Home / Browse projects / Solapur, Maharashtra / Kaizen Emerald

Registered No litigation declared Residential / Group Housing project

Kaizen Emerald

By Swapnil Nalin Kothadia

RG-MH-18895 · RERA P52600077841 · Last updated on MahaRERA portal: 16 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 21 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 90%
23 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Kaizen Emerald is a Residential / Group Housing project by Swapnil Nalin Kothadia in Solapur, Maharashtra, registered with MahaRERA as P52600077841 on 7 Nov 2024. Possession is promised by 31 Dec 2027. The completion date has moved by 21 months from the original filing. 5 of the 28 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameKaizen Emerald
  • TypeResidential / Group Housing
  • Location
    • Dhaneshwari Nagar
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413001
  • Pincode413001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600077841
  • ReraGenie IDRG-MH-18895

Builder

  • NameSwapnil Nalin Kothadia
  • Entity typeIndividual

Key dates

this monthRegisteredNov 2024First promiseMar 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Nov 2024
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed74 files

Current status

18%5 of 28 units booked

Figures as on 16 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kaizen EmraldNA9728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Kaizen Emrald: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered44

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area512 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2026

Approvals and building plan

Sanctioning authoritySolapur Municipal Corporation
Permissible FSI1638.39
Proposed, not sanctioned1,638 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKuber Chambers 5/1 C Nehru Nagar Vijapur Road Solapur 413004

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectZeeshan Mundewadi
EngineerSaqlain Shaikh
Chartered AccountantMurtuza Holawala
Chartered AccountantHuzaifa S Sanawadwala
PartnerRole in project
Swapnil Nalin Kothadia-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52600077841/WarMar 2026 → Jul 2026

Reason as filed by the promoterNA

EA16092638927Mar 2026 → Dec 2027

Reason as filed by the promoterWe, Swapnil Nalin Kothadia, are promoter of the project Kaizen Emerald, registered under MahaRERA vide registration number P52600077841. Sir the foresaid project was projected to be completed by 31/07/2026 but due to lesser response in bookings and technical problems raised in the project the project is now bound to be delayed. The project till date is about 50% completed which is also certified by the project architect in form 1 uploaded in MahaRERA portal. Currently out of total 28 units in the project, we have sold 05 units. Out of which 03 have already given their consent for extension of

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf16 Sep 2026
Form 2File: Form 2.pdf16 Sep 2026
Form 3File: Form 3.pdf16 Sep 2026
Disclosure of Sold and Booked InventoryFile: Inventory .pdf16 Sep 2026
Form 5 (FY 2024-2025)File: Form 5 2425.pdf18 May 2026
Form 5 (FY 2025-2026)File: Form 5 2526.pdf18 May 2026
Form 1File: Form 1.pdf16 May 2026
Form 2File: Form 2.pdf16 May 2026
Form 3File: Form 3 - CA Kaizen Q425 FY 202526.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Q42526.pdf16 May 2026
Form 1File: Form 1.pdf16 May 2026
Form 2File: Form 2.pdf16 May 2026
Form 3File: Form 3 - CA Kaizen Q425 FY 202526.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Q42526.pdf16 May 2026
Form 1File: Form 1.pdf16 May 2026
Form 2File: Form 2.pdf16 May 2026
Form 3File: Form 3 - CA Kaizen Q425 FY 202526.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Q42526.pdf16 May 2026
Form 1File: Form 1.pdf16 May 2026
Form 2File: Form 2.pdf16 May 2026
Form 3File: Form 3 - CA Kaizen Q425 FY 202526.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Q42526.pdf16 May 2026
Form 1File: Form 1.pdf16 May 2026
Form 2File: Form 2.pdf16 May 2026
Form 3File: Form 3 - CA Kaizen Q425 FY 202526.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Q42526.pdf16 May 2026
Form 1File: Form 1.pdf16 May 2026
Form 2File: Form 2.pdf16 May 2026
Form 3File: Form 3 - CA Kaizen Q425 FY 202526.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Q42526.pdf16 May 2026
Form 2A (FY 2024-2025)File: Form 2A 2425.pdf16 May 2026
Form 2A (FY 2025-2026)File: Form 2A 2526.pdf16 May 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 25.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: iNVENTORY.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 25.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 25.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (1).pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 24 (1).pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Disclosure.pdf20 Jan 2025
Other - FinanceFile: Desk 2 scrutiny clarification kaizen.pdf28 Oct 2024
Proforma of Agreement for saleFile: NewAgreement to sale Flat Own Land Kaizen.pdf21 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Kaizen Email.pdf17 Oct 2024
Other - TechnicalFile: Declaration of Non Registration Standalone Project (3).pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 13 Oct 2024 (2).pdf13 Oct 2024
Other - LegalFile: Adobe Scan 13 Oct 2024 (1)_compressed (1).pdf13 Oct 2024
Other - LegalFile: new sale deed swapnil kothadia_compressed.pdf13 Oct 2024
Building plan approvalFile: Kaizen Plan.pdf12 Oct 2024
Layout approvalFile: Kaizen Plan.pdf12 Oct 2024
PAN CardFile: Swapnil Kothadia PAN.pdf12 Oct 2024
Copy of the legal title reportFile: Kaizen Search.pdf12 Oct 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Legal (7).pdf12 Oct 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Financial (4).pdf12 Oct 2024
Copy of Layout Approval (in case of layout)File: Kaizen Plan.pdf12 Oct 2024
Proforma of Allotment letterFile: Allotment Letter Flat Own Land kaizen.pdf12 Oct 2024
Declaration in FORM BFile: Adobe Scan Oct 12, 2024 (6) (1).pdf12 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Balaji Dev F1 (1).pdf12 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Balaji Dev F2 (1).pdf12 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Kaizen CC.pdf12 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Kaizen Plan.pdf12 Oct 2024
Other - LegalFile: 712 swapnil kothadia.pdf12 Oct 2024
Other - LegalFile: Legal clarification.pdf12 Oct 2024
Declaration about Commencement CertificateFile: Declaration About CC (4).pdf12 Oct 2024
CERSAI detailsFile: CERSAI_Search_Report_200323839058_For_Asset_Based_Search_12_10_2024_15_15_15_501.pdf12 Oct 2024
CERSAI detailsFile: CERSAI Declaration.pdf12 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Promoter Letterhead.pdf12 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment Flat Own Land.pdf12 Oct 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Legal (7).pdf12 Oct 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Financial (4).pdf12 Oct 2024
Other - TechnicalFile: Technical clarification.pdf12 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation ATS Apartment Own Land.pdf12 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Projects - Promoter Letterhead (5).pdf12 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: swapnil kothadia idbi.pdf12 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Finance Secured.pdf12 Oct 2024

How this compares with Solapur

18%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one moved by 21 months
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep Kaizen Emerald on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhaneshwari Nagar550+ in Solapur

2 kmKaizen EmeraldCompleted 23Lapsed / revoked 13Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: Swapnil Nalin Kothadia

Swapnil Nalin Kothadia has 1 registration on MahaRERA, including Kaizen Emerald. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if Kaizen Emerald is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kaizen Emerald?

The registered promoter entity is Swapnil Nalin Kothadia, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kaizen Emerald?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kaizen Emerald?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kaizen Emerald?

The professionals named in the filing: Architect: Zeeshan Mundewadi; Engineer: Saqlain Shaikh; Chartered Accountant: Murtuza Holawala; Chartered Accountant: Huzaifa S Sanawadwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kaizen Emerald?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kaizen Emerald. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kaizen Emerald to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.