Completed No litigation declared Others project

KABRA DIAMANTE

By KABRA AND ASSOCIATES

RG-MH-29925 · RERA P51800030391 · Last updated on MahaRERA portal: 27 Jun 2024

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
3Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

KABRA DIAMANTE is a Others project by KABRA AND ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030391 on 17 Aug 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. 3 complaints are on record with the regulator.

At a glance

Project

  • NameKABRA DIAMANTE
  • TypeOthers
  • Location
    • M. G. Road
    • BELWALKAR WADI GOREGAON WEST
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800030391
  • ReraGenie IDRG-MH-29925

Builder

  • NameKABRA AND ASSOCIATES
  • Entity typePartnership
  • GSTIN27AAFFK2000F1ZZ
  • PartnersSHYAMSUNDER ASHARAM KABRA, RAJESH ASHARAM KABRA, GAUTAM JAIGOPAL KABRA, MANISH KAMALKISHORE KABRA, ABHISHEK KAMALKISHORE KABRA, GOURAV JAIGOPAL KABRA, VINIL SHYAMSUNDER KABRA
  • Other registrations7 more →
  • Completed7 of 8
  • Declared earlier projects14 →

Key dates

this monthRegisteredAug 2021PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2021
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KABRA DIAMANTENA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

KABRA DIAMANTE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed218

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots218
Closed/Covered208
Open Space10

Land and ownership10

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,953 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
LandownerVillageDistrict
YOGENDRA BELWALKARAndheriMumbai Suburban
VIMAL MOHAN BELWALKARBorivaliMumbai Suburban
KISHOR MOHAN BELWALKARAndheriMumbai Suburban
JAYSHREE DILIP BELWALKARAndheriMumbai Suburban
HEMALI DILIP BELWALKARAndheriMumbai Suburban
DEVENDRA DILIP BELWALKARAndheriMumbai Suburban
NEHA DATTATRAY BELWALKARAndheriMumbai Suburban
NEETA MANOHAR PADHYEAndheriMumbai Suburban
NEELA GOVIND DHODAPKARAndheriMumbai Suburban
GEETA DATTATRAY JOSHIAndheriMumbai Suburban

Approvals and building plan

Permissible FSI12629.92
Proposed, not sanctioned12,630 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEVERSHINE AANGAN PLOT NO 4 JAWAHAR NAGAR GOREGAON WEST MUMBAI - 62

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCH HEMANT TALATY
ArchitectARCH NILESH MAKWANA Chamunda Consultants
ArchitectARCH REZA KABUL
EngineerASCENT Structural Engineers Pvt Ltd MR SHRINIWAS MAHAMUNI
Chartered AccountantG L Chitlangia & Co
Chartered AccountantNarendra Chitlangia
PartnerRole in project
KABRA AND ASSOCIATES-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000303503SUSHMA ARVIND TANDELM/S. KABRA AND ASSOCIATES30/11/2022
CC12503949Prasad Raghunath MasurkarKABRA AND ASSOCIATES11/11/2025
CC12600108Darshana Rakesh IndulkarKABRA AND ASSOCIATES07/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jun 2024

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KD Form 1 Architect Certificate 24 June 2024.pdf27 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KD Form 2 Engineer Certificate 24 June 2024.pdf27 Jun 2024
Architect’s Certificate on Completion of Project (Form 4)File: KD Form 4 Architect Certificate 24 June 2024.pdf27 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: KABRA DIAMANTÉ Full OC and BCC dated 21 06 2024.pdf22 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KD Form 2 Engineer Certificate 31 Mar 2024.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KD Form 3 CA Certificate 30 March 2024.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KG Form 1 Architect Certificate As on 31 Mar 2024.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KG Form 2 Engineer Certificate as on 31 Mar 2024.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KG Form 3 CA Certificate as on 30 12 2023.pdf1 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KD Form 1 Architect Certificate 30 Jan 2024.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KD Form 2 Engineer Certificate 30 Jan 2024.pdf5 Feb 2024
Disclosure of sold/ booked inventoryFile: KD Sold-Booked Inventory 30 Jan 2024.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KD Form 3 CA Certificate 30 Jan 2024.pdf5 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KD FORM 5 CA Annual Certificate 2022-23.pdf16 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KD Form 1 Architect Certificate Sept 2023.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KD Form 2 Engineer Certificate Sept 2023.pdf26 Oct 2023
Disclosure of sold/ booked inventoryFile: KD Sold-Booked Inventory.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KD Form 3 CA Certificate Sept 2023.pdf26 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KABRA DIAMANTE FORM 1 ARCHITECT CERTIFICATE 30 JUNE 2023.pdf10 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KABRA DIAMANTE FORM 2 ENGINEER CERTIFICATE JUNE 2023.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KABRA DIAMANTE FORM 3 CA CERTIFICATE JUNE 2023.pdf10 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: KABRA DIAMANTE ANNEXURE A Disclosure of Interest in other Real Estate Organisation.pdf10 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2380651 D Wing OC signed dt 30 June 2023.pdf10 Jul 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Name Reservation Application - Kabra Diamanté ‘C’ CHSL.pdf29 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Name Reservation Application - Kabra Diamanté A and B CHSL.pdf29 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Name Reservation Application - Kabra Diamanté - Business Hub Premises CSL.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KD Form 1 Architect Certificate as on 31-12-2022.pdf24 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KD Form 2 Engineers Certificate as on 31-12-2022.pdf24 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: KD Form 2A Engineers Certificate for Quantity Assurance as on 31-12-2022.pdf24 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KD Form 3 CA Certificate as on 31-12-2022.pdf24 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA CERTIFICATE ANNUAL REPORT.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KABRA DIAMANTE FORM 1 ARCHITECT CERTIFICATE SEPT 2022.pdf8 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KABRA DIAMANTE FORM 2 ENGINEER CERTIFICATE SEPT 2022.pdf8 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KABRA DIAMANTE FORM 3 CA CERTIFICATE SEPT 22.pdf8 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Kabra Diamante C Wing Further CC 2341170 signed.pdf18 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KABRA DIAMANTE FORM 1 ARCHITECT CERTIFICATE JULY 2022.pdf22 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KABRA DIAMANTE FORM 2 ENGINEER CERTIFICATE JULY 2022.pdf22 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KABRA DIAMANTE FORM 3 CA CERTIFICATE JUNE 22.pdf22 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2022.pdf28 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate March 2022.pdf28 May 2022
Disclosure of sold/ booked inventoryFile: CA Certificate Sold and Unsold March 2022.pdf28 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 2022.pdf28 May 2022
Building plan approvalFile: Proforma A Approved Drawing 31 Jan 2022.pdf18 Feb 2022
Layout approvalFile: Proforma A Approved Drawing 31 Jan 2022.pdf18 Feb 2022
Building plan approvalFile: 2300851 Amendletter signed 31 Jan 2022.pdf18 Feb 2022
Copy of Layout Approval (in case of layout)File: Proforma A Approved Drawing 31 Jan 2022.pdf18 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Proforma A Approved Drawing 31 Jan 2022.pdf18 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 2300851 Amendletter signed 31 Jan 2022.pdf18 Feb 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory LV.pdf2 Nov 2021
Disclosure of sold/ booked inventoryFile: UnSold Inventory LV.pdf2 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: CA CERTIFICATE 30 09 2021 LV.pdf2 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA CERTIFICATE 30 09 2021 LV.pdf2 Nov 2021
Layout approvalFile: Amended Drawing - 18 Aug 2021.pdf19 Aug 2021
Building plan approvalFile: Amended letter dated 11 Aug 2021.pdf19 Aug 2021
Copy of Layout Approval (in case of layout)File: Amended Drawing - 18 Aug 2021.pdf19 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended letter dated 11 Aug 2021.pdf19 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Further C C 17 08 2021.pdf19 Aug 2021
Proforma of Allotment letterFile: Draft Agreement for Sale.pdf30 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KABRA DIAMANTÉ FORM 3 CA Certificate Submission on 09-06-2021 contd pages.pdf29 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KABRA DIAMANTÉ FORM 3 CA Certificate Submission on 09-06-2021.pdf29 Jul 2021
Proforma of Allotment letterFile: KABRA DIAMANTÉ_ Draft Allotment Letter_FLAT.pdf29 Jul 2021
Proforma of Allotment letterFile: KABRA DIAMANTÉ_ Draft Allotment Letter_SHOP.pdf29 Jul 2021
Copy of the legal title reportFile: KABRA DIAMANTÉ FORMAT A LEGAL TITLE.pdf2 Jul 2021
Copy of the legal title reportFile: KABRA DIAMANTÉ - Belwalkar wadi Search Report.pdf2 Jul 2021
Details of encumbrancesFile: KABRA DIAMANTÉ ENCUMBRANCE LETTER.pdf2 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: 1st CC_signed.pdf2 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: 2281640_FurtherCC_signed.pdf2 Jul 2021
Declaration about Commencement CertificateFile: KABRA DIAMANTÉ Format D Declaration about CC.pdf2 Jul 2021
OtherFile: KABRA DIAMANTÉ Authorisation Letter to Dilip Soni wide POA attached herewith.pdf2 Jul 2021
OtherFile: KABRA DIAMANTÉ Development Agreement of Belwalkar Wadi LV3.pdf2 Jul 2021
OtherFile: INDEX 2.pdf2 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KABRA DIAMANTÉ Form 1 Architect Certificate.pdf9 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: KABRA DIAMANTÉ Form 2A Quality Assurance 15May2021.pdf9 Jun 2021
Layout approvalFile: SANCTION DRAWING Proforma II.pdf4 Jun 2021
Building plan approvalFile: KABRA DIAMANTÉ IOD dt 04022021.pdf4 Jun 2021
Building plan approvalFile: KABRA DIAMANTÉ Amendletter signed.pdf4 Jun 2021
PAN CardFile: KABRA AND ASSOCIATES Pancard.pdf4 Jun 2021
Copy of the legal title reportFile: KABRA DIAMANTÉ FORMAT A LEGAL TITLE.pdf4 Jun 2021
Details of encumbrancesFile: KABRA DIAMANTÉ ENCUMBRANCE LETTER.pdf4 Jun 2021
Copy of Layout Approval (in case of layout)File: SANCTION DRAWING Proforma II.pdf4 Jun 2021

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

9 delivered on promise4 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
KABRA METRO ONE WING A AND B A Redevelopment Project of PRATAP CHSLP51800001067Between 4 & 7 Bungalow, Opp. Bonbon, Mumbai Suburban-Jul 2017CompletedDec 2022Feb 2020
KABRA CENTROID A Redevelopment of GOP CHSLP51800000307Andheri, Mumbai Suburban-Jul 2017CompletedDec 2021Oct 2019
KABRA AJANTA Redevelopment of Santacruz Ajanta Premises Co Operative Society LtdP51800002483Andheri, Mumbai Suburban-Aug 2017CompletedDec 2021Apr 2018
KABRA AURUM WING A B C AND D Redevelopment of Goregaon Unnat Nagar II Plot No 51 to 55 CHSLP51800005550Andheri, Mumbai Suburban-Aug 2017CompletedDec 2019Jan 2019
TILAK Revelopment Project of TILAK APARTMENT CHSLP51800007990Andheri, Mumbai Suburban-Aug 2017CompletedDec 2017Jul 2017
NATRAJCorner of Prem Nagar & Sodawala Lane Opp. Prabhodhan Thackarey Hall Borivali West Mumbai 400092 MAHARASHTRA93-CompletedJun 2017May 2017
RAGESHREESodawala Lane Opp. Pandya Hospital Borivali West Mumbai - 400 092 MAHARASHTRA69-CompletedJun 2016Late, May 2017
KABRA ARGENTUM - UNNAT NAGAR - 43/44Plot No. 43 - 44 Unnat Nagar II Off S V Road, Opp Patkar College, Goregaon West Mumbai - 400 104 MAHARASHTRA79-CompletedSep 2015Late, Jan 2016
NEW VINAYSunder Nagar Near Mumbai University Kalina Santacruz East Mumbai 400 098 MAHARASHTRA70-CompletedMay 2015Late, Dec 2015
CHRISTINAShree Nagar Estate Vidyaniketan Marg Off M G Road Goregaon West Mumbai - 400 104 MAHARASHTRA51-CompletedMay 2015Sep 2014
VIHANGBuilding No. 16 Siddharth Nagar IV Opp. Vivek College Goregaon West Mumbai - 400 104 MAHARASHTRA41-CompletedMar 2015Late, Jun 2017
NANDANWADIPlot No.257 Jawahar Nagar, Next to Mount Mary High School, Goregaon West Mumbai - 400104 MAHARASHTRA21-CompletedJun 2014May 2014
ALYA GARNETBrahmand Azad Nagar Behind Universal School Brahmand Thane West - 400607 MAHARASHTRA107-CompletedMar 2014Dec 2012

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KABRA DIAMANTE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BELWALKAR WADI GOREGAON WEST6,700+ in Mumbai Suburban

2 kmKABRA DIAMANTECompleted 142Lapsed / revoked 65Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 350 registered projects within 2 km.

Builder: KABRA AND ASSOCIATES

KABRA AND ASSOCIATES has 8 registrations on MahaRERA, including KABRA CENTROID A Redevelopment of GOP CHSL and KABRA METRO ONE WING A AND B A Redevelopment Project of PRATAP CHSL. Its filings disclose 14 earlier MahaRERA projects: declares 10 of 14 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if KABRA DIAMANTE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KABRA DIAMANTE?

The registered promoter entity is KABRA AND ASSOCIATES, a partnership as per the filing. Its GSTIN 27AAFFK2000F1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KABRA DIAMANTE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KABRA DIAMANTE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KABRA DIAMANTE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KABRA DIAMANTE?

The professionals named in the filing: Architect: ARCH HEMANT TALATY; Architect: ARCH NILESH MAKWANA Chamunda Consultants; Architect: ARCH REZA KABUL; Engineer: ASCENT Structural Engineers Pvt Ltd MR SHRINIWAS MAHAMUNI; Chartered Accountant: G L Chitlangia & Co; Chartered Accountant: Narendra Chitlangia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KABRA DIAMANTE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KABRA DIAMANTE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KABRA DIAMANTE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.