Completed No litigation declared Residential / Group Housing project

Building No.3,Uptown Avenue

By Simran Enterprises

RG-MH-21729 · RERA P52000024151 · Last updated on MahaRERA portal: 10 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 50%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Building No.3,Uptown Avenue is a Residential / Group Housing project by Simran Enterprises in Raigarh, Maharashtra, registered with MahaRERA as P52000024151 on 23 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameBuilding No.3,Uptown Avenue
  • TypeResidential / Group Housing
  • Location
    • Sai Nagar
    • Old Panvel
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000024151
  • ReraGenie IDRG-MH-21729

Builder

  • NameSimran Enterprises
  • Entity typePartnership
  • PartnersSachin Omprakash Agarwal, Sagar Sachin Agarwal, Akash Sachin Agarwal
  • Other registrations4 more →
  • Completed5 of 5
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jan 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 3,Uptown AvenueNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

Building No 3,Uptown Avenue: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,628 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11498.0
Proposed, not sanctioned11,498 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchQueen Necklace,PLot no1, Sec 18, Sapada, Navi Mumbai 400705

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastukalp MrSatish Manohar
EngineerYateesh Tare
Chartered AccountantVallabh Joshi
PartnerRole in project
Simran Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Feb 2024

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 P3 FY 23 24_compressed.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 P3 FY 23 24_compressed.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SEP3 FY 23 24 Q4_compressed.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SEp3 Q4 FY 23 24_compressed.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P3.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A P3.pdf10 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A P3.pdf10 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FINAL Occupancy Permission 240131_240201_133459.pdf5 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 P3.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SEP3 21 12 23 compressed.pdf10 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 FY 23 24_compressed.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P3 Form 3 Q3 FY 23 24_compressed.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 P3 Q2 FY 23 24 compressed.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1P3 Q2 FY 23 24_compressed.pdf2 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 P3 Q2 Fy 23 24_compressed.pdf2 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Bldg 3 Uptown FY 22 23.pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P3 30 06 2023_compressed.pdf5 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 P3 29 06 23_compressed.pdf5 Jul 2023
Disclosure of sold/ booked inventoryFile: P3 Sold unsold 30 06 23_compressed (1).pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 P3 30 06 2023_compressed.pdf5 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A SE P3.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P3 1 3 23_compressed.pdf8 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 P3 1 3 23_compressed.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SE P3 28 2 23_compressed.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SE P3 28 2 23_compressed.pdf13 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P3 1 3 23_compressed.pdf6 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 P3 1 3 23_compressed.pdf6 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SEP3 28 10 22_compressed.pdf11 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SEP3 2 11 22_compressed.pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SE P3 Form 5_compressed.pdf13 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SE P3 Form 5_compressed.pdf22 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEP3 Form 1 (5 7 22)_compressed.pdf29 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SE P3 Form 2 (16 7 22)_compressed.pdf29 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: P3, Form 2A.pdf16 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P3_compressed (1).pdf30 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 P3_compressed.pdf30 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 P3 compressed.pdf30 Mar 2022
Building plan approvalFile: 12 14 floor.pdf22 Feb 2022
Building plan approvalFile: 13 floor.pdf22 Feb 2022
Layout approvalFile: Layout.pdf22 Feb 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf22 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 12 14 floor.pdf22 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: 13 floor.pdf22 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Final CC 743_compressed_compressed.pdf19 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form P3.pdf21 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf9 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SE -P3.pdf9 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SE - P3_compressed.pdf9 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A form - P3.pdf2 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Uptown Avenue 2A.pdf14 Apr 2021
Proforma of Allotment letterFile: New SE-P3 Draft.pdf30 Nov 2020
Proforma of Allotment letterFile: New SE-P3 Draft.pdf30 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Bldg No 3 Uptown Avenue compressed.pdf14 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Bldg3.pdf7 Sep 2020
OtherFile: Form 5 Bldg3.pdf7 Sep 2020
Details of Restarting of Construction work post lockdownFile: SE P-3.pdf20 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 743.pdf26 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf21 Jan 2020
OtherFile: Revalidation PMC.pdf20 Jan 2020
OtherFile: Taare revalidation letter.pdf20 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Bldg 3.pdf7 Dec 2019
Layout approvalFile: Scan-0003_compressed.pdf4 Dec 2019
Building plan approvalFile: Scan-0004_compressed.pdf4 Dec 2019
Building plan approvalFile: Scan-0005-compressed.pdf4 Dec 2019
Copy of the legal title reportFile: Title Certi.pdf4 Dec 2019
Details of encumbrancesFile: Details of encumbrance.pdf4 Dec 2019
Copy of Layout Approval (in case of layout)File: Scan-0003_compressed.pdf4 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Scan-0004_compressed.pdf4 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: Scan-0005-compressed.pdf4 Dec 2019
Declaration in FORM BFile: revised Form B_compressed.pdf4 Dec 2019
Proforma of Allotment letterFile: SE-P3 RERA.pdf4 Dec 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Building No 3G No 5 Devad Panvel137CompletedJul 2016Jul 2016

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Building No.3,Uptown Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Old Panvel5,900+ in Raigarh

Builder: Simran Enterprises

Simran Enterprises has 5 registrations on MahaRERA, including Building No. 2, Uptown Avenue and Building no. 1 , Uptown Avenue. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Building No.3,Uptown Avenue is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Building No.3,Uptown Avenue?

The registered promoter entity is Simran Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Building No.3,Uptown Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Building No.3,Uptown Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Building No.3,Uptown Avenue?

The professionals named in the filing: Architect: Vastukalp MrSatish Manohar; Engineer: Yateesh Tare; Chartered Accountant: Vallabh Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Building No.3,Uptown Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Building No.3,Uptown Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Building No.3,Uptown Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.