ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Jindal Enclave

Registered No litigation declared Residential / Group Housing project

Jindal Enclave

By Jindal Builders and Developers

RG-MH-06731 · RERA P52000054516 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 65%
10 of 153Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Jindal Enclave is a Residential / Group Housing project by Jindal Builders and Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000054516 on 25 Jan 2024. Possession is promised by 31 Mar 2027. 143 of the 153 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameJindal Enclave
  • TypeResidential / Group Housing
  • Location
    • Sai Nagar
    • Kasbe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000054516
  • ReraGenie IDRG-MH-06731

Builder

  • NameJindal Builders and Developers
  • Entity typePartnership
  • PartnersSagar Sachin Agarwal, AKASH SACHIN AGARWAL, SACHIN OMPRAKASH AGARWAL
  • Other registrations6 more →
  • Completed3 of 7
  • Declared earlier projects4 →

Key dates

this monthRegisteredJan 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

93%143 of 153 units booked
70.3%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Jindal EnclaveNA871530153

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 65%.

Jindal Enclave: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes35%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes35%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered77

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,862 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jun 2025

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI7372.18
Proposed, not sanctioned7,372 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIDBI Bank, Bhoomiraj Costarica Near Moraj Residency Palm Beach Road, Sector 18, Sanpada Navi Mumbai
Estimated costRs 18.47 cr
Cost incurredRs 12.98 cr
Work done70.27%
BuildingWingEstimatedIncurred
Jindal EnclaveNARs 17.55 crRs 12.79 cr
-NARs 91.90 lakhRs 18.40 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSTAPL Architect Soyuz Talib
ArchitectSTAPL
EngineerSamarth Agarwal
EngineerMADAN KUMAR SHRIVASTAVA
Chartered AccountantVallabh Vijay Joshi & Co
Chartered AccountantNaina Jain
Chartered AccountantSAMARPIT GANESH PINGALE
PartnerRole in project
Jindal Builders and Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 JINDAL ENCLAVE.pdf9 Jul 2026
Withdrawal Update Form 2File: Form 2 Jindal Enclave.pdf9 Jul 2026
Withdrawal Update Form 3File: Form 3 Jindal Enclave.pdf9 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A Jindal Enclave.pdf7 May 2026
Withdrawal Update Form 1File: Jindal Enclave Form 1.pdf8 Apr 2026
Withdrawal Update Form 2File: FORM 2 JINDAL ENCLAVE.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3 JIndal Enclave.pdf8 Apr 2026
Withdrawal Update Form 1File: Architect Certificate Jindal Enclave.pdf14 Jan 2026
Withdrawal Update Form 2File: JINDAL ENCLAVE Form 2.pdf14 Jan 2026
Withdrawal Update Form 3File: Form 3 Jindal Enclave.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 Jindal Enclave.pdf11 Oct 2025
Withdrawal Update Form 2File: Form-2 Jindal Enclave.pdf11 Oct 2025
Withdrawal Update Form 3File: Form 3 Jindal Enclave.pdf11 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Enclave.pdf22 Sep 2025
Form 1File: Jindal Enclave Form 1 Q4 FY 24-25.pdf21 Jul 2025
Form 2File: Jindal Enclave Form 2 Q4 FY 24-25.pdf21 Jul 2025
Form 3File: Form 3 Jindal Enclave Q4 F Y 24 25.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- Encalve.pdf21 Jul 2025
Withdrawal Update Form 1File: FORM 1 ENCLAVE Q1.pdf21 Jul 2025
Withdrawal Update Form 2File: FORM 2 JINDAL ENCLAVE Q1 25-26.pdf21 Jul 2025
Withdrawal Update Form 3File: Enclave Form 3.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jindal Enclave Form 1 Q4 FY 24-25.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jindal Enclave Form 2 Q4 FY 24-25.pdf9 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Jindal Enclave Form - 2A 31 03 25.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JIndal Enclave Form 1 Q3 FY 24 25Final.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jindal Enclave Form3 Q3 FY 24 25.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jindal Enclave Form 2 Q3 FY 24 25Final.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jindal Enclave Form 3 Sep 24_compressed.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Enclave Q2 FY 24 25.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enclave Q2 FY 24 25_compressed.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Jindal Enclave FY 23 24_compressed.pdf11 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Enclave Q1 FY 24 25_compressed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enclave Q1 FY 24 25.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Jindal Enclave Q1 FY 24 25.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Enclave Q4 FY 23 24_compressed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Jindal Legacy Fy 23 24 Q4.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jindal Enclave FY 23 24 Q4.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jindal Legacy.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jindal Enclave.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Jindal Enclave 31 03 24.pdf15 Apr 2024
Proforma of Agreement for saleFile: RERA Agg 744-1B(3) 16 12 23 (1).pdf18 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Devitation Report Jindal Enclave_compressed-compressed.pdf18 Dec 2023
Layout approvalFile: Sheet 3.pdf23 Oct 2023
Layout approvalFile: Sheet 3.pdf23 Oct 2023
Copy of the legal title reportFile: Index 2 _Jindal Enclave.pdf23 Oct 2023
Copy of the legal title reportFile: Index 2 _Jindal Enclave.pdf23 Oct 2023
Copy of Layout Approval (in case of layout)File: Sheet 3.pdf23 Oct 2023
Copy of Layout Approval (in case of layout)File: Sheet 3.pdf23 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Jindal Enclave.pdf23 Oct 2023
Declaration about Commencement CertificateFile: Format D.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Enclave.pdf23 Oct 2023
Layout approvalFile: Scan-004_compressed.pdf16 Sep 2023
Layout approvalFile: Scan-005_compressed.pdf16 Sep 2023
Copy of Layout Approval (in case of layout)File: Scan-004_compressed.pdf16 Sep 2023
Copy of Layout Approval (in case of layout)File: Scan-005_compressed.pdf16 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Report_Akash Agarwal.pdf16 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sagar Agarwal.pdf16 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sachin Agarwal.pdf16 Sep 2023
Building plan approvalFile: CC Jindal Enclave_compressed.pdf14 Sep 2023
Layout approvalFile: Scan-001-compressed_compressed (1).pdf14 Sep 2023
Layout approvalFile: Scan-002_compressed.pdf14 Sep 2023
PAN CardFile: pan card.pdf14 Sep 2023
Copy of the legal title reportFile: Title Report.pdf14 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrance.pdf14 Sep 2023
Details of encumbrances concerned to LegalFile: Encumbrance.pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: Scan-001-compressed_compressed (1).pdf14 Sep 2023
Copy of Layout Approval (in case of layout)File: Scan-002_compressed.pdf14 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: CC Jindal Enclave_compressed.pdf14 Sep 2023
Declaration in FORM BFile: Form - B Jindal Enclave.pdf14 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Jindal Enclave.pdf14 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jindal Enclave Form -2.pdf14 Sep 2023
CERSAI detailsFile: CERSAI Report - Jindal Enclave.pdf14 Sep 2023
Proforma of Allotment letterFile: Maharera Allotment letter Jindal Enclave.pdf14 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Separate Bank Details - Jindal Enclave.pdf14 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation Report.pdf14 Sep 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Jindal LegacyP52000054929Sai Nagar, Raigarh189Feb 2024Certificate SignedMar 2027Jan 1970
Jindal ImperiaP52000053510Kasbe, Raigarh133Nov 2023Certificate SignedMar 2027Jan 1970
Jindal AvenueP52000031962PANVEL, Raigarh-Nov 2021Certificate SignedDec 2024Jan 1970

How this compares with Raigarh

93%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jindal Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kasbe5,900+ in Raigarh

2 kmJindal EnclaveCompleted 172Lapsed / revoked 63Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 388 registered projects within 2 km.

Builder: Jindal Builders and Developers

Jindal Builders and Developers has 7 registrations on MahaRERA, including JINDAL RESIDENCY and Sakasi Park III. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Jindal Enclave is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jindal Enclave?

The registered promoter entity is Jindal Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jindal Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jindal Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jindal Enclave?

The professionals named in the filing: Architect: STAPL Architect Soyuz Talib; Architect: STAPL; Engineer: Samarth Agarwal; Engineer: MADAN KUMAR SHRIVASTAVA; Chartered Accountant: Vallabh Vijay Joshi & Co; Chartered Accountant: Naina Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jindal Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jindal Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jindal Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.