Red flags
- Registration lapsed
- Possession 21 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 7 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 5 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KAIRALI PARK is a Others project by RAI RESIDENCY Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700026352 on 11 Sep 2020. Possession was promised by 29 Jan 2025 and is now 21 months past that date. The completion date has moved by 7 months from the original filing. 42 of the 113 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameKAIRALI PARK
- TypeOthers
- Location
- POONA LINK ROAD
- KALYAN E
- KATEMANEVALI
- Kalyan
- Thane
- 421306
- Pincode421306
- RERA no.P51700026352
- ReraGenie IDRG-MH-28468
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Sep 2020
- Promised completion29 Jan 2025
- Revised completionRevised to 29 Jan 2025 (originally 30 Jun 2024)
- Buildings2 building records
- Documents filed150 files
Current status
Figures as on 8 Feb 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 2 A WING | NA | 20 | 0 | 111 | 0 | 111 |
| BUILDING NO 3 | NA | 2 | 0 | 2 | 0 | 2 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 8 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 85%.
BUILDING NO 2 A WING62%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 45% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
BUILDING NO 319%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 2% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed35
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| BUILDING NO 2 A WING | 32 | 32 |
| BUILDING NO 3 | 3 | 3 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 2 A WING | NA | Rs 14.96 cr | Rs 10.50 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DE CON CONSULTANTS |
| Architect | DECON CONSULTANTS |
| Engineer | MANOHAR PATIL AND ASSOCIATES |
| Engineer | MANOHAR PATIL & ASSOCIATES |
| Chartered Accountant | GAYAKWAD AND ARRACKEN |
| Chartered Accountant | CA MAYUR K JAIN AND CO |
| Chartered Accountant | ANKIT PARAS JAIN & CO |
| Partner | Role in project |
|---|---|
| RAI RESIDENCY Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject is complete and we want to apply for Post Facto extension. Kindly grant us extension till 29.01.2025
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000209373 | Raybhan Satdive | K SHIVDASANNAIR | 12/12/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 31 Jan 2025
Documents filed150
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 150 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-3 FORM 1 DEC 2024 KAIRALI.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QTR-3 FORM 2 DEC 2024 KAIRALI.pdf | 8 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: QTR-3 SOLD UNSOLD DEC 24 KAIRALI.pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QTR-3 FORM 3 DEC 2024 KAIRALI.pdf | 8 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-3 FORM 1 DEC 2024 KAIRALI.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QTR-3 FORM 2 DEC 2024 KAIRALI.pdf | 8 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: QTR-3 SOLD UNSOLD DEC 24 KAIRALI.pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QTR-3 FORM 3 DEC 2024 KAIRALI.pdf | 8 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-3 FORM 1 DEC 2024 KAIRALI.pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: QTR-3 FORM 3 DEC 2024 KAIRALI.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QTR-3 FORM 2 DEC 2024 KAIRALI.pdf | 8 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: QTR-3 SOLD UNSOLD DEC 24 KAIRALI.pdf | 8 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KAIRALI OC DT 29012025.pdf | 31 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KAIRALI PLAN FINAL PLAN 29012025.pdf | 31 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KAIRALI OC DT 29012025.pdf | 31 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KAIRALI PLAN FINAL PLAN 29012025.pdf | 31 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KAIRALI OC DT 29012025.pdf | 31 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KAIRALI PLAN FINAL PLAN 29012025.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-2 FORM 2 SEPT 2024 KAIRALI.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QTR-2 FORM 2 SEPT 2024 KAIRALI PARK.pdf | 25 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Q-1 SOLD UNSOLD SEP 24.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-06-2024 Sign.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2024 Sign.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-2 FORM 2 SEPT 2024 KAIRALI.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QTR-2 FORM 2 SEPT 2024 KAIRALI PARK.pdf | 25 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Q-1 SOLD UNSOLD SEP 24.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-06-2024 Sign.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2024 Sign.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: QTR-2 FORM 2 SEPT 2024 KAIRALI.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-06-2024 Sign.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2024 Sign.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: QTR-2 FORM 2 SEPT 2024 KAIRALI PARK.pdf | 25 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Q-1 SOLD UNSOLD SEP 24.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2022-23 KAIRALI.pdf | 4 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2023-24 KAIRALI.pdf | 4 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-23 KAIRALI.pdf | 4 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24 KAIRALI.pdf | 4 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2022-23 KAIRALI.pdf | 4 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2023-24 KAIRALI.pdf | 4 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-23 KAIRALI.pdf | 4 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24 KAIRALI.pdf | 4 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2022-23 KAIRALI.pdf | 4 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2023-24 KAIRALI.pdf | 4 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-23 KAIRALI.pdf | 4 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023-24 KAIRALI.pdf | 4 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-1 FORM 1 ARCH CERT JUNE 2022.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-2 FORM 1 ARCH CERT SEPT 22.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-3 FORM 1 ARCH CERT DEC 22.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-4 FORM 1 ARCH CERT MAR 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-1 FORM 1 ARCH CERT JUNE 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-3 FORM 1 ARCH CERT DEC 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-4 FORM 1 ARCH CERT MAR 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-1 FORM 1 ARCH CERT JUNE 24.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-1 FORM 2 KAIRALI JUNE 22.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-2 FORM 2 KAIRALI SEPT 22.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-3 FORM 2 KAIRALI DEC 22.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-4 FORM 2 KAIRALI MAR 23.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-1 FORM 2 KAIRALI JUNE 23.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-2 FORM 2 KAIRALI SEPT 23.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-3 FORM 2 KAIRALI DEC 23.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-4 FORM 2 KAIRALI MAR 24.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-1 FORM 2 KAIRALI JUNE 24.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Q-1 SOLD UNSOLD JUNE 22.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Q-2 SOLD UNSOLD SEPT 22.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Q-3 SOLD UNSOLD DEC 22.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Q-4 SOLD UNSOLD MAR 23.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Q-1 SOLD UNSOLD JUNE 2023.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Q-2 SOLD UNSOLD SEPT 2023.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Q-3 SOLD UNSOLD DEC 23.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Q-4 SOLD UNSOLD MAR 24.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Q-1 SOLD UNSOLD JUNE 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-1 FORM 1 ARCH CERT JUNE 2022.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-2 FORM 1 ARCH CERT SEPT 22.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-3 FORM 1 ARCH CERT DEC 22.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-4 FORM 1 ARCH CERT MAR 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-1 FORM 1 ARCH CERT JUNE 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-3 FORM 1 ARCH CERT DEC 23.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-4 FORM 1 ARCH CERT MAR 24.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q-1 FORM 1 ARCH CERT JUNE 24.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-1 FORM 2 KAIRALI JUNE 22.pdf | 6 Oct 2024 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PHE II | Adharsh Nagar Tisgoan Kalyan east | 88 | Completed | Sep 2014 | Sep 2014 |
| PHE I | Adharsh Nagar Tisgoan Kalyan | 128 | Completed | May 2014 | May 2014 |
| SE | Adaresh Nagar Tisgaon Kalyan East | 81 | Completed | Apr 2014 | Apr 2014 |
| BALIRAM ENCLAVE | Adarsh Nagar Near Gaudevi Mandir Tisgoan Kalyan East | 101 | Completed | Apr 2014 | Apr 2014 |
| GOVIND | ADHARSH NAGAR TISGOAN | 81 | Completed | May 2013 | May 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 17 other registrations, which the RERA portal never shows together
- All 150 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep KAIRALI PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KALYAN E7,600+ in Thane
Kohinoor Eden
KGI REALTY PRIVATE LIMITED
Olympia City Phase 1
Balaji Rattan Lifespaces
Krishna Trident
Sonawane Infrastructure Private Limited
Rai s Heaven
RAI RESIDENCY Private Limited
Metro Grande Tower C and D
West Pioneer Properties India Pvt Ltd
SEASON SAHARA BUILDING NO 4 AND 5
SAMARTH SAI BUILDERS & DEVELOPERS
See every Thane project, with the district possession charts
Builder: RAI RESIDENCY Private Limited
RAI RESIDENCY Private Limited has 18 registrations on MahaRERA, including YASHWANT HEIGHTS C Wing and RAI S HERITAGE D Wing. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that KAIRALI PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KAIRALI PARK is delayed beyond 29 Jan 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KAIRALI PARK?
The registered promoter entity is RAI RESIDENCY Private Limited, a company as per the filing. Its CIN U55100MH2000PTC124416 and GSTIN 27AABCR7454F1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KAIRALI PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KAIRALI PARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KAIRALI PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KAIRALI PARK?
The professionals named in the filing: Architect: DE CON CONSULTANTS; Architect: DECON CONSULTANTS; Engineer: MANOHAR PATIL AND ASSOCIATES; Engineer: MANOHAR PATIL & ASSOCIATES; Chartered Accountant: GAYAKWAD AND ARRACKEN; Chartered Accountant: CA MAYUR K JAIN AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KAIRALI PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback