad Paradise Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kakad Paradise Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kakad Paradise Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kakad Paradise Phase 2?

The professionals named in the filing: Architect: Ajay Mane; Engineer: Surendra Velji Patel. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kakad Paradise Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kakad Paradise Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kakad Paradise Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.