Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL is a Residential / Group Housing project by KABRA AND ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054840 on 15 Feb 2024. Possession is promised by 31 Dec 2027. 78 of the 127 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameKABRA TIARA - Redevelopment of Dindoshi Darshan CHSL
- TypeResidential / Group Housing
- Location
- Building No 1 Shivdham Complex
- Gen. A. K. Vaidya Marg
- Opp Dindoshi Fire Station
- Dindoshi
- Malad (East)
- Mumbai
- Dindoshi
- Borivali
- Mumbai Suburban
- 400077
- Pincode400077
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800054840
- ReraGenie IDRG-MH-07343
Builder
- NameKABRA AND ASSOCIATES
- Entity typePartnership
- GSTIN27AAFFK2000F1ZZ
- PartnersSHYAMSUNDER ASHARAM KABRA, RAJESH ASHARAM KABRA, GAUTAM JAIGOPAL KABRA, MANISH KAMALKISHORE KABRA, ABHISHEK KAMALKISHORE KABRA, GOURAV JAIGOPAL KABRA, VINIL SHYAMSUNDER KABRA
- Other registrations7 more →
- Completed7 of 8
- Declared earlier projects14 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed68 files
Current status
Figures as on 4 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Dindoshi Darshan Co-operative Housing Society Ltd | NA | 23 | 22 | 127 | 0 | 127 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 95%.
Dindoshi Darshan Co-operative Housing Society Ltd: 55% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 95% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 71% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 55% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 55% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 60% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed164
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Dindoshi Darshan Co-operative Housing Society Ltd | Dindoshi | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Dindoshi Darshan Co-operative Housing Society Ltd | NA | Rs 71.27 cr | Rs 56.29 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arch Rushikesh H |
| Architect | Arch Hemant Talaty |
| Architect | Arch Abhijit Madhbavi |
| Architect | Arch Mandar Katalkar |
| Engineer | MANOJ KUMAR |
| Engineer | EPICON Structural Engineers Pvt Ltd MR ANAND KULKARNI |
| Chartered Accountant | CA Mehul Dhruv Dhruv |
| Chartered Accountant | CA Narendra ROSHANLAL Chitlangia |
| Chartered Accountant | CA Giridharlal Chitlangia & Co |
| Partner | Role in project |
|---|---|
| KABRA AND ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: Engineering Certificate Q4.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: CA CETRIFICATE.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: Architect Certificate july-2025.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: KT Form 1 Architect Certificate as on 31st Dec 2025.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE TIARA JUNE-25.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: KT Form 2 Engineer Certificate as on 31st Dec 2025.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE JUNE-2025.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: C A CERTIFICATE.pdf | 17 Apr 2026 |
| Form 5 (FY 2024-2025)File: form 5 24-25.pdf | 17 Apr 2026 |
| Form 1File: KT Form 1 Architect Certificate as on 30th Sept 2025.pdf | 4 Feb 2026 |
| Form 2File: KT Form 2 Engineer Certificate as on 30th Sept 2025.pdf | 4 Feb 2026 |
| Form 3File: KT Form 3 CA Certificate as on 30th Sept 2025.pdf | 4 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: KT Disclosure of Sold and Booked Inventory as on 30th Sept 2025.pdf | 4 Feb 2026 |
| KT Form 2 Engineer Certificate as on 31st March 2025 | 29 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT Form 1 Architect Certificate as on 31 March 2025.pdf | 28 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KT Form 3 CA Certificate as on 31st March 2025.pdf | 28 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 KT Form 1 Architect Certificate_as on 30-12-2024.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 KT Form 3 CA Certificate 30 Dec 2024 LR.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 KT Form 2 Engineer Certificate As on 30 Dec 2024 LR.pdf | 21 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: KT Form 5 CA Certificate Annual Report on Statement of Accounts 31st March 2024.pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT Form 1 Architect Certificate As on 30 June 2024.pdf | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KT Form 3 CA Certificate 30 June 2024 LR.pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KT Form 2 Engineer Certificate As on 30 June 2024.pdf | 29 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KT Form 3 CA Certificate 30 03 2024.pdf | 6 May 2024 |
| Building plan approvalFile: Amended Plan Page 1 26 04 2024.pdf | 2 May 2024 |
| Building plan approvalFile: Amended Plan Page 2 26 04 2024.pdf | 2 May 2024 |
| Building plan approvalFile: Amended Plan Page 3 26 04 2024.pdf | 2 May 2024 |
| Building plan approvalFile: Amended Plan Page 4 26 04 2024.pdf | 2 May 2024 |
| Building plan approvalFile: Amended Plan Page 5 26 04 2024.pdf | 2 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 1 26 04 2024.pdf | 2 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 2 26 04 2024.pdf | 2 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 3 26 04 2024.pdf | 2 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 4 26 04 2024.pdf | 2 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Page 5 26 04 2024.pdf | 2 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Amendment Letter dated 26-04-2024.pdf | 2 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Amended Plan Page 1 26 04 2024.pdf | 2 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KT Form 1 Architect Certificate As on 31 March 2024.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KT Form 2 Engineer Certificate As on 31 March 2024.pdf | 2 May 2024 |
| Declaration about Commencement CertificateFile: 12 KABRA TIARA Format D Declaration about CC.pdf | 13 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 KABRA TIARA Form 3 CA Certificate Dec 2023 R3.pdf | 6 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: 17 KABRA TIARA Deviation Report Agreement for Sale V2.pdf | 3 Feb 2024 |
| Other - TechnicalFile: MHADA Certified Letter to MAHARERA Bldg No1 Dindoshi Darshan.pdf | 9 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: 13 KABRA TIARA 1A Details of Encumbrance concered to FIANANCE.pdf | 4 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: 13 KABRA TIARA 1B Details of Encumbrance concered to Legal.pdf | 4 Jan 2024 |
| Details of encumbrances concerned to LegalFile: 13 KABRA TIARA 1A Details of Encumbrance concered to FIANANCE.pdf | 4 Jan 2024 |
| Details of encumbrances concerned to LegalFile: 13 KABRA TIARA 1B Details of Encumbrance concered to Legal.pdf | 4 Jan 2024 |
| Proforma of Agreement for saleFile: 16 KABRA TIARA Draft Agreement for Sale V2.pdf | 4 Jan 2024 |
| Layout approvalFile: KABRA TIARA IOD DATED 15062023.pdf | 3 Jan 2024 |
| Copy of the legal title reportFile: 9 KABRA TIARA Format A Legal Title Report with attachment.pdf | 3 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: KABRA TIARA IOD DATED 15062023.pdf | 3 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 KABRA TIARA Form 2 Engineer Certificate.pdf | 3 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 5 KABRA TIARA Form 2A Engineer Certificate for Quality Assurance.pdf | 3 Jan 2024 |
| Proforma of Allotment letterFile: 18 KABRA TIARA Draft Allotment Letter.pdf | 3 Jan 2024 |
| Layout approvalFile: Joint Demarcation Plan.pdf | 28 Dec 2023 |
| Building plan approvalFile: Kabra Tiara Pg 1 2 Approved Plan dt 12 09 2023 LR.pdf | 28 Dec 2023 |
| Building plan approvalFile: Kabra Tiara Pg 3 4 5 Approved Plan dt 12 09 2023 LR.pdf | 28 Dec 2023 |
| PAN CardFile: KABRA and ASSOCIATES NEW Pan Card 2017.pdf | 28 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Joint Demarcation Plan.pdf | 28 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Kabra Tiara Pg 1 2 Approved Plan dt 12 09 2023 LR.pdf | 28 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Kabra Tiara Pg 3 4 5 Approved Plan dt 12 09 2023 LR.pdf | 28 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Dindoshi Darshan 1st CC 01122023.pdf | 28 Dec 2023 |
| Declaration in FORM BFile: 10 KABRA TIARA FORM B Declaration Supported by Affidavit.pdf | 28 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 KABRA TIARA Form 1 Architect Certificate.pdf | 28 Dec 2023 |
| CERSAI detailsFile: 20 KABRA TIARA Letter for CERSAI.pdf | 28 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 15 KABRA TIARA Annx A Disclosure of Interest in other Real Estate Organisation.pdf | 28 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 14 KABRA TIARA Declaration about Separate Bank Account.pdf | 28 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: 19 KABRA TIARA Deviation Report Allotment Letter.pdf | 28 Dec 2023 |
Promoter's earlier projects14
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| KABRA DIAMANTEP51800030391 | BELWALKAR WADI GOREGAON WEST, Mumbai Suburban | - | Aug 2021 | Completed | Dec 2025 | Jun 2024 |
| KABRA METRO ONE WING A AND B A Redevelopment Project of PRATAP CHSLP51800001067 | Between 4 & 7 Bungalow, Opp. Bonbon, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2022 | Feb 2020 |
| KABRA CENTROID A Redevelopment of GOP CHSLP51800000307 | Andheri, Mumbai Suburban | - | Jul 2017 | Completed | Dec 2021 | Oct 2019 |
| KABRA AJANTA Redevelopment of Santacruz Ajanta Premises Co Operative Society LtdP51800002483 | Andheri, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2021 | Apr 2018 |
| KABRA AURUM WING A B C AND D Redevelopment of Goregaon Unnat Nagar II Plot No 51 to 55 CHSLP51800005550 | Andheri, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2019 | Jan 2019 |
| TILAK Revelopment Project of TILAK APARTMENT CHSLP51800007990 | Andheri, Mumbai Suburban | - | Aug 2017 | Completed | Dec 2017 | Jul 2017 |
| NATRAJ | Corner of Prem Nagar & Sodawala Lane Opp. Prabhodhan Thackarey Hall Borivali West Mumbai 400092 MAHARASHTRA | 93 | - | Completed | Jun 2017 | May 2017 |
| RAGESHREE | Sodawala Lane Opp. Pandya Hospital Borivali West Mumbai - 400 092 MAHARASHTRA | 69 | - | Completed | Jun 2016 | Late, May 2017 |
| KABRA ARGENTUM - UNNAT NAGAR - 43/44 | Plot No. 43 - 44 Unnat Nagar II Off S V Road, Opp Patkar College, Goregaon West Mumbai - 400 104 MAHARASHTRA | 79 | - | Completed | Sep 2015 | Late, Jan 2016 |
| NEW VINAY | Sunder Nagar Near Mumbai University Kalina Santacruz East Mumbai 400 098 MAHARASHTRA | 70 | - | Completed | May 2015 | Late, Dec 2015 |
| CHRISTINA | Shree Nagar Estate Vidyaniketan Marg Off M G Road Goregaon West Mumbai - 400 104 MAHARASHTRA | 51 | - | Completed | May 2015 | Sep 2014 |
| VIHANG | Building No. 16 Siddharth Nagar IV Opp. Vivek College Goregaon West Mumbai - 400 104 MAHARASHTRA | 41 | - | Completed | Mar 2015 | Late, Jun 2017 |
| NANDANWADI | Plot No.257 Jawahar Nagar, Next to Mount Mary High School, Goregaon West Mumbai - 400104 MAHARASHTRA | 21 | - | Completed | Jun 2014 | May 2014 |
| ALYA GARNET | Brahmand Azad Nagar Behind Universal School Brahmand Thane West - 400607 MAHARASHTRA | 107 | - | Completed | Mar 2014 | Dec 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KABRA TIARA - Redevelopment of Dindoshi Dars on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dindoshi, Malad (East), Mumbai6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 287 registered projects within 2 km.
Mahindra Rainforest Phase 1
Anthurium Developers Limited
Mahindra Rainforest Phase 2
Anthurium Developers Limited
CRYSTAL PRIME MERIDIAN
ARYAMAAN DEVELOPERS PRIVATE LIMITED
AARADHYA ONEPARK
MICL CREATORS LLP
CENTRONA ZEN-A
ELEVATED AVENUE REALTY LLP
CENTRONA ZEN-B
ELEVATED AVENUE REALTY LLP
See every Mumbai Suburban project, with the district possession charts
Builder: KABRA AND ASSOCIATES
KABRA AND ASSOCIATES has 8 registrations on MahaRERA, including KABRA CENTROID A Redevelopment of GOP CHSL and KABRA METRO ONE WING A AND B A Redevelopment Project of PRATAP CHSL. Its filings disclose 14 earlier MahaRERA projects: declares 10 of 14 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?
The registered promoter entity is KABRA AND ASSOCIATES, a partnership as per the filing. Its GSTIN 27AAFFK2000F1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?
The professionals named in the filing: Architect: Arch Rushikesh H; Architect: Arch Hemant Talaty; Architect: Arch Abhijit Madhbavi; Architect: Arch Mandar Katalkar; Engineer: MANOJ KUMAR; Engineer: EPICON Structural Engineers Pvt Ltd MR ANAND KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback