ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / JVMS ACCORD

Completed No litigation declared Others project

JVMS ACCORD

By JVM SPACES

RG-MH-30079 · RERA P51700029725 · Last updated on MahaRERA portal: 15 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

JVMS ACCORD is a Others project by JVM SPACES in Thane, Maharashtra, registered with MahaRERA as P51700029725 on 26 Jun 2021. The registration is recorded completed; possession was promised by 31 Mar 2025.

At a glance

Project

  • NameJVMS ACCORD
  • TypeOthers
  • Location
    • Dhokali
    • Thane West
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • RERA no.P51700029725
  • ReraGenie IDRG-MH-30079

Builder

  • NameJVM SPACES
  • Entity typePartnership
  • PartnersNimit Jitendra Mehta, Manthan Jitendra Mehta
  • Other registrations4 more →
  • Completed4 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2021PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Jun 2021
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building -ANA250000
Building -BNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Building -A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building -B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50
BuildingClosed/CoveredTotal
Building -A2525
Building -B2525

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,990 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI20915.0
Proposed, not sanctioned5,895 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchARIZONA BLDG, SHOP NO-5, OPP KISHIN LEELA TOWER, NATH PAI R HARDASWADI, KOPRI COLONY, THANE E

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
JVM SPACES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Mar 2025

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for15 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: JVM ACcord Full OC.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord as on 31-12-2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Accord as on 31-12-2024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 JVM Accord as on Sep 2024_11zon.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord as on 30th September 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Accord as on Sep 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Accord June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord as on 30th June 2024_compressed.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - JVMS Accord as on June 2024.pdf10 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: JVMS Accord Rera Declaration.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - JVMS Accord as on March 2024.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Accord March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord as on 31st March 2024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JVM Accord Form -1.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Accord Dec 23.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord as on 31st December 2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - JVM Accord as on Dec 2023.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- JVMS Accord as on 30-06-2023.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- JVMS Accord as on 30th September 2023.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord as on 30th September 2023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- JVMS Accord as on 30-09-2023.pdf5 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - JVMS Accord as on 2022-23.pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- JVMS Accord as on 30-06-2023.pdf21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- JVMS Accord as on 31-12-2022.pdf22 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- JVMS Accord as on 31-03-2023.pdf22 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- JVMS Accord as on 31-12-2022.pdf22 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- JVMS Accord as on 31-03-2023.pdf22 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- JVMS Accord as on September 2022.pdf20 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord 30th September 22.pdf20 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- JVMS Accord.pdf14 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 135.pdf30 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Accord -30 June 2022.pdf19 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord 30th June 22_compressed.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_JVMS_Accord__1_11_Mar_2022 (1).pdf1 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - JVMS Accord -31st March 2022_compressed.pdf23 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord 31-03-2022_compressed.pdf23 May 2022
Details of encumbrancesFile: Encumbrance Letter dt.pdf21 Apr 2022
Declaration in FORM BFile: Form B_compressed.pdf21 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 JVMS_compressed.pdf21 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 JVMS Corner Stone Dec 2021.pdf21 Mar 2022
CERSAI detailsFile: JVMS Accord.pdf21 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord 31st Dec 2021.pdf21 Mar 2022
Declaration about Commencement CertificateFile: Format D Jvm Accord.pdf9 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 JVMS Accord.pdf14 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 JVMS Accord June 2021_compressed.pdf14 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 JVMS Accord Sept 2021_compressed.pdf14 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord June 2021_compressed.pdf14 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord Sept 2021_compressed.pdf14 Feb 2022
Copy of the legal title reportFile: Legal Title report Accord.pdf18 Jan 2022
Layout approvalFile: HPSC0095_11zon.pdf4 Jan 2022
Building plan approvalFile: HPSC0096_11zon.pdf4 Jan 2022
Building plan approvalFile: HPSC0097_11zon.pdf4 Jan 2022
Building plan approvalFile: HPSC0098_11zon.pdf4 Jan 2022
Building plan approvalFile: HPSC0101_11zon.pdf4 Jan 2022
Building plan approvalFile: HPSC0102_11zon.pdf4 Jan 2022
Building plan approvalFile: HPSC0103_11zon.pdf4 Jan 2022
Building plan approvalFile: HPSC0104_11zon.pdf4 Jan 2022
Building plan approvalFile: HPSC0105_11zon.pdf4 Jan 2022
Copy of Layout Approval (in case of layout)File: HPSC0095_11zon.pdf4 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0096_11zon.pdf4 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0097_11zon.pdf4 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0098_11zon.pdf4 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0101_11zon.pdf4 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0102_11zon.pdf4 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0103_11zon.pdf4 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0104_11zon.pdf4 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: HPSC0105_11zon.pdf4 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Cc - JVMS Accord.pdf4 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Declaration.pdf11 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 JVMS Accord.pdf11 Jun 2021
Proforma of Allotment letterFile: Revised _FSA_RERA Balkum Property.pdf11 Jun 2021
Proforma of Allotment letterFile: Revised_Allotment Letter__Balkum Property.pdf11 Jun 2021
Layout approvalFile: PLAN MERGED - 1 -2.pdf9 Jun 2021
Building plan approvalFile: PLAN MERGED 3 -4 -5 -6.pdf9 Jun 2021
Building plan approvalFile: PLAN MERGED 7 -8 -10.pdf9 Jun 2021
PAN CardFile: JVM Spaces pan card.pdf9 Jun 2021
Copy of the legal title reportFile: downloa.pdf9 Jun 2021
Details of encumbrancesFile: To Whomsoever it may concern.pdf9 Jun 2021
Copy of Layout Approval (in case of layout)File: PLAN MERGED - 1 -2.pdf9 Jun 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SKY COURTSurvey No 100 30A and Survey No 100 26A1 GB Road Thane97CompletedJun 2022Jun 2022

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JVMS ACCORD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane West7,600+ in Thane

Builder: JVM SPACES

JVM SPACES has 5 registrations on MahaRERA, including SKY COURT and ALEXA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JVMS ACCORD is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JVMS ACCORD?

The registered promoter entity is JVM SPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JVMS ACCORD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JVMS ACCORD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in JVMS ACCORD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JVMS ACCORD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JVMS ACCORD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.