Home / Browse projects / Raigarh, Maharashtra / Jindal Park

Completed No litigation declared Residential / Group Housing project

Jindal Park

By Simran Enterprises

RG-MH-78968 · RERA P52000047020 · Last updated on MahaRERA portal: 11 Apr 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

Jindal Park is a Residential / Group Housing project by Simran Enterprises in Raigarh, Maharashtra, registered with MahaRERA as P52000047020 on 26 Sep 2022. The registration is recorded completed; possession was promised by 31 Mar 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameJindal Park
  • TypeResidential / Group Housing
  • Location
    • Akurli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000047020
  • ReraGenie IDRG-MH-78968

Builder

  • NameSimran Enterprises
  • Entity typePartnership
  • PartnersSachin Omprakash Agarwal, Sagar Sachin Agarwal, Akash Sachin Agarwal
  • Other registrations4 more →
  • Completed5 of 5
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2022PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Sep 2022
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA50000
Building No 2NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building No 182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered16
Open Space11
BuildingClosed/CoveredOpen SpaceTotal
Building No 16511
Building No 210616

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,060 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3056.41
Proposed, not sanctioned3,056 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhoomiraj Costarica, Sanpada, Navi Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAN Arch Neha Jain
EngineerAdharshila Consultants (Mr.Samarth Agarwal)
Chartered AccountantMr. Vallabh Joshi
PartnerRole in project
Simran Enterprises-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12601172vinod krishnat waghSimran Enterprises03/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Oct 2024

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Jindal Park Soc registration Certificate.pdf11 Apr 2025
Architect’s Certificate on Completion of Project (Form 4)File: Jindal Park Form 4.pdf18 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Letter.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 A2 Q2 FY 24 25_compressed.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 A2 Q2 FY 24 25.pdf11 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Jindal Park.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 A2 Q2 FY 24 25_compressed.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 A2 FY 23 24_compressed.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jindal Park Q1 FY 24 25_compressed.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jindal park Q1 FY 24 25.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jindal Park Q1 FY 24 25.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jindal Park FY 23 24 Q4_compressed.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 A2.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jindal Park.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A A2.pdf10 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A A2.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 9A 10 Q3 FY 23 24 compressed.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Jindal Park Q3 FY 23 24.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A2 Form 3 Q3 FY 23 24_compressed.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 9A And 10.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE 27-09-2023_compressed.pdf2 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jindal Park 30 09 23_compressed.pdf2 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 JIndal Park FY 22 23.pdf19 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 9A 10 30 06 23_compressed.pdf6 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE 29-06-2023_compressed.pdf5 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 9A 10 30 06 23.pdf5 Jul 2023
Disclosure of sold/ booked inventoryFile: A2 sold unsold 30 06 23.pdf5 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Jindal Park.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jindal Park 040423.pdf8 Apr 2023
Deviation Report with respect to model copy of AgreementFile: RERA Agreement to Sale 9A And 10 Highlighted.pdf15 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agg Jindal Park.pdf15 Sep 2022
Details of encumbrances concerned to LegalFile: JIndal Park Legal Encumbrance Revised.pdf9 Sep 2022
CERSAI detailsFile: CERSAI_Search_Report_200246654236_For_Asset_Based_Search_08_09_2022_11_44_31_986.pdf9 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jindal Park_compressed.pdf27 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf25 Aug 2022
Layout approvalFile: Layout Plan_compressed.pdf24 Aug 2022
Building plan approvalFile: Sanction PLan_compressed.pdf24 Aug 2022
PAN CardFile: Simran Pan Card.pdf24 Aug 2022
Copy of the legal title reportFile: Legal Title Report 9A 10compressed.pdf24 Aug 2022
Details of encumbrances concerned to FinanceFile: Letter Finance.pdf24 Aug 2022
Copy of Layout Approval (in case of layout)File: Layout Plan_compressed.pdf24 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction PLan_compressed.pdf24 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 9A 10 compressed.pdf24 Aug 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf24 Aug 2022
Declaration in FORM BFile: Form B_compressed.pdf24 Aug 2022
Proforma of Allotment letterFile: Allotment Letter Jindal Park.pdf24 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Acc Letter.pdf24 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf24 Aug 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Building No.3,Uptown AvenueP52000024151Old Panvel, Raigarh-Jan 2020Certificate SignedDec 2024Jan 1970
Building No 3G No 5 Devad Panvel137-CompletedJul 2016Jul 2016

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jindal Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmJindal ParkCompleted 20Lapsed / revoked 8Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: Simran Enterprises

Simran Enterprises has 5 registrations on MahaRERA, including Building No. 2, Uptown Avenue and Building no. 1 , Uptown Avenue. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Jindal Park is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jindal Park?

The registered promoter entity is Simran Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jindal Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Jindal Park?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Jindal Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jindal Park?

The professionals named in the filing: Architect: AN Arch Neha Jain; Engineer: Adharshila Consultants (Mr.Samarth Agarwal); Chartered Accountant: Mr. Vallabh Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jindal Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jindal Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jindal Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.