ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / JUNOMONETA - APOLLO

Registered No litigation declared Others project

JUNOMONETA - APOLLO

By PALIKA INFRATECH LLP

RG-MH-44084 · RERA P51700080751 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
62 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

JUNOMONETA - APOLLO is a Others project by PALIKA INFRATECH LLP in Thane, Maharashtra, registered with MahaRERA as P51700080751 on 3 Jul 2025. Possession is promised by 31 Dec 2031. 0 of the 62 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameJUNOMONETA - APOLLO
  • TypeOthers
  • Location
    • Ground Floor 38/1/C
    • 38/7/B/2
    • 38/7/C/1
    • 45/1/2
    • 46/1/A
    • 46/2
    • 46/3/A
    • 46/7
    • 46/8 & 46/9 Back side of Kalyan RTO office & Birla School Road
    • Near Triveni...
  • Pincode421301
  • RERA no.P51700080751
  • ReraGenie IDRG-MH-44084

Builder

  • NamePALIKA INFRATECH LLP
  • Entity typePartnership
  • Designated PartnersARPIT SURESHCHANDRA KHANDELWAL, RAMESH KESHUBHAI SIYANI
  • Other registrations4 more →

Key dates

this monthRegisteredJul 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jul 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed119 files

Current status

0%0 of 62 units booked
0.9%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 4 - APOLLO NA151556662

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

BUILDING NO 4 - APOLLO: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed113

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots113
Closed/Covered113

Land and ownership59

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area984 sq m
Land owned byThe promoter, with other names on the file
Named landowners59
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Aug 2025
LandownerVillageDistrict
SHANTARAM GANPAT GAIKWADKalyanThane
TAIBAI SADASHIV PATILKalyanThane
LEELABAI ANANTA PATILKalyanThane
GULAB RAJARAM DHUDHKARKalyanThane
SUMAN DATTU PATILKalyanThane
SONABAI KRUSHNA TAWARIKalyanThane
DROUPADIBAI KANHA TAWARIKalyanThane
SALUBAI KRUSHNA TAWARIKalyanThane
BABAN GANPAT GAIKWADKalyanThane
SAYALI SHANIVAR TAWAREKalyanThane
SANKHARAM KRUSHNA TAWARIKalyanThane
HARSHAL SHANIVAR TAWAREKalyanThane
SHUBHANGI SHANIVAR TAWAREKalyanThane
SARIKA KARAN PATILKalyanThane
VANDANA SHANIVAR TAWAREKalyanThane
KALUBAI KRUSHNA TAWARIKalyanThane
SHALIK KANHA TAWARIKalyanThane
GURUNATH KANHA TAWARIKalyanThane
PRALHAD KANHA TAWARIKalyanThane
BANDU KANHA TAWARIKalyanThane
JAI EKNATH TAWARIKalyanThane
JAGRUTI EKNATH TAWARIKalyanThane
SHYAM NAMDEV TAWARIKalyanThane
JAISHRI GAJANAN MHATREKalyanThane
BABAN RAMA TAWARIKalyanThane
ARJUN RAMA TAWARIKalyanThane
DHAKLU RAMA TAWARIKalyanThane
GANESH RAMA TAWARIKalyanThane
CHANDRAKANT RAMA TAWARIKalyanThane
SITABAI RAMA TAWARIKalyanThane
SHIVAJI PANDU TAWARIKalyanThane
BHIVA PANDU TAWARIKalyanThane
NANDA PANDU TAWARIKalyanThane
KUSUM SHANTARAM PAWASHEKalyanThane
HOUSABAI BABAN GAIKWADKalyanThane
SHANVAR PANDU TAWARIKalyanThane
ASHOK CHANDU TAWARIKalyanThane
MOHAN CHANDU TAWARIKalyanThane
GIRJABAI CHANDU TAWARIKalyanThane
VISHNU LAXMAN TAWARIKalyanThane
MEGHA PARSHURAM MHATREKalyanThane
ROSHAN RAMESH KENE TAWARIKalyanThane
MANJULABAI GANESH BHOIRKalyanThane
VIDYA DAYANAND PATILKalyanThane
USHA GOPINATH MHATREKalyanThane
VAISHALI SANJAY CHAUDHARIKalyanThane
ASHA TUKARAM PATILKalyanThane
NANDA SITARAM MHATREKalyanThane
ANITA GAJANAN KENEKalyanThane
DIPALI SATYWAN THALEKalyanThane
KAPIL GAJANAN KENEKalyanThane
RAJARAM VITTHAL KENEKalyanThane
JAY ENTERPRISESKalyanThane
ANIL SITARAM MHATREKalyanThane
BARKI SITARAM MHATREKalyanThane
DAYABAI MHADU GAIKWADKalyanThane
SUNITA KISHOR PATILKalyanThane
VANITA ASHOK PATILKalyanThane
SANDHYA EKNATH TAWARIKalyanThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI4011.7
Proposed, not sanctioned4,012 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Wasan Automobiles Guru Gobind House, Opp. Purnima Theatre, Murbad Road, Kalyan West.421301
Estimated costRs 17.13 cr
Cost incurredRs 14.89 lakh
Work done0.87%
BuildingWingEstimatedIncurred
BUILDING NO 4 - APOLLONARs 14.75 crRs 14.89 lakh
-NARs 2.38 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVARGHESE JOHN
EngineerInfinity consultants
Chartered AccountantMithil Vinay Khatau & Associates
PartnerRole in project
PALIKA INFRATECH LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 APOLLO.pdf12 May 2026
Withdrawal Update Form 2File: APOLLO FORM 2.pdf12 May 2026
Withdrawal Update Form 3File: FORM 3 APOLLO.pdf12 May 2026
Layout approvalFile: SHEET 1 of 12.PDF17 Mar 2026
Layout approvalFile: Sheet 12 of 12 Pluto and Apollo.PDF17 Mar 2026
Building plan approvalFile: SHEET 1 of 12.PDF17 Mar 2026
Building plan approvalFile: Sheet 12 of 12 Pluto and Apollo.PDF17 Mar 2026
Withdrawal Update Form 1File: Architech Certificate Q3 - Apollo.pdf12 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Gauripada - Apollo.pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec-25 Apollo.pdf12 Mar 2026
Withdrawal Update Form 1File: Architech Certificate Q3 - Apollo.pdf11 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Gauripada - Apollo.pdf11 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec-25 Apollo.pdf11 Mar 2026
Withdrawal Update Form 1File: Architech Certificate Q3 - Apollo.pdf13 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Gauripada - Apollo.pdf13 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec-25 Apollo.pdf13 Feb 2026
Withdrawal Update Form 1File: Form 1 Apollo Sep-25 Q2.pdf14 Nov 2025
Withdrawal Update Form 2File: Apollo Q2.pdf14 Nov 2025
Withdrawal Update Form 3File: Form 3 Apollo Q2.pdf14 Nov 2025
Other - LegalFile: 64 Other - Legal (1).pdf13 Jun 2025
Details of encumbrances concerned to FinanceFile: Legal Encumbrances Apollo (1).pdf12 Jun 2025
Other - LegalFile: 63 Other - Legal.pdf12 Jun 2025
Details of encumbrances concerned to LegalFile: Legal Encumbrances Apollo (1).pdf12 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: cc extension.pdf16 May 2025
Declaration in FORM BFile: Apollo Form B (1).pdf13 May 2025
Other - LegalFile: 16039 4th part.pdf13 May 2025
Other - LegalFile: 16039 6th part.pdf13 May 2025
Other - LegalFile: 18062 1st part.pdf13 May 2025
Other - LegalFile: 18062 2nd part.pdf13 May 2025
Other - LegalFile: 18062 3rd part.pdf13 May 2025
Other - LegalFile: 18062 4th part.pdf13 May 2025
Other - LegalFile: 18062 5th part.pdf13 May 2025
Other - LegalFile: 18062 6th part.pdf13 May 2025
Other - LegalFile: 18062 7th part.pdf13 May 2025
Other - LegalFile: 18062 8th part.pdf13 May 2025
Other - LegalFile: 18063 1st part.pdf13 May 2025
Other - LegalFile: 18063 2nd part.pdf13 May 2025
Other - LegalFile: 18063 3rd part.pdf13 May 2025
Other - LegalFile: 18063 4th part.pdf13 May 2025
Other - LegalFile: 18063 5th part.pdf13 May 2025
Other - LegalFile: 18063 6th part.pdf13 May 2025
Other - LegalFile: 18063 7th part.pdf13 May 2025
Other - LegalFile: 18063 8th part.pdf13 May 2025
Other - LegalFile: 8647 2nd part.pdf13 May 2025
Other - LegalFile: 16039 5th part.pdf13 May 2025
Other - LegalFile: 8444 1st part.pdf13 May 2025
Other - LegalFile: 8444 2nd part.pdf13 May 2025
Other - LegalFile: 8444 3rd part.pdf13 May 2025
Other - LegalFile: 8444 4th part.pdf13 May 2025
Other - LegalFile: 8647 1st part.pdf13 May 2025
Other - LegalFile: 12554 1st part.pdf13 May 2025
Other - LegalFile: 13541 1st part.pdf13 May 2025
Other - LegalFile: 13541 2nd part.pdf13 May 2025
Other - LegalFile: 13541 3rd part.pdf13 May 2025
Other - LegalFile: 13541 4th part.pdf13 May 2025
Other - LegalFile: 13541 5th part.pdf13 May 2025
Other - LegalFile: 13541 6th part.pdf13 May 2025
Other - LegalFile: 13541 7th part.pdf13 May 2025
Other - LegalFile: 16039 1st part.pdf13 May 2025
Other - LegalFile: 16039 2nd part.pdf13 May 2025
Other - LegalFile: 16039 3rd part.pdf13 May 2025
Other - FinanceFile: Clarification regarding area share- 5 Projects (1).pdf13 May 2025
PAN CardFile: Company Pancard.pdf12 May 2025
Details of encumbrances concerned to FinanceFile: encumberance.pdf12 May 2025
Commencement Certificates / NA Order for plotted developmentFile: 3 Commencement Certificates _ NA Order for plotted development.pdf12 May 2025
CERSAI detailsFile: cersai (7).pdf12 May 2025
Details of encumbrances concerned to LegalFile: encumberance.pdf12 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: secured finance.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: APOLLO_11zon_merged UPLOAD.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: APOLO- Engineers Certificate.pdf1 May 2025
Other - FinanceFile: APOLLO- Self declaration for Rera bank ac_R cOMPRESS.pdf1 May 2025
Deviation Report with respect to model copy of AgreementFile: APOLLO DEVIATION COMPRESSED.pdf1 May 2025
Layout approvalFile: SHEET 10.pdf30 Apr 2025
Layout approvalFile: SHEET 1_11zon.pdf30 Apr 2025
Building plan approvalFile: SHEET 9.pdf30 Apr 2025
Building plan approvalFile: SHEET 10.pdf30 Apr 2025
Building plan approvalFile: SHEET 1_11zon.pdf30 Apr 2025
Copy of the legal title reportFile: 01 Title 38-1-C revised.pdf30 Apr 2025
Copy of the legal title reportFile: 10 Sr No 46-9.pdf30 Apr 2025
Copy of the legal title reportFile: 09 Title 46-8 revised.pdf30 Apr 2025

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JUNOMONETA - APOLLO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GAURIPADA, KALYAN WEST7,600+ in Thane

Builder: PALIKA INFRATECH LLP

PALIKA INFRATECH LLP has 5 registrations on MahaRERA, including JUNOMONETA - JUPITER and JUNOMONETA - TRITON. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JUNOMONETA - APOLLO is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JUNOMONETA - APOLLO?

The registered promoter entity is PALIKA INFRATECH LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JUNOMONETA - APOLLO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JUNOMONETA - APOLLO?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JUNOMONETA - APOLLO?

The professionals named in the filing: Architect: VARGHESE JOHN; Engineer: Infinity consultants; Chartered Accountant: Mithil Vinay Khatau & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JUNOMONETA - APOLLO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JUNOMONETA - APOLLO. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JUNOMONETA - APOLLO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.