ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / JUNOMONETA - TRITON

Registered No litigation declared Residential / Group Housing project

JUNOMONETA - TRITON

By PALIKA INFRATECH LLP

RG-MH-32641 · RERA P51700080375 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2035Possession promisedno revision filed
10 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 0%
239 of 252Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 149 documents Report an error

JUNOMONETA - TRITON is a Residential / Group Housing project by PALIKA INFRATECH LLP in Thane, Maharashtra, registered with MahaRERA as P51700080375 on 29 May 2025. Possession is promised by 31 Dec 2035. 13 of the 252 units on this registration are recorded sold or booked, and 10 of 44 construction stages are filed complete.

At a glance

Project

  • NameJUNOMONETA - TRITON
  • TypeResidential / Group Housing
  • Location
    • BACKSIDE OF KALYAN RTO OFFICE
    • KALYAN WEST
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • RERA no.P51700080375
  • ReraGenie IDRG-MH-32641

Builder

  • NamePALIKA INFRATECH LLP
  • Entity typePartnership
  • PartnersPRAFUL HARIBHAI SENJALIA, KAUSHIKBHAI VALLABHBHAI SENJALIYA
  • Other registrations4 more →

Key dates

this monthRegisteredMay 2025PromisedDec 2035

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2025
  • Promised completion31 Dec 2035
  • Revised completionNone
  • Buildings4 building records
  • Documents filed149 files

Current status

5%13 of 252 units booked
6.6%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1 - WING A - LEONA151166066
BUILDING 1 - WING B - LIBRANA151142042
BUILDING 2 -WING A -VENUSNA13072072
BUILDING 2 - WING B - TAURUSNA13072072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.

BUILDING 1 - WING A - LEO9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 1 - WING B - LIBRA9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 2 -WING A -VENUS36%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 2 - WING B - TAURUS36%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed780

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots780
Closed/Covered780
BuildingClosed/CoveredTotal
BUILDING 1 - WING A - LEO192192
BUILDING 1 - WING B - LIBRA160160
BUILDING 2 -WING A -VENUS214214
BUILDING 2 - WING B - TAURUS214214

Land and ownership59

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area14,915 sq m
Land owned byThe promoter, with other names on the file
Named landowners59
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Aug 2025
LandownerVillageDistrict
SHYAM NAMDEV TAWARIKalyanThane
BABAN RAMA TAWARIKalyanThane
ARJUN RAMA TAWARIKalyanThane
DHAKLU RAMA TAWARIKalyanThane
GANESH RAMA TAWARIKalyanThane
CHANDRAKANT RAMA TAWARIKalyanThane
SITABAI RAMA TAWARIKalyanThane
ASHOK CHANDU TAWARIKalyanThane
MOHAN CHANDU TAWARIKalyanThane
GIRJABAI CHANDU TAWARIKalyanThane
VISHNU LAXMAN TAWARIKalyanThane
MEGHA PARSHURAM MHATREKalyanThane
ROSHAN RAMESH KENE TAWARIKalyanThane
DIPALI SATYWAN THALEKalyanThane
KAPIL GAJANAN KENEKalyanThane
RAJARAM VITHAL KENEKalyanThane
SHALIK KANHA TAWARIKalyanThane
GURUNATH KANHA TAWARIKalyanThane
PRALHAD KANHA TAWARIKalyanThane
BANDU KANHA TAWARIKalyanThane
GULAB RAJARAM DHUDHKARKalyanThane
LEELABAI ANANTA PATILKalyanThane
DAYABAI MHADU GAIKWADKalyanThane
VANITA ASHOK PATILKalyanThane
SANDHYA EKNATH TAWARIKalyanThane
SHIVAJI PANDU TAWARIKalyanThane
BHIVA PANDU TAWARIKalyanThane
NANDA PANDU TAWARIKalyanThane
KUSUM SHANTARAM PAWASHEKalyanThane
HOUSABAI BABAN GAIKWADKalyanThane
SHANVAR PANDU TAWARIKalyanThane
JAY ENTERPRISESKalyanThane
MANJULABAI GANESH BHOIRKalyanThane
VIDYA DAYANAND PATILKalyanThane
USHA GOPINATH MHATREKalyanThane
VAISHALI SANJAY CHAUDHARIKalyanThane
ASHA TUKARAM PATILKalyanThane
NANDA SITARAM MHATREKalyanThane
ANIL SITARAM MHATREKalyanThane
BARKI SITARAM MHATREKalyanThane
ANITA GAJANAN KENEKalyanThane
SAYALI SHANIVAR TAWAREKalyanThane
SANKHARAM KRUSHNA TAWARIKalyanThane
HARSHAL SHANIVAR TAWAREKalyanThane
SHUBHANGI SHANIVAR TAWAREKalyanThane
SARIKA KARAN PATILKalyanThane
VANDANA SHANIVAR TAWAREKalyanThane
SUMAN DATTU PATILKalyanThane
SONABAI KRUSHNA TAWARIKalyanThane
DROUPADIBAI KANHA TAWARIKalyanThane
SALUBAI KRUSHNA TAWARIKalyanThane
BABAN GANPAT GAIKWADKalyanThane
SHANTARAM GANPAT GAIKWADKalyanThane
JAI EKNATH TAWARIKalyanThane
JAGRUTI EKNATH TAWARIKalyanThane
SUNITA KISHOR PATILKalyanThane
JAISHRI GAJANAN MHATREKalyanThane
KALUBAI KRUSHNA TAWARIKalyanThane
TAIBAI SADASHIV PATILKalyanThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI26462.17
Proposed, not sanctioned26,462 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.10-14,WHITE FIELD BUILDING GR.FLR,E-WING,FLOWER VALLEY COMPLEX KHADAKPADA, KALYAN WEST
Estimated costRs 393.29 cr
Cost incurredRs 26.12 cr
Work done6.64%
BuildingWingEstimatedIncurred
BUILDING 1 - WING A - LEONARs 90.69 crRs 8.26 lakh
BUILDING 1 - WING B - LIBRANARs 90.69 crRs 8.26 lakh
BUILDING 2 -WING A -VENUSNARs 90.69 crRs 12.98 cr
BUILDING 2 - WING B - TAURUSNARs 90.69 crRs 12.98 cr
-NARs 30.53 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVARGHESE JOHN
EngineerINFINITY CONSULTANTS
Chartered AccountantKAPIL KHANDELWAL & ASSOCIATES
Chartered AccountantMITHIL VINAY KHATAU & ASSOCIATES
PartnerRole in project
PALIKA INFRATECH LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2035

Documents filed149

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 TRITON.pdf12 May 2026
Withdrawal Update Form 2File: FORM 2 TRITON.pdf12 May 2026
Withdrawal Update Form 3File: FORM 3 TRITON.pdf12 May 2026
Withdrawal Update Form 1File: Architech Certificate Q3 -TRITON.pdf24 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Gauripada - TRITON 1 2.pdf24 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec-25 Triton.pdf24 Mar 2026
Withdrawal Update Form 1File: Architech Certificate Q3 -TRITON.pdf16 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Gauripada - TRITON 1 2.pdf16 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec-25 Triton.pdf16 Mar 2026
Withdrawal Update Form 1File: Form 1 Triton Sep-25 q2.pdf10 Mar 2026
Withdrawal Update Form 1File: Architech Certificate Q3 -TRITON.pdf10 Mar 2026
Withdrawal Update Form 1File: Architech Certificate Q3 -TRITON.pdf10 Mar 2026
Withdrawal Update Form 2File: Form 2 For Correction.pdf10 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Gauripada - TRITON 1 2.pdf10 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Gauripada - TRITON 1 2.pdf10 Mar 2026
Withdrawal Update Form 3File: Form 3 (2).pdf10 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec-25 Triton.pdf10 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec-25 Triton.pdf10 Mar 2026
Withdrawal Update Form 1File: Form 1 Triton Sep-25 q2.pdf10 Jan 2026
Withdrawal Update Form 2File: Form 2 For Correction.pdf10 Jan 2026
Withdrawal Update Form 3File: Form 3 (2).pdf10 Jan 2026
Withdrawal Update Form 1File: Form 1 TRITON Q1.pdf22 Nov 2025
Withdrawal Update Form 1File: Form 1 Triton Sep-25 q2.pdf22 Nov 2025
Withdrawal Update Form 2File: Triton Q1 new Format.pdf22 Nov 2025
Withdrawal Update Form 2File: Triton Q2 New Format.pdf22 Nov 2025
Withdrawal Update Form 3File: Form 3 Triton Q1.pdf22 Nov 2025
Withdrawal Update Form 3File: Form 3 Triton Q2.pdf22 Nov 2025
Other - LegalFile: ilovepdf_merged (53).pdf23 May 2025
Other - LegalFile: ilovepdf_merged (52).pdf23 May 2025
Other - LegalFile: 20250523074024 (1).pdf23 May 2025
Other - FinanceFile: Triton Self Declaration 5-4-25 (1)_compressed.pdf8 Apr 2025
Other - FinanceFile: TRITON Self Declaration 31-3-25_compressed (1).pdf2 Apr 2025
Other - FinanceFile: Allotment of units to landowner_compressed.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Updated.pdf4 Mar 2025
Other - LegalFile: Allotment of units to landowner_compressed.pdf1 Mar 2025
Other - FinanceFile: Allotment of units to landowner_compressed.pdf1 Mar 2025
Other - FinanceFile: Clarification type of agreement.pdf1 Mar 2025
Other - LegalFile: 8444 46-8_part_2.pdf28 Feb 2025
Other - LegalFile: 8444 46-8_part_3.pdf28 Feb 2025
Other - LegalFile: 8444 46-8_part_4.pdf28 Feb 2025
Other - LegalFile: 12554 46-8_part_ 1.pdf28 Feb 2025
Other - LegalFile: 13541_38-1-C_part_1.pdf28 Feb 2025
Other - LegalFile: 13541_38-1-C_part_ 2.pdf28 Feb 2025
Other - LegalFile: 13541_38-1-C_part_3.pdf28 Feb 2025
Other - LegalFile: 13541_38-1-C_part_4.pdf28 Feb 2025
Other - LegalFile: 13541_38-1-C_part_5.pdf28 Feb 2025
Other - LegalFile: 13541_38-1-C_part_6_compressed.pdf28 Feb 2025
Other - LegalFile: 13541_38-1-C_part_ 7.pdf28 Feb 2025
Other - LegalFile: 16039_38-1-C 1-pdf.pdf28 Feb 2025
Other - LegalFile: 16039_38-1-C 2-pdf.pdf28 Feb 2025
Other - LegalFile: 16039_38-1-C 3-pdf.pdf28 Feb 2025
Other - LegalFile: 16039_38-1-C 4-pdf.pdf28 Feb 2025
Other - LegalFile: 16039_38-1-C 5-pdf.pdf28 Feb 2025
Other - LegalFile: 16039_38-1-C 6-pdf_merged.pdf28 Feb 2025
Other - LegalFile: 18062 46-1-A 1-pdf.pdf28 Feb 2025
Other - LegalFile: 18062 46-1-A 2-pdf.pdf28 Feb 2025
Other - LegalFile: 18062 46-1-A 3-pdf.pdf28 Feb 2025
Other - LegalFile: 18062 46-1-A 4-pdf.pdf28 Feb 2025
Other - LegalFile: 18062 46-1-A 5-pdf.pdf28 Feb 2025
Other - LegalFile: 18062 46-1-A 6-pdf.pdf28 Feb 2025
Other - LegalFile: 18062 46-1-A 7-pdf.pdf28 Feb 2025
Other - LegalFile: 18062 46-1-A 8-pdf.pdf28 Feb 2025
Other - LegalFile: 18063_46-1-A 1-pdf.pdf28 Feb 2025
Other - LegalFile: 18063_46-1-A 2-pdf.pdf28 Feb 2025
Other - LegalFile: 18063_46-1-A 3-pdf.pdf28 Feb 2025
Other - LegalFile: 18063_46-1-A 4-pdf.pdf28 Feb 2025
Other - LegalFile: 18063_46-1-A 5-pdf.pdf28 Feb 2025
Other - LegalFile: 18063_46-1-A 6-pdf_compressed (1).pdf28 Feb 2025
Other - LegalFile: 18063_46-1-A 7-pdf.pdf28 Feb 2025
Other - LegalFile: 18063_46-1-A 8-pdf.pdf28 Feb 2025
Other - LegalFile: 8647 38-1-C 1.pdf28 Feb 2025
Other - LegalFile: 8647 38-1-C 2.pdf28 Feb 2025
Other - LegalFile: Clarification for UPLOAD.pdf28 Feb 2025
Layout approvalFile: 5 Copy of Layout Approval (in case of layout).pdf27 Feb 2025
Copy of Layout Approval (in case of layout)File: 5 Copy of Layout Approval (in case of layout).pdf27 Feb 2025
Other - LegalFile: 8444 46-8_part_1.pdf27 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Palika Infratech LLP CC compressed.pdf25 Feb 2025
Deviation Report with respect to model copy of AgreementFile: Devaition Sheet Agreement for Sale.pdf14 Feb 2025
Other - LegalFile: Declaration Regarding Agreement with Landowners_11zon.pdf3 Feb 2025
Proforma of Agreement for saleFile: Flat_Sale_Agreement__TRITON_RERA.pdf3 Feb 2025

How this compares with Thane

5%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JUNOMONETA - TRITON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALYAN WEST7,600+ in Thane

Builder: PALIKA INFRATECH LLP

PALIKA INFRATECH LLP has 5 registrations on MahaRERA, including JUNOMONETA - JUPITER and JUNOMONETA - TRITON. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JUNOMONETA - TRITON is delayed beyond 31 Dec 2035?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JUNOMONETA - TRITON?

The registered promoter entity is PALIKA INFRATECH LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JUNOMONETA - TRITON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JUNOMONETA - TRITON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JUNOMONETA - TRITON?

The professionals named in the filing: Architect: VARGHESE JOHN; Engineer: INFINITY CONSULTANTS; Chartered Accountant: KAPIL KHANDELWAL & ASSOCIATES; Chartered Accountant: MITHIL VINAY KHATAU & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JUNOMONETA - TRITON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JUNOMONETA - TRITON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JUNOMONETA - TRITON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.