Jitendra Heritage - E 2 Building - Phase - 1

By Jitendra Constructions

RG-MH-19968 · RERA P52100009234 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 88 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 88 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 86%
0 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 173 documents Report an error

Jitendra Heritage - E 2 Building - Phase - 1 is a Residential / Group Housing project by Jitendra Constructions in Pune, Maharashtra, registered with MahaRERA as P52100009234 on 22 Aug 2017. Possession is promised by 31 Dec 2030. The completion date has moved by 88 months from the original filing. 1 of the 1 unit on this registration is recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameJitendra Heritage - E 2 Building - Phase - 1
  • TypeResidential / Group Housing
  • Location
    • Pashan
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100009234
  • ReraGenie IDRG-MH-19968

Builder

  • NameJitendra Constructions
  • Entity typePartnership
  • PartnerJitendra Rajaram Sawant

Key dates

this monthRegisteredAug 2017First promiseAug 2023Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Aug 2017
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 28 Aug 2023)
  • Buildings1 building record
  • Documents filed173 files

Current status

100%1 of 1 units booked

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E 2NA70101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 86%.

E 2: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure86%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,544 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4960.9
Proposed, not sanctioned3,235 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAbasaheb Garware College Campus Karve Road Pune 411004

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerNikhil Shivaji Karande
PartnerRole in project
Jitendra Constructions-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017996Aug 2023 → Dec 2030

Reason as filed by the promoterAccess DP Road Not Yet Done

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed173

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 173 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Certificate Jitendra Heritage.pdf15 Apr 2026
Form 2File: Form 2 Engineer Certificate Jitendra H.pdf15 Apr 2026
Form 3File: Form 3 4th Qtr Jitendra Heritage.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unslod -Jitendra Heritage.pdf15 Apr 2026
Form 1File: Q3 Form 1 Archirect Certificate - Jitendra Heritage.pdf21 Jan 2026
Form 2File: Form 2 Engineer Certificate Jitendra H.pdf21 Jan 2026
Form 3File: Jitendra Heritage Form 3 Qtr 3.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Heritage Sold unsold.pdf21 Jan 2026
Form 2A (FY 2024-2025)File: Jitendra Heritage Form 2A Sign.pdf17 Dec 2025
Form 1File: Form 1 Architect Certificate Q2.pdf16 Oct 2025
Form 2File: Form 2 Engineer Certificate Q2.pdf16 Oct 2025
Form 3File: Form 3 CA Certificate Q2.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold, Unslod Inventory Pashan.pdf16 Oct 2025
Form 1File: Form 1 Architect Certificate - Jitendra Heritage.pdf22 Jul 2025
Form 2File: Form 2 Engineer Certificate Jitendra.pdf22 Jul 2025
Form 3File: From 3 CA Certificate Jitendra.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Jitendra Pashan site.pdf22 Jul 2025
Form 1File: Form 1 Architect Certificate - Jitendra Heritage.pdf22 Jul 2025
Form 2File: Form 2 Engineer Certificate Jitendra.pdf22 Jul 2025
Form 3File: From 3 CA Certificate Jitendra.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Jitendra Pashan site.pdf22 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q3 17-18.pdf9 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q4 17-18.pdf9 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q2 18-19.pdf9 May 2025
Certificates of CA (Form 3)File: No Progress Certificate Q3 17-18.pdf9 May 2025
Certificates of CA (Form 3)File: No Progress Certificate Q4 17-18.pdf9 May 2025
Certificates of CA (Form 3)File: No Progress Certificate Q2 18-19.pdf9 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: No Progress Certificate Q3 17-18.pdf9 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: No Progress Certificate Q4 17-18.pdf9 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: No Progress Certificate Q2 18-19.pdf9 May 2025
Certificates of CA (Form 5)File: form 5 2017-2018.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 2018-2019.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 2019-2020.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 2020-2021.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 2021-2022.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q3 17-18.pdf30 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q2 18-19.pdf30 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect 2024-25 Quarter 4.pdf30 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q3 17-18.pdf30 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q4 17-18.pdf30 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q2 18-19.pdf30 Apr 2025
Certificates of CA (Form 3)File: Q4 FY 2024-25 FORM 3 Chartered Accountant Certificate.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: No Progress Certificate Q4 17-18.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: No Progress Certificate Q3 17-18.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: No Progress Certificate Q4 17-18.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: No Progress Certificate Q2 18-19.pdf30 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY 2024-25 Quarter 4.pdf30 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q2 22-23.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q4 18-19.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q2 23-24.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q1 23-24.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q4 22-23.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q3 22-23.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q1 22-23.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q4 21-22.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q3 21-22.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q2 21-22.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q4 20-21.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q1 19-20.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q2 19-20.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q3 19-20.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q4 19-20.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q1 20-21.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q2 20-21.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q3 20-21.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: No Progress Certificate Q1 21-22.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q1 21-22.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q2 23-24.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q1 23-24.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q4 22-23.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q3 22-23.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q2 22-23.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q1 22-23.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q4 21-22.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q3 21-22.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q2 21-22.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q3 20-21.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q4 20-21.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q4 18-19.pdf23 Apr 2025
Certificates of CA (Form 3)File: No Progress Certificate Q1 19-20.pdf23 Apr 2025

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 88 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jitendra Heritage - E 2 Building - Phase - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pashan13,700+ in Pune

2 kmJitendra Heritage - E 2 Completed 6Lapsed / revoked 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: Jitendra Constructions

Jitendra Constructions has 1 registration on MahaRERA, including Jitendra Heritage - E 2 Building - Phase - 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Jitendra Heritage - E 2 Building - Phase - 1 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jitendra Heritage - E 2 Building - Phase - 1?

The registered promoter entity is Jitendra Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jitendra Heritage - E 2 Building - Phase - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jitendra Heritage - E 2 Building - Phase - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jitendra Heritage - E 2 Building - Phase - 1?

The professionals named in the filing: Engineer: Nikhil Shivaji Karande. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jitendra Heritage - E 2 Building - Phase - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jitendra Heritage - E 2 Building - Phase - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jitendra Heritage - E 2 Building - Phase - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.