KAIZEN

By Smile Housing

RG-MH-24555 · RERA P52100012338 · Last updated on MahaRERA portal: 13 May 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 105 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Staircases, 85%
19 of 64Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

KAIZEN is a Others project by Smile Housing in Pune, Maharashtra, registered with MahaRERA as P52100012338 on 1 Sep 2017. The registration is recorded completed; possession was promised by 31 Dec 2027. The completion date has moved by 105 months from the original filing. 45 of the 64 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKAIZEN
  • TypeOthers
  • Location
    • PLOT B
    • SOPAN BAUG
    • BALEWADI
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100012338
  • ReraGenie IDRG-MH-24555

Builder

  • NameSmile Housing
  • Entity typePartnership
  • GSTIN27ABWFS9560J1Z4
  • PartnersAditya Bhavarlal Solanki, Swati Sachin Khinvasara
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2017First promiseMar 2019Revised toDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed139 files

Current status

70%45 of 64 units booked

Figures as on 13 May 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KaizenNA1210491564

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

Kaizen: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 13 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes85%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Open Space40

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,675 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPUNE MUNCIPAL CORPORATION
Permissible FSI3668.34
Proposed, not sanctioned2,668 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE CITY BELBAUG CHOWK

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS TARAWADI
ArchitectVILAS TARWADI
EngineerParag Chopda
EngineerPARAS SUBHASH KHINVASARA
Chartered AccountantV.A.DUDHEDIA & ASSOCIATES
Chartered AccountantV A DUDHEDIA AND ASSOCIATES
PartnerRole in project
Smile Housing-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001577Mar 2019 → Mar 2020

Reason as filed by the promoterWater Proofing work of Lekage in Basement has to be done.

EXT52100024782Mar 2019 → Dec 2027

Reason as filed by the promoterEarlier completion date was for phase - I, accordingly part completion was taken. Now as per the order passed by MAHARERA. They have instructed us to complete the remaining work. Before starting the said work Architect has instructed us that we need to revalidate, revised the said plan. For this we need to take permission of MOD we have already applied for the same but as per information given by architect for this only more than 6 months required, another thing is people are already staying there therefor at least 2-3 months required for arrangement of necessary safety measures, so work will

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000106514Kaizen Co-operative Housing Society Ltd.,Smile Housing19/01/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Oct 2024

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QA 19-20.pdf13 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA 20-21.pdf13 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA 21-22.pdf13 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA 22-23.pdf13 May 2025
Declaration in FORM BFile: Form B.pdf12 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf12 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q2 21-22.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q4 20-21.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q3 21-22.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q4 21-22.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q1 22-23.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q2 22-23.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q3 22-23.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q4 22-23.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q1 23-24.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q2 23-24.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q3 23-24.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q4 23-24.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q1 24-25.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q2 24-25.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q3 24-25.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q4 24-25.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q1 21-22.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q3 20-21.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q2 20-21.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q1 20-21.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q4 19-20.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q3 19-20.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q2 19-20.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q1 19-20.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q4 18-19.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q3 18-19.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q2 18-19.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q1 18-19.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q4 17-18.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q3 17-18.pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Q2 17-18.pdf12 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A (23-24).pdf12 May 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf18 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: HASTIMAL CHAVAN.pdf18 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SWATI KHINVASARA.pdf18 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ADITYA SOLANKI.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23.pdf18 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 23-24.pdf18 Dec 2024
CERSAI detailsFile: CERSAI_Search_Report_200326992963_For_Debtor_Based_Search_08_11_2024_17_44_47_788.pdf8 Nov 2024
CERSAI detailsFile: NOC BANK.pdf8 Nov 2024
Details of encumbrances concerned to FinanceFile: Form B.pdf5 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P-1.pdf5 Nov 2024
Details of encumbrances concerned to LegalFile: Form B.pdf5 Nov 2024
Other - TechnicalFile: Hastimal Chavan Declaration.pdf5 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE.pdf30 Oct 2024
Building plan approvalFile: 1.pdf28 Oct 2024
Building plan approvalFile: 2.pdf28 Oct 2024
Building plan approvalFile: 3.pdf28 Oct 2024
Building plan approvalFile: 4.pdf28 Oct 2024
Building plan approvalFile: 5.pdf28 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Oct 2024
Building Plan Approval (IOD)File: 1.pdf28 Oct 2024
Building Plan Approval (IOD)File: 2.pdf28 Oct 2024
Building Plan Approval (IOD)File: 3.pdf28 Oct 2024
Building Plan Approval (IOD)File: 4.pdf28 Oct 2024
Building Plan Approval (IOD)File: 5.pdf28 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect sign.pdf7 Jun 2021
OtherFile: Declaration.pdf28 Jul 2020
OtherFile: Application for OC.pdf20 Mar 2020
Certificates of CA (Form 3)File: Form 3 19-20.pdf11 Mar 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19 P1.pdf11 Mar 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19 P2.pdf11 Mar 2020
Certificates of CA (Form 5)File: Form 5 - RERA CERTIFICATE 17-18.pdf26 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate New.pdf26 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate New.pdf26 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: CC N - 1.pdf26 Jul 2018
Layout approvalFile: Sanction plan 1.pdf22 Aug 2017
Layout approvalFile: Sanction plan 2.pdf22 Aug 2017
Layout approvalFile: Sanction plan 3.pdf22 Aug 2017
Layout approvalFile: sanction plan 4.pdf22 Aug 2017
Layout approvalFile: sanction plan 5.pdf22 Aug 2017
Layout approvalFile: 1 (1).pdf22 Aug 2017

How this compares with Pune

70%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 105 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAIZEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SOPAN BAUG, BALEWADI13,700+ in Pune

2 kmKAIZENCompleted 132Lapsed / revoked 47Other 119Dot size: filed unitsN

Filed coordinates, straight-line distance. 298 registered projects within 2 km.

Builder: Smile Housing

Smile Housing has 1 registration on MahaRERA, including KAIZEN. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KAIZEN is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAIZEN?

The registered promoter entity is Smile Housing, a partnership as per the filing. Its GSTIN 27ABWFS9560J1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAIZEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KAIZEN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KAIZEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAIZEN?

The professionals named in the filing: Architect: VILAS TARAWADI; Architect: VILAS TARWADI; Engineer: Parag Chopda; Engineer: PARAS SUBHASH KHINVASARA; Chartered Accountant: V.A.DUDHEDIA & ASSOCIATES; Chartered Accountant: V A DUDHEDIA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAIZEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAIZEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAIZEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.