ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / K K RENUKA RESIDENCY A AND B WING

Completed No litigation declared Residential / Group Housing project

K K RENUKA RESIDENCY A AND B WING

By MADHU KACHHARAM ACHHRA HUF

RG-MH-03441 · RERA P51700021714 · Last updated on MahaRERA portal: 27 Jan 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
15 of 22Construction stages doneacross 2 buildings; furthest along: External plumbing and external plaster, 95%
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

K K RENUKA RESIDENCY A AND B WING is a Residential / Group Housing project by MADHU KACHHARAM ACHHRA HUF in Thane, Maharashtra, registered with MahaRERA as P51700021714 on 19 Jul 2019. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameK K RENUKA RESIDENCY A AND B WING
  • TypeResidential / Group Housing
  • Location
    • S NO 143 H NO 7
    • CHIKHLOLI VILLAGE
    • AMBERNATH WEST
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700021714
  • ReraGenie IDRG-MH-03441

Builder

  • NameMADHU KACHHARAM ACHHRA HUF
  • Entity typeOthers
  • Named personsMADHU K ACHHRA, AMIT M ACHHRA, SANTOSH MADHAVDAS ACHHRA

Key dates

this monthRegisteredJul 2019PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Jul 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA50000
WING BNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

WING A81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,080 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHREE AYYAPPA CONSTRUCTIONSAmbarnath(M Cl)Thane

Approvals and building plan

Permissible FSI1294.89
Proposed, not sanctioned1,295 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANTINAGAR, ULHASNAGAR , ULHASNAGAR 421003 MAHARASHTRA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectU K ASSOCIATES
EngineerSHIVAJI G PATIL
Chartered AccountantVIKAS KAMRA
PartnerRole in project
MADHU KACHHARAM ACHHRA HUF-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jan 2022

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 fy 2122 signed madhu achhra huf.pdf27 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: rera form 5 madhu achhra HUF fy 2021 to upload.pdf8 Apr 2022
Architect’s Certificate on Completion of Project (Form 4)File: form 4 kk renuka.pdf28 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: occupancy certificate A and B wing.pdf5 Jan 2022
Declaration about Commencement CertificateFile: 1DECLARATIONOFCOMMENCEMENT.pdf1 Dec 2021
Form 2AFile: 4Form2A_24112021.pdf1 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 form 1 architect 30092021.pdf2 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 FORM 2 30092021 signed.pdf2 Nov 2021
Form 2AFile: 3 Form 2A 30092021 signed.pdf2 Nov 2021
Disclosure of sold/ booked inventoryFile: 5 Disclosure_of_Booked_Inventory.pdf2 Nov 2021
Certificates of CA (Form 3)File: 4 from 3 30092021.pdf2 Nov 2021
Form 2AFile: Form 2A quality certificate 30062021.pdf31 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 architect certificate 30062021.pdf29 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 engineer certificate 30062021.pdf29 Jul 2021
Certificates of CA (Form 3)File: Form 3 CA cert Wing A and B 30062021.pdf29 Jul 2021
Layout approvalFile: Revised approved plan.pdf12 Jun 2021
Copy of Layout Approval (in case of layout)File: Revised approved plan.pdf12 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf12 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 form 1 310321.pdf8 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 310321.pdf8 May 2021
Form 2AFile: 3 Form 2A 31032021.pdf8 May 2021
Certificates of CA (Form 3)File: 4 Form 3 31032021.pdf8 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 31122020 signed.pdf13 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31122020.pdf13 Feb 2021
Form 2AFile: form 2A 31122020.pdf13 Feb 2021
Certificates of CA (Form 3)File: form 3 31122020 signed.pdf13 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Madhu Aachara HUF FORM 5.pdf6 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 21092020-1.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2A 30092020.pdf23 Nov 2020
Form 2AFile: Form 2 2A 30092020.pdf23 Nov 2020
Certificates of CA (Form 3)File: form 3 rera 30092020.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf16 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Form 2 Certificates of Engineer.pdf16 Oct 2019
Form 2AFile: 2 Form 2A engineer.pdf16 Oct 2019
Certificates of CA (Form 3)File: form 3 CA mk achhra.pdf16 Oct 2019
Building plan approvalFile: 18 LAYOUT APPROVAL PLAN.pdf19 Jul 2019
Building Plan Approval (IOD)File: 18 LAYOUT APPROVAL PLAN.pdf19 Jul 2019
Layout approvalFile: 18 LAYOUT APPROVAL PLAN.pdf16 Jun 2019
Building plan approvalFile: 14 CC.pdf16 Jun 2019
PAN CardFile: 2 PAN CARD KARTA N CO PARCNERS.PDF16 Jun 2019
Copy of the legal title reportFile: 12 Legal Title report.pdf16 Jun 2019
Details of encumbrancesFile: 12 Legal Title report.pdf16 Jun 2019
Copy of Layout Approval (in case of layout)File: 18 LAYOUT APPROVAL PLAN.pdf16 Jun 2019
Building Plan Approval (IOD)File: 14 CC.pdf16 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: 14 CC.pdf16 Jun 2019
Declaration in FORM BFile: 1 FORM B MADHU ACHHRA.pdf16 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 architect certficate.pdf16 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 architect certficate.pdf16 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 form 2.pdf16 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 form 2 annexures.pdf16 Jun 2019
Form 2AFile: 12 form 2A.pdf16 Jun 2019
Certificates of CA (Form 3)File: 16 RERA FORM 3 CA.PDF16 Jun 2019
Proforma of Allotment letterFile: 14 Allotment Letter and Agreement to Sale.pdf16 Jun 2019
OtherFile: 1ST FLR.pdf16 Jun 2019
OtherFile: 2nd flr.pdf16 Jun 2019
OtherFile: 3RD FLR.pdf16 Jun 2019
OtherFile: 4TH FLR.pdf16 Jun 2019
OtherFile: sections.pdf16 Jun 2019
OtherFile: terrace flr.pdf16 Jun 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep K K RENUKA RESIDENCY A AND B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBERNATH WEST7,600+ in Thane

2 kmK K RENUKA RESIDENCY A ACompleted 77Lapsed / revoked 42Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 157 registered projects within 2 km.

Builder: MADHU KACHHARAM ACHHRA HUF

MADHU KACHHARAM ACHHRA HUF has 1 registration on MahaRERA, including K K RENUKA RESIDENCY A AND B WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if K K RENUKA RESIDENCY A AND B WING is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of K K RENUKA RESIDENCY A AND B WING?

The registered promoter entity is MADHU KACHHARAM ACHHRA HUF, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in K K RENUKA RESIDENCY A AND B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for K K RENUKA RESIDENCY A AND B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at K K RENUKA RESIDENCY A AND B WING?

The professionals named in the filing: Architect: U K ASSOCIATES; Engineer: SHIVAJI G PATIL; Chartered Accountant: VIKAS KAMRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in K K RENUKA RESIDENCY A AND B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K K RENUKA RESIDENCY A AND B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K K RENUKA RESIDENCY A AND B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.