Home / Browse projects / Mumbai Suburban, Maharashtra / KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL

Registered No litigation declared Residential / Group Housing project

KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL

By KABRA AND ASSOCIATES

RG-MH-07343 · RERA P51800054840 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Excavation, 95%
49 of 127Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL is a Residential / Group Housing project by KABRA AND ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054840 on 15 Feb 2024. Possession is promised by 31 Dec 2027. 78 of the 127 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameKABRA TIARA - Redevelopment of Dindoshi Darshan CHSL
  • TypeResidential / Group Housing
  • Location
    • Building No 1 Shivdham Complex
    • Gen. A. K. Vaidya Marg
    • Opp Dindoshi Fire Station
    • Dindoshi
    • Malad (East)
    • Mumbai
    • Dindoshi
    • Borivali
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800054840
  • ReraGenie IDRG-MH-07343

Builder

  • NameKABRA AND ASSOCIATES
  • Entity typePartnership
  • GSTIN27AAFFK2000F1ZZ
  • PartnersSHYAMSUNDER ASHARAM KABRA, RAJESH ASHARAM KABRA, GAUTAM JAIGOPAL KABRA, MANISH KAMALKISHORE KABRA, ABHISHEK KAMALKISHORE KABRA, GOURAV JAIGOPAL KABRA, VINIL SHYAMSUNDER KABRA
  • Other registrations7 more →
  • Completed7 of 8
  • Declared earlier projects14 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

61%78 of 127 units booked
79.0%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dindoshi Darshan Co-operative Housing Society LtdNA23221270127

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.

Dindoshi Darshan Co-operative Housing Society Ltd: 55% average across the applicable activities

ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises71%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed164

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots164
Closed/Covered164

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,416 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Apr 2026
LandownerVillageDistrict
Dindoshi Darshan Co-operative Housing Society LtdDindoshiMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI10636.75
Proposed, not sanctioned10,637 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA101, 1st Floor, Reyn Basera Bldg, Plot No 24, Vallabh Nagar Society, Opp Cooper Hospital JVPD Schem
Estimated costRs 71.27 cr
Cost incurredRs 56.29 cr
Work done78.97%
BuildingWingEstimatedIncurred
Dindoshi Darshan Co-operative Housing Society LtdNARs 71.27 crRs 56.29 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch Rushikesh H
ArchitectArch Hemant Talaty
ArchitectArch Abhijit Madhbavi
ArchitectArch Mandar Katalkar
EngineerMANOJ KUMAR
EngineerEPICON Structural Engineers Pvt Ltd MR ANAND KULKARNI
Chartered AccountantCA Mehul Dhruv Dhruv
Chartered AccountantCA Narendra ROSHANLAL Chitlangia
Chartered AccountantCA Giridharlal Chitlangia & Co
PartnerRole in project
KABRA AND ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf4 May 2026
Withdrawal Update Form 2File: Engineering Certificate Q4.pdf4 May 2026
Withdrawal Update Form 3File: CA CETRIFICATE.pdf4 May 2026
Withdrawal Update Form 1File: Architect Certificate july-2025.pdf17 Apr 2026
Withdrawal Update Form 1File: KT Form 1 Architect Certificate as on 31st Dec 2025.pdf17 Apr 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE TIARA JUNE-25.pdf17 Apr 2026
Withdrawal Update Form 2File: KT Form 2 Engineer Certificate as on 31st Dec 2025.pdf17 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE JUNE-2025.pdf17 Apr 2026
Withdrawal Update Form 3File: C A CERTIFICATE.pdf17 Apr 2026
Form 5 (FY 2024-2025)File: form 5 24-25.pdf17 Apr 2026
Form 1File: KT Form 1 Architect Certificate as on 30th Sept 2025.pdf4 Feb 2026
Form 2File: KT Form 2 Engineer Certificate as on 30th Sept 2025.pdf4 Feb 2026
Form 3File: KT Form 3 CA Certificate as on 30th Sept 2025.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: KT Disclosure of Sold and Booked Inventory as on 30th Sept 2025.pdf4 Feb 2026
KT Form 2 Engineer Certificate as on 31st March 202529 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT Form 1 Architect Certificate as on 31 March 2025.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KT Form 3 CA Certificate as on 31st March 2025.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 KT Form 1 Architect Certificate_as on 30-12-2024.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 KT Form 3 CA Certificate 30 Dec 2024 LR.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 KT Form 2 Engineer Certificate As on 30 Dec 2024 LR.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: KT Form 5 CA Certificate Annual Report on Statement of Accounts 31st March 2024.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT Form 1 Architect Certificate As on 30 June 2024.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KT Form 3 CA Certificate 30 June 2024 LR.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KT Form 2 Engineer Certificate As on 30 June 2024.pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KT Form 3 CA Certificate 30 03 2024.pdf6 May 2024
Building plan approvalFile: Amended Plan Page 1 26 04 2024.pdf2 May 2024
Building plan approvalFile: Amended Plan Page 2 26 04 2024.pdf2 May 2024
Building plan approvalFile: Amended Plan Page 3 26 04 2024.pdf2 May 2024
Building plan approvalFile: Amended Plan Page 4 26 04 2024.pdf2 May 2024
Building plan approvalFile: Amended Plan Page 5 26 04 2024.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 1 26 04 2024.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 2 26 04 2024.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 3 26 04 2024.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 4 26 04 2024.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 5 26 04 2024.pdf2 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Amendment Letter dated 26-04-2024.pdf2 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Amended Plan Page 1 26 04 2024.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT Form 1 Architect Certificate As on 31 March 2024.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KT Form 2 Engineer Certificate As on 31 March 2024.pdf2 May 2024
Declaration about Commencement CertificateFile: 12 KABRA TIARA Format D Declaration about CC.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 KABRA TIARA Form 3 CA Certificate Dec 2023 R3.pdf6 Feb 2024
Deviation Report with respect to model copy of AgreementFile: 17 KABRA TIARA Deviation Report Agreement for Sale V2.pdf3 Feb 2024
Other - TechnicalFile: MHADA Certified Letter to MAHARERA Bldg No1 Dindoshi Darshan.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: 13 KABRA TIARA 1A Details of Encumbrance concered to FIANANCE.pdf4 Jan 2024
Details of encumbrances concerned to FinanceFile: 13 KABRA TIARA 1B Details of Encumbrance concered to Legal.pdf4 Jan 2024
Details of encumbrances concerned to LegalFile: 13 KABRA TIARA 1A Details of Encumbrance concered to FIANANCE.pdf4 Jan 2024
Details of encumbrances concerned to LegalFile: 13 KABRA TIARA 1B Details of Encumbrance concered to Legal.pdf4 Jan 2024
Proforma of Agreement for saleFile: 16 KABRA TIARA Draft Agreement for Sale V2.pdf4 Jan 2024
Layout approvalFile: KABRA TIARA IOD DATED 15062023.pdf3 Jan 2024
Copy of the legal title reportFile: 9 KABRA TIARA Format A Legal Title Report with attachment.pdf3 Jan 2024
Copy of Layout Approval (in case of layout)File: KABRA TIARA IOD DATED 15062023.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 KABRA TIARA Form 2 Engineer Certificate.pdf3 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 5 KABRA TIARA Form 2A Engineer Certificate for Quality Assurance.pdf3 Jan 2024
Proforma of Allotment letterFile: 18 KABRA TIARA Draft Allotment Letter.pdf3 Jan 2024
Layout approvalFile: Joint Demarcation Plan.pdf28 Dec 2023
Building plan approvalFile: Kabra Tiara Pg 1 2 Approved Plan dt 12 09 2023 LR.pdf28 Dec 2023
Building plan approvalFile: Kabra Tiara Pg 3 4 5 Approved Plan dt 12 09 2023 LR.pdf28 Dec 2023
PAN CardFile: KABRA and ASSOCIATES NEW Pan Card 2017.pdf28 Dec 2023
Copy of Layout Approval (in case of layout)File: Joint Demarcation Plan.pdf28 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Kabra Tiara Pg 1 2 Approved Plan dt 12 09 2023 LR.pdf28 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Kabra Tiara Pg 3 4 5 Approved Plan dt 12 09 2023 LR.pdf28 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Dindoshi Darshan 1st CC 01122023.pdf28 Dec 2023
Declaration in FORM BFile: 10 KABRA TIARA FORM B Declaration Supported by Affidavit.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 KABRA TIARA Form 1 Architect Certificate.pdf28 Dec 2023
CERSAI detailsFile: 20 KABRA TIARA Letter for CERSAI.pdf28 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 15 KABRA TIARA Annx A Disclosure of Interest in other Real Estate Organisation.pdf28 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 14 KABRA TIARA Declaration about Separate Bank Account.pdf28 Dec 2023
Deviation Report with respect to Allotment letterFile: 19 KABRA TIARA Deviation Report Allotment Letter.pdf28 Dec 2023

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise4 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
KABRA DIAMANTEP51800030391BELWALKAR WADI GOREGAON WEST, Mumbai Suburban-Aug 2021CompletedDec 2025Jun 2024
KABRA METRO ONE WING A AND B A Redevelopment Project of PRATAP CHSLP51800001067Between 4 & 7 Bungalow, Opp. Bonbon, Mumbai Suburban-Jul 2017CompletedDec 2022Feb 2020
KABRA CENTROID A Redevelopment of GOP CHSLP51800000307Andheri, Mumbai Suburban-Jul 2017CompletedDec 2021Oct 2019
KABRA AJANTA Redevelopment of Santacruz Ajanta Premises Co Operative Society LtdP51800002483Andheri, Mumbai Suburban-Aug 2017CompletedDec 2021Apr 2018
KABRA AURUM WING A B C AND D Redevelopment of Goregaon Unnat Nagar II Plot No 51 to 55 CHSLP51800005550Andheri, Mumbai Suburban-Aug 2017CompletedDec 2019Jan 2019
TILAK Revelopment Project of TILAK APARTMENT CHSLP51800007990Andheri, Mumbai Suburban-Aug 2017CompletedDec 2017Jul 2017
NATRAJCorner of Prem Nagar & Sodawala Lane Opp. Prabhodhan Thackarey Hall Borivali West Mumbai 400092 MAHARASHTRA93-CompletedJun 2017May 2017
RAGESHREESodawala Lane Opp. Pandya Hospital Borivali West Mumbai - 400 092 MAHARASHTRA69-CompletedJun 2016Late, May 2017
KABRA ARGENTUM - UNNAT NAGAR - 43/44Plot No. 43 - 44 Unnat Nagar II Off S V Road, Opp Patkar College, Goregaon West Mumbai - 400 104 MAHARASHTRA79-CompletedSep 2015Late, Jan 2016
NEW VINAYSunder Nagar Near Mumbai University Kalina Santacruz East Mumbai 400 098 MAHARASHTRA70-CompletedMay 2015Late, Dec 2015
CHRISTINAShree Nagar Estate Vidyaniketan Marg Off M G Road Goregaon West Mumbai - 400 104 MAHARASHTRA51-CompletedMay 2015Sep 2014
VIHANGBuilding No. 16 Siddharth Nagar IV Opp. Vivek College Goregaon West Mumbai - 400 104 MAHARASHTRA41-CompletedMar 2015Late, Jun 2017
NANDANWADIPlot No.257 Jawahar Nagar, Next to Mount Mary High School, Goregaon West Mumbai - 400104 MAHARASHTRA21-CompletedJun 2014May 2014
ALYA GARNETBrahmand Azad Nagar Behind Universal School Brahmand Thane West - 400607 MAHARASHTRA107-CompletedMar 2014Dec 2012

How this compares with Mumbai Suburban

61%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KABRA TIARA - Redevelopment of Dindoshi Dars on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dindoshi, Malad (East), Mumbai6,700+ in Mumbai Suburban

2 kmKABRA TIARA - RedevelopmCompleted 100Lapsed / revoked 65Other 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 287 registered projects within 2 km.

Builder: KABRA AND ASSOCIATES

KABRA AND ASSOCIATES has 8 registrations on MahaRERA, including KABRA CENTROID A Redevelopment of GOP CHSL and KABRA METRO ONE WING A AND B A Redevelopment Project of PRATAP CHSL. Its filings disclose 14 earlier MahaRERA projects: declares 10 of 14 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?

The registered promoter entity is KABRA AND ASSOCIATES, a partnership as per the filing. Its GSTIN 27AAFFK2000F1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?

The professionals named in the filing: Architect: Arch Rushikesh H; Architect: Arch Hemant Talaty; Architect: Arch Abhijit Madhbavi; Architect: Arch Mandar Katalkar; Engineer: MANOJ KUMAR; Engineer: EPICON Structural Engineers Pvt Ltd MR ANAND KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KABRA TIARA - Redevelopment of Dindoshi Dars to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.