Completed No litigation declared Others project

JP North Celeste

By JP Infra (Mumbai) Pvt. Ltd.

RG-MH-26958 · RERA P51700008667 · Last updated on MahaRERA portal: 14 Jan 2022

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

JP North Celeste is a Others project by JP Infra (Mumbai) Pvt. Ltd. in Thane, Maharashtra, registered with MahaRERA as P51700008667 on 19 Aug 2017. The registration is recorded completed; possession was promised by 29 Dec 2020. The completion date has moved by 18 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameJP North Celeste
  • TypeOthers
  • Location
    • 18m DP Road
    • Mira Road
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700008667
  • ReraGenie IDRG-MH-26958

Builder

  • NameJP Infra (Mumbai) Pvt. Ltd.
  • Entity typeCompany
  • CINU45200MH2006PTC160428
  • GSTIN27AACCV2529A1ZP
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsVIJAYKUMAR OMPRAKASH JAIN, CHHAGANLAL KHAITAN
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseJun 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on19 Aug 2017
  • Promised completion29 Dec 2020
  • Revised completionRevised to 29 Dec 2020 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JP North CelesteNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

JP North Celeste: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 14 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Covered Parking Podium BuildingYes80%

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Closed/Covered133

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,510 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Sadanand Hajare & SPH Agro Farms & Estate Pvt LtdAndheriMumbai Suburban

Approvals and building plan

Permissible FSI14937.24
Proposed, not sanctioned14,937 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch30 Navyug Society Krishna Kunj V L Mehta Road Opp Sunflower Hospital JVPD Scheme Mumbai 400056

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajesh Khandeparkar of M/s Urbdes
EngineerUmesh Joshi of J+W Structural Consultants LLP
PartnerRole in project
J. P. INFRA (MUMBAI) PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700001979Jun 2019 → Jun 2020

Reason as filed by the promoterDear Sir, We, the Promoters of the said Project, have registered the same with the Maharashtra Real Estate Regulatory Authority and have been granted registration number “P51700008667”. A copy of the registration certificate, which is valid upto 30th June 2019, is annexed herewith for reference purposes. We would like to apply for extension of the registration of the Project under Section 6 of the Real Estate (Regulation and Development) Act, 2016 and the rules made thereunder. As per the provisions of the aforesaid section 6, the registration granted by this authority may be extended for a pe

Litigation declared1

CaseCourtStatus
SCS/178/2013/2013Thane CourtOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000000343MADHURI HANSARAJ PATILSadanand Hajare & SPH Agro Farms & Estate Pvt Ltd29/10/2017
CC006000000001545HIMANSHU DILIP TRIVEDISPH AGRO FARMS & ESTATE PVT LTD AND JP INFRA28/10/2017

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Feb 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Sep 2019

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Celeste.pdf14 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Certificate.pdf20 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: Celeste.pdf2 Mar 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Celeste_compressed.pdf12 Dec 2019
OtherFile: Occupation Certificate.pdf26 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf25 Sep 2019
Copy of the legal title reportFile: Second Supplemental Title Certificate.pdf24 Nov 2018
Declaration in FORM BFile: Form B Promoter.pdf24 Nov 2018
Proforma of Allotment letterFile: AFS.pdf24 Nov 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Extension letter.pdf24 Nov 2018
Certificates of CA (Form 5)File: Celeste.pdf30 Sep 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Celeste For Society Name Reservation Name and Bank Opening.pdf4 Jun 2018
Copy of the legal title reportFile: Supplemental Certificate Celeste 9th May 2018.pdf29 May 2018
Details of encumbrancesFile: Encumbrances - Celeste.pdf29 May 2018
Declaration in FORM BFile: Form B - JPIM - Project Celeste 16_05_2018_rotated-compressed.pdf29 May 2018
Proforma of Allotment letterFile: AFS R6_5 dated 18_5_2018.pdf29 May 2018
Details of encumbrancesFile: Detail of Encumbrances For JP North Celeste_rotated.pdf31 Mar 2018
Declaration in FORM BFile: Form B JPIMPL_rotated.pdf31 Mar 2018
Proforma of Allotment letterFile: AFS and Allotment Letter R6_2 Celeste 09_03_18.pdf31 Mar 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Society Formation statement.pdf31 Mar 2018
Layout approvalFile: Amended IOD Layout Date 12022018 compressed.pdf14 Feb 2018
Building plan approvalFile: Amended IOD_CC Date 12022018 compressed_rotated.pdf14 Feb 2018
Copy of Layout Approval (in case of layout)File: Amended IOD Layout Date 12022018 compressed.pdf14 Feb 2018
Building Plan Approval (IOD)File: Amended IOD_CC Date 12022018 compressed_rotated.pdf14 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: Amended IOD_CC Date 12022018 compressed_rotated.pdf14 Feb 2018
Proforma of Allotment letterFile: AFS and Allotment Letter R6_1 Celeste compressed.pdf14 Feb 2018
Proforma of Allotment letterFile: AFS and Allotment Letter 161117.pdf16 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Engineers certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: 9 CA Certificate Promoter.pdf30 Jul 2017
Layout approvalFile: 4 IOD plan.pdf29 Jul 2017
Building plan approvalFile: 13 IOD Letter.pdf29 Jul 2017
PAN CardFile: 1 PAN card of JPIMPL.pdf29 Jul 2017
Copy of the legal title reportFile: Title certificate.pdf29 Jul 2017
Details of encumbrancesFile: 3 Details of Encumbrances.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 4 IOD plan.pdf29 Jul 2017
Building Plan Approval (IOD)File: 13 IOD Letter.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 12 CC Letter.pdf29 Jul 2017
Declaration in FORM BFile: 6 Form B-JPIMPL.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 Architects Certificate.pdf29 Jul 2017
Certificates of CA (Form 3)File: 9 CA Certificate.pdf29 Jul 2017
Proforma of Allotment letterFile: 5 Allotment Letter and AFS.pdf29 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
JP DecksGeneral Arun Kumar Vaidya Marg Next to Dindoshi Court Malad East Mumbai 400097375CompletedDec 2019Mar 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JP North Celeste on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mira Road7,600+ in Thane

2 kmJP North CelesteCompleted 86Lapsed / revoked 66Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 232 registered projects within 2 km.

Builder: JP Infra (Mumbai) Pvt. Ltd.

JP Infra (Mumbai) Pvt. Ltd. has 4 registrations on MahaRERA, including JP Decks and JP North Celeste. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if JP North Celeste is delayed beyond 29 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JP North Celeste?

The registered promoter entity is JP Infra (Mumbai) Pvt. Ltd., a company as per the filing. Its CIN U45200MH2006PTC160428 and GSTIN 27AACCV2529A1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JP North Celeste?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JP North Celeste?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JP North Celeste?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JP North Celeste?

The professionals named in the filing: Architect: Rajesh Khandeparkar of M/s Urbdes; Engineer: Umesh Joshi of J+W Structural Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JP North Celeste?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JP North Celeste. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JP North Celeste to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.