Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2023Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 99%
3Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

K-SQUARE-BALEWADI is a Residential / Group Housing project by ANKIT CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100003794 on 6 Aug 2017. The registration is recorded completed; possession was promised by 30 May 2023. The completion date has moved by 12 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameK-SQUARE-BALEWADI
  • TypeResidential / Group Housing
  • Location
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003794
  • ReraGenie IDRG-MH-21315

Builder

  • NameANKIT CONSTRUCTION
  • Entity typePartnership
  • PartnersKISHOR GOVINDRAO KANHERE, PRATIBHA KISHOR KANHERE
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseMay 2022Revised toMay 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Aug 2017
  • Promised completion30 May 2023
  • Revised completionRevised to 30 May 2023 (originally 30 May 2022)
  • Buildings2 building records
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
K- SQUARE- B WINGNA140000
K- SQUARE- A WINGNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 99%.

K- SQUARE- B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
K- SQUARE- A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes98%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes99%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes98%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered45
Open Space27
BuildingClosed/CoveredOpen SpaceTotal
K- SQUARE- B WING231538
K- SQUARE- A WING221234

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,285 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4723.46
Proposed, not sanctioned3,213 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWHC ROAD DHARMPETH NAGPUR

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARESH KOSHTI
EngineerSATISH MARATHE
PartnerRole in project
ANKIT CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011151May 2022 → May 2023

Reason as filed by the promoter1) That project K-SQUARE-BALEWADI on PLOT NO 3/1/2, 3/1/3, 3/1/4 complete 80% and the promoter will be applying for the completion of the project within 8 months from this day as the project is delayed due to various unforeseen circumstances, effects of the pandemic and due to force majeure like storage of material, manpower, labour, lockdown, rise in prices, unavailability of sand etc etc. 2) It is further declared that due to minor technical issues and such unavoidable circumstances, the project Completion Certificate/Occupancy Certificate shall be awaited and therefore under the provisions

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC005000000011886Yogesh DeoreAnkit Constuction26/09/2018
CC005000000054205M/s Ankit ConstructionsMr Yogesh Krishna Deore05/05/2020
CC005000000054206M/s Ankit ConstructionsMr Sanjay Bagul and Mrs Sonali S Bagul05/05/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Apr 2024

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf8 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: RERA FORM-4.pdf8 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: K-SQUARE BELEWADI FORM - 1 DEC-2023.pdf12 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 K-SQUARE-BALEEWADE DEC-23.pdf8 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MAR-2023 K-SQUARE - BALEWADI 08-04-202314102023184814_compressed (1).pdf17 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JUN 2023 K-SQUARE - BALEWADI 12-07-202314102023184424_compressed.pdf17 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SEP-2023 K-SQUARE - BALEWADI 10-10-202314102023185036_compressed.pdf17 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_SEPT-17.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_DEC-17.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_MAR-18.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_JUNE-18.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_SEPT-18.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_DEC-18.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_MAR-19.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_JUNE-19.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_SEPT-19.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_DEC-19.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_MAR-20.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_JUNE-20.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_SEPT-20.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_DEC-20.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_MAR-21.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_SEPT-21.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_DEC-21.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_MAR-22.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_JUNE-22.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_SEPT-22.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_K-SQUARE-BALEWADI_DEC-22.pdf16 Feb 2023
Certificates of CA (Form 3)File: K-Square Balewadi-FORM-3_Sept-21.pdf16 Jan 2023
Certificates of CA (Form 3)File: K-Square Balewadi-FORM-3_Dec-21.pdf16 Jan 2023
Certificates of CA (Form 3)File: K-Square Balewadi-FORM-3_March-22.pdf16 Jan 2023
Certificates of CA (Form 3)File: K-Square Balewadi-FORM-3_June-22.pdf16 Jan 2023
Certificates of CA (Form 3)File: K-Square Balewadi-FORM-3_Dec-22.pdf16 Jan 2023
Certificates of CA (Form 3)File: K-Square BalewadiFORM-5.pdf16 Jan 2023
Certificates of CA (Form 3)File: K-square Balewadi-FORM-3_Sept.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: K-square Balewadi-FORM-5.pdf16 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf16 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200238078586_For_Asset_Based_Search_24_05_2022_21_15_02_111.pdf24 May 2022
Declaration about Commencement CertificateFile: Form D.pdf5 Jan 2022
Disclosure of sold/ booked inventoryFile: Scaned Doc AT- 1_11zon.pdf21 Dec 2021
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory-K Sq Balewadi -sep-21.pdf16 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A-K-SQUARE BALEWADI-MARCH-20.pdf30 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A-K-SQUARE BALEWADI-MARCH-19.pdf30 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-K-SQUARE BALEWADI-MARCH-21.pdf30 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A-K SQUARE BALEWADI-JUNE-21.pdf30 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 RERA-compressed.pdf18 Aug 2021
Certificates of CA (Form 3)File: K Square Balewadi Pune_Fom-3_June19.pdf15 Aug 2021
Certificates of CA (Form 3)File: K Square Balewadi Pune_Form-3_Dec20.pdf15 Aug 2021
Certificates of CA (Form 3)File: K Square Balewadi Pune_Form-3_June20.pdf15 Aug 2021
Certificates of CA (Form 3)File: K Square Balewadi Pune_Form-3_June21.pdf15 Aug 2021
Certificates of CA (Form 3)File: K Square -Balewadi Pune_Form-3_March21.pdf15 Aug 2021
Certificates of CA (Form 3)File: K Square Balewadi_Form-3_March20.pdf15 Aug 2021
Certificates of CA (Form 3)File: K Square Balewadi Pune_Form-3_Sep20.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: K Square Balewadi_Form-5_March19.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: K Square Balewadi_Form-5_March20.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: K Square Balewadi_Form-5_March21.pdf15 Aug 2021
OtherFile: Pune OC.pdf17 Nov 2018
Certificates of CA (Form 5)File: FORM 5 ANKIT PUNE.pdf15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate ND_pune.pdf25 Apr 2018
Certificates of CA (Form 3)File: CA CERTIFICATE PUNE JAN18_RERA.pdf6 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certificate pune-ilovepdf-compressed.pdf13 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certificate pune-ilovepdf-compressed.pdf13 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certificate pune-ilovepdf-compressed.pdf13 Jan 2018
Certificates of CA (Form 3)File: CA Certificate aC PUNE.pdf13 Jan 2018
Certificates of CA (Form 3)File: CA Certificate aC PUNE.pdf13 Jan 2018
Proforma of Allotment letterFile: RERA Agreement.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment letter.pdf31 Jul 2017
OtherFile: Disclosure.pdf31 Jul 2017
Layout approvalFile: LAYOUT.pdf30 Jul 2017
Layout approvalFile: BUILDING PERMIT.PDF30 Jul 2017
Building plan approvalFile: BUILDING PERMIT.PDF30 Jul 2017
PAN CardFile: PANCARD ANKIT CONSTRUCTION1.pdf30 Jul 2017
Copy of the legal title reportFile: TITLE REPORT-PUNE.pdf30 Jul 2017
Details of encumbrancesFile: project details_1.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: BUILDING PERMIT.PDF30 Jul 2017
Building Plan Approval (IOD)File: BUILDING PERMIT.PDF30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMIT.PDF30 Jul 2017
Declaration in FORM BFile: form B SANDEEP SIR.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
K-SQUARE APARTMENTSSOMALWADA NAGPUR82CompletedSep 2019Late, Dec 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep K-SQUARE-BALEWADI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pune13,700+ in Pune

2 kmK-SQUARE-BALEWADICompleted 133Lapsed / revoked 46Other 123Dot size: filed unitsN

Filed coordinates, straight-line distance. 302 registered projects within 2 km.

Builder: ANKIT CONSTRUCTION

ANKIT CONSTRUCTION has 3 registrations on MahaRERA, including K-SQUARE APARTMENTS and K-SQUARE-BALEWADI. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if K-SQUARE-BALEWADI is delayed beyond 30 May 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of K-SQUARE-BALEWADI?

The registered promoter entity is ANKIT CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in K-SQUARE-BALEWADI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against K-SQUARE-BALEWADI?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for K-SQUARE-BALEWADI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at K-SQUARE-BALEWADI?

The professionals named in the filing: Architect: PARESH KOSHTI; Engineer: SATISH MARATHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in K-SQUARE-BALEWADI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K-SQUARE-BALEWADI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K-SQUARE-BALEWADI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.